Supply Chain Management

Slides:



Advertisements
Similar presentations
Statistical Inventory control models I
Advertisements

Dr. A. K. Dey1 Inventory Management, Supply Contracts and Risk Pooling Dr. A. K. Dey.
Determining the Optimal Level of Product Availability
Supply Chain Management
Managing Uncertainty in the Supply Chain: Safety Inventory
Inventory Management for Independent Demand Chapter 12, Part 2.
Inventory Management.
Inventory Control Chapter 17 2.
OPSM 301 Operations Management Class 16: Inventory Management: safety inventory Koç University Zeynep Aksin
OM&PM/Class 5b1 1Operations Strategy 2Process Analysis 3Lean Operations 4Supply Chain Management –Class 5a: Inventories & Economies of Scale –Class 5b:
1 Part II: When to Order? Inventory Management Under Uncertainty u Demand or Lead Time or both uncertain u Even “good” managers are likely to run out once.
CHAPTER 9 Inventory Management. © 2008 Prentice Hall 9-2 Learning Objectives F To determine the costs of holding inventory F To identify the costs associated.
Supply Chain Logistics Management
Other Inventory Models 1. Continuous Review or Q System 2 The EOQ model is based on several assumptions, one being that there is a constant demand. This.
Managing Uncertainty in a Supply Chain: Safety Inventory
INVENTORY MANAGEMENT Chapter Twenty McGraw-Hill/Irwin
1 5 Inventory Concepts.
Chapter 9 Inventory Management.
PowerPoint presentation to accompany Chopra and Meindl Supply Chain Management, 5e Global Edition 1-1 Copyright ©2013 Pearson Education. 1-1 Copyright.
Managing Inventory throughout the Supply Chain
Inventory Control Models
Operations Management Inventory Management Chapter 12 - Part 2
Supply Chain Management
Supply Chain Management Lecture 27. Detailed Outline Tuesday April 27Review –Simulation strategy –Formula sheet (available online) –Review final Thursday.
11-1 Managing Uncertainty in the Supply Chain: Safety Inventory Supply Chain Management.
INDR 343 Problem Session
Supply Chain Management Lecture 18. Outline Today –Chapter 10 3e: Sections 1, 2 (up to page 273), 6 4e: Sections 1, 2, 3 (up to page 260) Thursday –Finish.
Supply Chain Management Lecture 19. Outline Today –Finish Chapter 10 –Start with Chapter 11 Sections 1, 2, 3, 7, 8 –Skipping 11.2 “Evaluating Safety Inventory.
Inventory Management for Independent Demand
CHAPTER 7 Managing Inventories
PowerPoint presentation to accompany Chopra and Meindl Supply Chain Management, 5e Global Edition 1-1 Copyright ©2013 Pearson Education. 1-1 Copyright.
OMSAN LOJİSTİK Fundamentals and Terminology of Inventory Planning and Management Inventory Planning and Management Latin America Logistics Center Logistics.
Chapter 12: Determining the Optimal Level of Product Availability
Inventory Management.
Slides 2 Inventory Management
INVENTORY IS BAD. DIRECT FINANCIAL EFFECTS Pay money to get Place to Store Equipment to move DAMAGE - OBSOLESCENCE INCREASED CYCLE TIME Less flexibility.
McGraw-Hill/Irwin © 2003 The McGraw-Hill Companies, Inc., All Rights Reserved. 1 Independent Demand Inventory Management Systems.
Copyright 2011 John Wiley & Sons, Inc. Chapter 9 Inventory Management 9-1.
When to re-order with EOQ Ordering
Economic Order Quantity The economic order quantity (EOQ) is the fixed order quantity (Q) that minimizes the total annual costs of placing orders and holding.
Independent Demand Inventory Planning CHAPTER FOURTEEN McGraw-Hill/Irwin Copyright © 2011 by the McGraw-Hill Companies, Inc. All rights reserved.
Managing Uncertainty in Supply Chain: Safety Inventory Spring, 2014 Supply Chain Management: Strategy, Planning, and Operation Chapter 11 Byung-Hyun Ha.
CHAPTER 9 Inventory Management.
Supply Chain Management
Chapter 8 Inventory Management. Learning Objectives To learn about the ways that inventory can be classified To discuss inventory costs and the trade-offs.
Inventory Models in SC Environment By Debadyuti Das.
© 2007 Pearson Education 11-1 Chapter 11 Managing Uncertainty in the Supply Chain: Safety Inventory Supply Chain Management (3rd Edition)
Inventory Management for Independent Demand Chapter 12.
Chapter 11 Managing Inventory throughout the Supply Chain
Northern Illinois University Department of Technology Shun Takai
Operations Fall 2015 Bruce Duggan Providence University College.
CHAPTER 6 Inventory Management. Copyright © 2001 by The McGraw-Hill Companies, Inc. All rights reserved.McGraw-Hill/Irwin 6-2 Purposes of Inventory Enables.
CHAPTER 8 Inventory Management © Pearson Education, Inc. publishing as Prentice Hall.
McGraw-Hill/Irwin  The McGraw-Hill Companies, Inc. 2007, All Rights Reserved Independent-Demand Inventory Chapter 15.
13-1 Copyright ©2013 Pearson Education, Inc. publishing as Prentice Hall. Course Code MGT 561 Supply Chain Management Book: Supply Chain Management Strategy,
Copyright © 2015 Pearson Education, Inc.
OPSM 301 Operations Management
Inventory Models (II) under SC environment
OUTLINE Questions, Comments? Quiz Target Comments Go over homework
Chapter 11 Managing Uncertainty in the Supply Chain: Safety Inventory
Managing Uncertainty in the Supply Chain: Safety Inventory
Chapter 12 Managing Uncertainty in the Supply Chain: Safety Inventory
Random Demand: Fixed Order Quantity
Chapter 12 Determining the Optimal Level of Product Availability
Managing Uncertainty in a Supply Chain: Safety Inventory
Managing Economies of Scale in a Supply Chain Cycle Inventory
Slides by John Loucks St. Edward’s University.
EOQ Inventory Management
Presentation transcript:

Supply Chain Management SYST 4050 Slides Supply Chain Management Lecture 20 Chapter 3

Outline Today Thursday Friday Chapter 11 Homework 4 due before class SYST 4050 Slides Outline Today Chapter 11 Sections 1, 2, 3, 7, 8 Skipping 11.2 “Evaluating Safety Inventory Given Desired Fill rate” Thursday Homework 4 due before class Chapter 12 Sections 12.1, 12.2 up to and including Example 12.2, 12.3 Friday Homework 5 online Due Thursday April 8 before class Chapter 3

Email: Ann.Richmond@colorado.edu SYST 4050 Slides Staples Visit Date Friday April 2, 10:30am – 2:30pm (11:30am – 1:30pm on site, the rest in transit) Free transportation Location Staples fulfillment Center, Brighton, CO What Lunch and Learn Email: Ann.Richmond@colorado.edu Chapter 3

Effective inventory management is key to running a profitable business SYST 4050 Slides Summary Inventory is an asset, but it's also a liability until it has been sold Inventory is cash in-transit Inventory does not improve with time. Inventory becomes less valuable with every passing day It takes space, heat, light, power, handling, insurance, interest to carry, … Effective inventory management is key to running a profitable business Chapter 3

Apple beats competitors at inventory turn over SYST 4050 Slides Inventory Management Apple beats competitors at inventory turn over Source: The Mac Observer, March 5, 2009 Chapter 3

Summary Lot sizing for a single product SYST 4050 Slides Summary Lot sizing for a single product Economic order quantity Lot sizing with multiple products (complete aggregation) Find order frequency (same for all products) Calculate order quantity for each product Q = D/n Chapter 3

Safety Inventory Inventory Demand (D) Order quantity/lot size (Q) SYST 4050 Slides Safety Inventory Inventory Demand (D) Order quantity/lot size (Q) Cycle Inventory Average Inventory Safety Inventory Time Cycle Chapter 3

Example 11-1: Evaluating safety inventory given an inventory policy SYST 4050 Slides Example 11-1: Evaluating safety inventory given an inventory policy Assume that weekly demand for Palms at B&M Computer World is normally distributed, with a mean of 2,500 and a standard deviation of 500. The manufacturer takes two weeks to fill an order placed by the B&M manager. The store manager currently orders 10,000 Palms when the inventory drops to 6,000. Evaluate the safety inventory carried by B&M and the average inventory carried by B&M. Also evaluate the average time spent by a Palm at B&M Chapter 3

Demand during lead time DL = LD SYST 4050 Slides Safety Inventory Inventory Demand (D) Order quantity/lot size (Q) Reorder point (ROP) Cycle Inventory Average Inventory Safety Inventory Time Lead time (L) Cycle Demand during lead time DL = LD Chapter 3

Example 11-1: Evaluating safety inventory given an inventory policy SYST 4050 Slides Example 11-1: Evaluating safety inventory given an inventory policy Inventory 11,000 Order quantity/Lot size 6,000 Reorder point Demand during lead time Safety Inventory 1,000 Time Lead time Cycle Chapter 3

Example 11-1: Evaluating safety inventory given an inventory policy SYST 4050 Slides Example 11-1: Evaluating safety inventory given an inventory policy Reorder point (ROP) = demand during lead time + safety inventory = DL + ss Average flow time = (avg. inventory) / (avg. demand) ROP = DL + ss Chapter 3

Role of Safety Inventory SYST 4050 Slides Role of Safety Inventory There is a fundamental tradeoff Raising the level of safety inventory provides higher levels of product availability and customer service Raising the level of safety inventory also raises the level of average inventory and therefore increases holding costs Product availability reflects a firm’s ability to fill a customer order out of available inventory Chapter 3

Measuring Product Availability SYST 4050 Slides Measuring Product Availability Cycle service level (CSL) Fraction of replenishment cycles that end with all customer demand met Probability of not having a stockout in a replenishment cycle Product fill rate (fr) Fraction of demand that is satisfied from product in inventory Probability that product demand is supplied from available inventory Order fill rate Fraction of orders that are filled from available inventory Product availability reflects a firm’s ability to fill a customer order out of available inventory. A stockout results if a customer order arrives when product is not available. Chapter 3

CSL and fr are different! SYST 4050 Slides CSL and fr are different! inventory CSL is 0%, fill rate is almost 100% time CSL is 0%, fill rate is almost 0% inventory time Chapter 3

SYST 4050 Slides Example 11-2: Evaluating cycle service level given a replenishment policy Weekly demand for Palms is normally distributed, with a mean of 2,500 and a standard deviation of 500. The replenishment lead time is two weeks. Assume that the demand is independent from one week to the next. Evaluate the CSL resulting from a policy of ordering 10,000 Palms when there are 6,000 Palms in inventory Chapter 3

= Prob(demand during lead time  ROP) SYST 4050 Slides Example 11-2: Evaluating cycle service level given a replenishment policy CSL = Prob(of not stocking out in a cycle) Inventory = Prob(demand during lead time  ROP) 11,000 6,000 Reorder point 1,000 Time Lead time Chapter 3

Measuring Demand Uncertainty SYST 4050 Slides Measuring Demand Uncertainty Inventory Demand (D) Order quantity/lot size (Q) Reorder point (ROP) Cycle Inventory Average Inventory Safety Inventory Time Lead time (L) Cycle Demand during lead time DL = LD Standard deviation of demand over lead time L = (L)D Chapter 3

SYST 4050 Slides Example 11-2: Evaluating cycle service level given a replenishment policy mean D = 500 D = 2500 stdev DL = LD = 2 x 2500 = 5000 L = L D = 2 x 500 = 707 mean stdev CSL = Prob(demand during lead time  ROP) Chapter 3

SYST 4050 Slides Example 11-2: Evaluating cycle service level given a replenishment policy mean D = 500 D = 2500 stdev DL = LD = 2 x 2500 = 5000 L = L D = 2 x 500 = 707 mean stdev CSL = Prob(demand during lead time  ROP) CSL = F(ROP,DL,L) Chapter 3

F(ROP, DL, L) = NORMDIST(ROP, DL, L, 1) SYST 4050 Slides Example 11-4: Evaluating safety inventory given a desired service level Average demand during lead time DL = Standard dev. of demand during lead time L = Cycle service level CSL = LD = 2*2,500 = 5,000 SQRT(L)D = SQRT(2)*500 = 707 F(ROP, DL, L) = F(6000, 5000, 707) = 0.92 F(ROP, DL, L) = NORMDIST(ROP, DL, L, 1) Chapter 3

SYST 4050 Slides Example 11-4: Evaluating safety inventory given a desired service level Weekly demand for Lego at a Wal-Mart store is normally distributed, with a mean of 2,500 boxes and a standard deviation of 500. The replenishment lead time is two weeks. Assuming a continuous-review replenishment policy, evaluate the safety inventory that the store should carry to achieve a CSL of 90 percent. Chapter 3

CSL = F(ROP,DL,L) ROP = F-1(CSL,DL,L) SYST 4050 Slides Example 11-4: Evaluating safety inventory given a desired service level mean D = 500 D = 2500 stdev DL = LD = 2 x 2500 = 5000 L = L D = 2 x 500 = 707 mean stdev CSL = Prob(demand during lead time  ROP) CSL = F(ROP,DL,L) ROP = F-1(CSL,DL,L) Chapter 3

F-1(CSL, DL, L) = NORMINV(CSL, DL, L) SYST 4050 Slides Example 11-4: Evaluating safety inventory given a desired service level Average demand during lead time DL = Standard dev. of demand during lead time L = Desired cycle service level CSL = Safety inventory ss = LD = 2*2,500 = 5,000 SQRT(L)D = SQRT(2)*500 = 707 0.90 Option 1: ROP = F-1(CSL, DL, L) = F-1(0.90, 5000, 707) = 5,906 ss = ROP – DL = 5906 – 5000 = 906 F-1(CSL, DL, L) = NORMINV(CSL, DL, L) Chapter 3

Source: Operations Management, J. Heizer and B. Render SYST 4050 Slides Ethical Dilemma Wayne Hills Hospital in Wayne, Nebraska, faces a problem common to large urban hospitals, as well as to small remote ones as itself. That problem is deciding how much of each type of whole blood to keep in stock. Because blood is expensive and has a limited shelf life, Wayne Hills naturally wants to keep its stocks as low as possible. Unfortunately, past disasters such as a major tornado and a train wreck demonstrated that lives would be lost when not enough blood was available to handle massive needs. Source: Operations Management, J. Heizer and B. Render Chapter 3

Summary Average Inventory = Q/2 + ss L: Lead time for replenishment SYST 4050 Slides Summary L: Lead time for replenishment D: Average demand per unit time D:Standard deviation of demand per period DL: Average demand during lead time L: Standard deviation of demand during lead time CSL: Cycle service level ss: Safety inventory ROP: Reorder point Notes: Average Inventory = Q/2 + ss Chapter 3

Safety Inventory ROP = F-1(CSL,DL,L) ROP – DL = F-1(CSL,0,L) SYST 4050 Slides Safety Inventory What actions can be taken to improve product availability without hurting safety inventory? ROP = F-1(CSL,DL,L) ROP – DL = F-1(CSL,0,L) (ROP – DL)/L = F-1(CSL,0,1) ss/L = Fs-1(CSL) ss = Fs-1(CSL)L Chapter 3

SYST 4050 Slides Safety Inventory Why is it that successful retailers and manufacturers (i.e. Wal-Mart, Seven-Eleven Japan, Dell) carry only little inventory but still have high levels of product availability? Chapter 3

Measuring Product Availability SYST 4050 Slides Measuring Product Availability Cycle service level (CSL) Fraction of replenishment cycles that end with all customer demand met Probability of not having a stockout in a replenishment cycle Product fill rate (fr) Fraction of demand that is satisfied from product in inventory Probability that product demand is supplied from available inventory Order fill rate Fraction of orders that are filled from available inventory Product availability reflects a firm’s ability to fill a customer order out of available inventory. A stockout results if a customer order arrives when product is not available. Chapter 3

Product Fill Rate fr = 1 – 10/1000 = 1 – 0.01 = 0.99 Q = 1000 ESC = 10 SYST 4050 Slides Product Fill Rate inventory fr = 1 – 10/1000 = 1 – 0.01 = 0.99 Q = 1000 time ESC = 10 inventory fr = 1 – 970/1000 = 1 – 0.97 = 0.03 time Q = 1000 ESC = 970 Chapter 3

Expected Shortage per Replenishment Cycle SYST 4050 Slides Expected Shortage per Replenishment Cycle Expected shortage during the lead time If demand is normally distributed Does ESC decrease or increase with ss? Does ESC decrease or increase with L? Chapter 3

SYST 4050 Slides Product Fill Rate fr: is the proportion of customer demand satisfied from stock. Probability that product demand is supplied from inventory. ESC: is the expected shortage per replenishment cycle (is the demand not satisfied from inventory in stock per replenishment cycle) ss: is the safety inventory Q: is the order quantity ESC is expressed in number of products (not a probability) that is not satisfied from inventory. Hence, ESC/Q is the fraction of demand (Q = the average demand per replenishment cycle) that is not satisfied from inventory/stock. Fill rate is the opposite, hence fr = 1 – ESC/Q. Chapter 3

Example 11-3: Evaluating fill rate given a replenishment policy SYST 4050 Slides Example 11-3: Evaluating fill rate given a replenishment policy Recall that weekly demand for Palms at B&M is normally distributed, with a mean of 2,500 and a standard deviation of 500. The replenishment lea time is two weeks. Assume that the demand is independent from one week to the next. Evaluate the fill rate resulting from the policy of ordering 10,000 Palms when there are 6,000 Palms in inventory. Chapter 3

Example 11-3: Evaluating fill rate given a replenishment policy SYST 4050 Slides Example 11-3: Evaluating fill rate given a replenishment policy Lot size Q = Average demand during lead time DL = Standard dev. of demand during lead time L = Expected shortage per replenishment cycle ESC = Product fill rate fr = 10,000 LD = 2*2,500 = 5,000 SQRT(L)D = SQRT(2)*500 = 707 -ss(1-Fs(ss/L))+Lfs(ss/L) = -1000*(1-Fs(1,000/707) + 707fs(1,000/707) = 25.13 1 – ESC/Q = 1 – 25.13/10,000 = 0.9975 Chapter 3

Cycle Service Level versus Fill Rate SYST 4050 Slides Cycle Service Level versus Fill Rate What happens to CSL and fr when the safety inventory (ss) increases? What happens to CSL and fr when the lot size (Q) increases? Chapter 3

Managing Inventory in Practice SYST 4050 Slides Managing Inventory in Practice India’s retail market Retail market (not inventory) projected to reach almost $308 billion by 2010 Due to its infrastructure (many mom-and-pop stores and often poor distribution networks) lead times are long ss = Fs-1(CSL)L Chapter 3

Managing Inventory in Practice SYST 4050 Slides Managing Inventory in Practice Department of Defense DOD reported (1995) that it had a secondary inventory (spare and repair parts, clothing, medical supplies, and other items) to support its operating forces valued at $69.6 billion About half of the inventory includes items that are not needed to be on hand to support DOD war reserve or current operating requirements MRO Maintenance Repair and Operations DoD mandates RFID Chapter 3