State Technical Committee Meeting August 28, 2013 Ritch Nelson – State Wildlife Biologist.

Slides:



Advertisements
Similar presentations
Drainage Setback Tables Minnesota Wetlands Conference January 30, 2013
Advertisements

Division of State Lands’ Wetlands Program. Issues That Spawned State Wetlands Program (SB 3) Lack of detailed wetlands inventory information or guidance.
Nebraska’s EQIP Special Initiative: Using EQIP to meet resource needs identified in Nebraska’s State Wildlife Action Plan Tim McCoy, Ag Program Manager,
Wetland Conservation Compliance
1 Certification of Compliance with New Meal Pattern Requirements.
Practice – CP-39 Farmable Wetland Program Constructed Wetland.
Wetland and Riparian Mapping in Montana Karen Newlon, Montana Natural Heritage Program Helena, MT Montana Wetland Council University of Montana-Missoula.
[INSERT APPLICABLE REGIONAL ENTITY NAME/LOGO] [ENTITY NAME] [FUNCTION CERTIFYING] Certification [LOCATION] – [DATES OF ON-SITE VISIT] [Presenter Name,
How Do I Know If There Is a Wetland Where I Want To Build? James Robb, Chief Wetlands & Storm Water Section Indiana Department of Environmental Management.
An overview of Wetland Delineation In preparation for next week’s field trip.
Suzanne Macey.  DEC looks at known occurrences with 1 mile  FWS looks at known occurrences plus the potential for suitable habitat  Contact DEC and/or.
Hillsborough County Property Goffstown, NH Wetland Inventory Fall 2007.
Environmental Consultants BMI Environmental Services, LLC AN OVERVIEW OF THE WETLANDS REGULATORY PROCESS AS IT RELATES TO THE PROPOSED OCEAN SPRINGS HIGH.
Tile Drainage on Cropland-Implications for Wetland Compliance
HEL Conservation Compliance Beth A Schuler National Highly Erodible Land Specialist, Conservation Operations Division.
Using the Best Science to Estimate Consumptive Use March 12, 2010.
REQUEST FOR PROPOSALS RFP #08-56 Project Management and Procurement Assistance Consultant for an Intelligent Transit System Solution (I.T.S.S.) October.
BIG Process Flow Annexure A1. Call for Proposals Opens Call for Proposals Closes BIG Partners assigned proposals to review Preliminary screening by BIG.
Mobile Technology for Real Property Assessment Tax Assessor’s Office Davie County, North Carolina.
Digital Wetlands of Southwestern Pennsylvania Presenter:Samuel M. Zehel Jr. California University of PA Wetlands are a sparse but important feature of.
LRI Validation Suite Meeting November 1st, Agenda Review of LIS Test Plan Template CLIA Testing EHR testing (Juror Document)—Inspection Testing.
n U.S. Department of Agriculture Natural Resources Conservation Service National Plant Data Team (NPDT) NRCS: A repository of plant data P lant L ist.
Jeremy Erickson, Lucinda B. Johnson, Terry Brown, Valerie Brady, Natural Resources Research Institute, University of MN Duluth.
1 | WEATHERIZATION ASSISTANCE PROGRAM STANDARDIZED CURRICULUM – September 2012 eere.energy.gov In-Progress Monitoring and Inspecting QUALITY CONTROL INSPECTOR.
SPDES General Permit for Stormwater Discharges During Construction Activity GP Mike Jurkowski, CPESC, NYSDOT - Summary of Changes From GP
“Community Benefits of Earth Science” SPECIAL WASTE COMMITTEE MEETING of the California Integrated Waste Management Board FEBRUARY 9, 2005 Presented by.
IS-700.A: National Incident Management System, An Introduction
Loss Control Program Compliance Audits An overview of the purpose and procedures of program auditing.
Technical Considerations on the Quantifiability of Wood Smoke Health Impacts Regional Technical Forum November 18, 2014.
1:2,400 Scale Hydrography Data Integration with NHD
FY 2007 Conservation Reserve Program (CRP). Conservation Reserve Program Topics Agency Roles and Responsibilities Agency Roles and Responsibilities CRP.
11 SECURITY TEMPLATES AND PLANNING Chapter 7. Chapter 7: SECURITY TEMPLATES AND PLANNING2 OVERVIEW  Understand the uses of security templates  Explain.
California Rapid Assessment Method for Wetlands (CRAM) Project and Ambient Assessments.
October 30, 2007 TSP Pre-Planning Meeting & Information.
North Carolina White Oak River Basin Plan December 19, 2000.
Ground-Truthing the Habitat Inventory for the Fraser River: Status Report and Lessons Learned March 2007 Fraser River Estuary Management Program.
Wetlands Analysis and Assessment Mapper (WAAM) NCRST-E Meeting August 7, 2002 Soils Hydrology Vegetation.
Wetland Monitoring What Do We Need? Integration of Wetland Monitoring and Wetland Management Wetlands and Waterways Program Maryland Dept. of the Environment.
The New Public Assistance ProgramOV-1 Objectives  Describe the purpose of the New Public Assistance Program  Identify the components of the New Public.
Preliminary Development Plan – Continuation of August 28, 2012 BoCC Hearing Board of County Commissioners September 18, 2012.
ODOT Programmatic ESA Consultation on the Federal-Aid Highway Program (FAHP) User’s Guide Training, June-July 2013 Roles & Responsibilities Project Biologist.
Michael Cagle and Holly Langer-Evans | Nov U.S. Department of Education 2012 Fall Conference FSA Assessments: Find It, Fix It, and Enhance Compliance.
Water Rights Website Toolbox March 12, 2007 Boyd Clayton
Former DuPont Barksdale Works Project Update December 14, 2004 DuPont Corporate Remediation Group Great Lakes Visitors Center.
North Carolina Tar-Pamlico River Basin Plan Final Scoping Meetings January 30 and 31, 2001.
Technology Application Partners for NCRST-E NCRST-E Fall 2001 Advisory Board Meeting.
The Delineation and Monitoring of the McWilliams Farm Replacement Wetland Area in Southern York County Patrick Fetich – Department of Biology, York College.
JWMP Update Draft Report Bosworth Botanical Consulting Team.
United States Department of Agriculture Natural Resources Conservation Service Technical Soil Services Activity Reporting Michael Robotham National Leader.
UNIT 13 – Monitoring & Compliance Monitoring and Compliance UNIT 13.
UNIT 13 – Monitoring & Compliance Monitoring and Compliance UNIT 13.
2011 ReliabilityFirst 693 Compliance Audit Process for 6 Year Audit Cycle Entities Glenn Kaht Senior Consultant - Compliance ReliabilityFirst Corporation.
[Hayes, Dassen, Schilder and Wallage, Principles of Auditing An Introduction to ISAs, edition 2.1] © Pearson Education Limited 2007 Slide 5.1 Client Acceptance.
Water Management Options Analysis Sonoma Valley Model Results Sonoma Valley Technical Work Group October 8, /08/2007.
Village of Naples and Hazlitt 1852 Vineyards Sewer Feasibility Study.
Experience ∙ Innovation · Results CALCASIEU PARISH – SABINE RIVER AND BAYOU LACASSINE BASINS STORMWATER MASTER PLAN Engineers ∙ Surveyors · Environmental.
March 23, SPECIAL EDUCATION ACCOUNTABILITY REVIEWS.
Statewide Access Update August 18, 2010 Ohio Department of Health Office of Vital Statistics.
RURAL POTABLE WATER INFRASTRUCTURE WATERLINE AND TRUCKFILLS
EASTERN MOUNTAINS and PIEDMONT REGIONAL SUPPLEMENT
8.3 Control Quality The process of monitoring and recording results of executing quality activities to assess performance and recommend necessary change.
Factsheet # 12 Understanding multiscale dynamics of landscape change through the application of remote sensing & GIS Land use/land cover (LULC) from high-resolution.
North Carolina Lumber River Basin Plan
CAEP Orientation: Newcomers
Urban Tree Canopy: Assessing the Community Forest
[INSERT APPLICABLE REGIONAL ENTITY NAME/LOGO]
United Nations Regional Workshop on the 2020 World Programme
Baseline Household Survey (CAPI) High-frequency Data Collection (CATI)
Drain office uses for LiDAR
Functions/Tasks of GIS:Data Input
Presentation transcript:

State Technical Committee Meeting August 28, 2013 Ritch Nelson – State Wildlife Biologist

National policy issued to allow State Conservationist to use an “off-site” wetland delineation procedure in limited instances: On-site visit is not required on actively managed cropland and pastureland where adequate “tools” exist to make an off-site determination On-site visits are required in the following instances: Off-site information is not adequate to make the call Producer requests an on-site determination A minimal effect determination is being made If there is an “appeal” by the producer Prior to withholding any benefits resulting from conversion

Current policy in NE only allows for off-site on fields entirely Non-Wetland (NW) using a number of tools to screen for possible wetlands Determine scenarios where wetlands and their boundaries could be delineated using these same off-site tools

Current Nebraska NRCS procedures require that a site visit be required where evidence of wetlands are present in the field/tract. Hydric soils data Aerial image “footprints” Old NWI maps

Requests for Certified Wetland Determinations have nearly tripled from 2010 to 2012 (1,006 to 2,704) and 2013 requests are on pace to surpass 2012 (1,850 through Feb.) In 2012, approximately 38 mitigation plans and 89 minimal effect agreements

Good Faith requests through FSA increased: 2010 = = = = 21 Consultant Developed Mitigation Plans increased: 2009 = and 2011 = 3 each 2012 = = 8 proposals

“Separation of Duties” requirements have increased time spent on wetland calls starting in October of 2012 – primarily due to travel time and logistics of making determinations in an unfamiliar county (location, soils, available resources, etc.)

Complexity of determinations is much higher than 5 or 10 years ago due to changes in procedures (new plant list, mapping procedures, etc.) as well as documentation requirements (Appeal hearing results, proper quality review process, etc.)

Using aerial photography (minimum of 10 years) to verify presence or absence of wetland signatures If 3 of 10, or less show signatures (NW or PC) More than 6 of 10 show signatures (W or FW) In Between? > Requires a field visit to verify ONLY APPLIES TO PRELIMINARY DETERMINATIONS!

Access to Historic Photos Historic Signatures, Pre-Manipulated Condition “Real Time” Satellite Images Access via Internet Old Paper Copy Soil Survey Books Spot Symbols, Drainages NWI Maps Color Infra-Red Photos

Sites to be sod-busted where wetland signatures obscured by tree cover Fields with multiple wetlands where at least one wetland requires field visit (30% to 60%)

HYDROLOGY ELEMENTS Modify precipitation charts to clarify wet-dry-normal periods by month/year Standardize selection of weather stations based on location of wetland site Finalize the technical note on tile installation and standardize lateral effect information Develop Scope and Effect worksheets for pits, tile, pumping, and make updates to existing ditch worksheet

SOILS AND GIS ELEMENTS Corrections to soils database with hydric inclusions and screening process Scanned FSA slides and historic photos LiDAR coverage for Nebraska Common data layer with certified wetland determinations mapped

WETLAND VEGETATION AND FUNCTIONAL ASSESSMENT ELEMENTS Develop methods to search new plant list for common name, prior scientific names, etc. Increase availability of plant field guides and wetland plant in-field training sessions Complete edits to existing wetland functional assessment methods (terminology and comments) Provide standard mitigation plans for different wetland types and conversion scenarios

Gain input on the issue from the State Technical Committee Test methods on different wetland situations and conduct quality review in Fall of 2013 Inform workgroup of wetland partners in Nebraska of details Adapt existing Off-Site Methods from Iowa and South Dakota to Nebraska circumstances Issue policy and procedure and provide training for staff to apply the new process

East – only 1/3 rd of the requests would qualify for off-site due to tree cover or a wetland signature in the “middle” North and South – maybe 50% of sites could use off-site on a portion of the wetlands (typically larger fields) Current estimates for off- site is an average of 4 hours per determination This would increase (since not just doing NW calls) to approximately 8 hours per determination Current on-site estimate is 12 hours per call (does this account for travel?)