CW RF System for the ATLAS Efficiency and Beam Intensity Upgrade Speaker: Yong Luo, Physics Division, ANL On Behalf of: Sergey Sharamentov, Peter Ostroumov,

Slides:



Advertisements
Similar presentations
RFQ Tuning and RFQ Control Status
Advertisements

Tom Powers Practical Aspects of SRF Cavity Testing and Operations SRF Workshop 2011 Tutorial Session.
Operation of the ATLAS Superconducting Accelerator for Heavy Ions Matthew Hendricks ATLAS Operations Supervisor October 27, 2014.
Areal RF Station A. Vardanyan RF System The AREAL RF system will consist of 3 RF stations: Each RF station has a 1 klystron, and HV modulator,
Areal RF Station A. Vardanyan RF System The AREAL RF system will consist of 3 RF stations: Each RF station has a 1 klystron, and HV modulator,
All Experimenters’ Meeting January 09, Accelerator Operation Summary Calendar Week # 51 NuMI Weekly Integrated Intensity 8.81E18 protons BNB Weekly.
ANL HWR Cryomodule Status Update 27 January 2015 Zachary Conway On behalf of the ANL Linac Development Group Argonne National Laboratory Physics Division.
Proton Source Workshop December 7 & 8, 2010 John Reid December 8, 2010.
RF Power R&D David Wildman May10, 2005 Slides “borrowed” from: G. W. Foster, A. Moretti, D. Sun, I. Terechkine, D.Wildman,& D. Wolff.
Linac Front-End R&D --- Systems Integration and Meson Lab Setup
ATLAS Intensity and Efficiency Upgrade ATLAS USERS MEETING Speaker: Mike Kelly Physics Division May 15, 2014.
RFQ Thermal Analysis Scott Lawrie. Vacuum Pump Flange Vacuum Flange Coolant Manifold Cooling Pockets Milled Into Vanes Potentially Bolted Together Tuner.
Technical aspects of the ATLAS efficiency & intensity upgrade Peter N. Ostroumov ATLAS Users Workshop, August 8-9, 2009.
Preliminary design of SPPC RF system Jianping DAI 2015/09/11 The CEPC-SppC Study Group Meeting, Sept. 11~12, IHEP.
February 17-18, 2010 R&D ERL Alex Zaltsman R&D ERL High Power RF Systems Alex Zaltsman February 17-18, 2010 High Power RF Systems.
Fermilab High Intensity Neutrino Source R&D Program - Mission, Status, Plans, and Support Needs - For AD Department Heads March 2007 Bob Webber.
RF Development for ESS Roger Ruber and Volker Ziemann Uppsala Universitet 4 Dec Dec-20091RR+VZ: ESS RF Development.
July LEReC Review July 2014 Low Energy RHIC electron Cooling Sergey Belomestnykh SRF and RF systems.
Anders Sunesson RF Group ESS Accelerator Division
Ding Sun and David Wildman Fermilab Accelerator Advisory Committee
2.1 GHz Warm RF Cavity for LEReC Binping Xiao Collider-Accelerator Department, BNL June 15, 2015 LEReC Warm Cavity Review Meeting  June 15, 2015.
14 th ESLS RF Meeting – Trieste, September 2010 ALBA RF Status 1/28 ALBA RF Status Francis Perez.
Overview and Status of the Fermilab High Intensity Neutrino Source R&D Program Giorgio Apollinari for Bob Webber.
Design Optimization of MEIC Ion Linac & Pre-Booster B. Mustapha, Z. Conway, B. Erdelyi and P. Ostroumov ANL & NIU MEIC Collaboration Meeting JLab, October.
Beam Test status and Plans of the ILC Main LINAC BPM
R.SREEDHARAN  SOLEIL main parameters  Booster and storage ring low level RF system  New digital Booster LLRF system under development  Digital LLRF.
704 MHz warm cavity November 4, 2015 A.Zaltsman: SRF & warm RF components for LEReC1  A single cell 704 MHz warm cavity is used to correct the beam energy.
Comparison of Fermilab Proton Driver to Suggested Energy Amplifier Linac Bob Webber April 13, 2007.
Commissioning of REX Jose Alberto Rodriguez, BE-OP-PSB (167538) on behalf of the ISOLDE operations team.
Other Utilities of ALBA LLRF
Performance analysis of cryogenic system and cryomodules for the complete superconducting linear accelerator at IUAC, New Delhi. T S Datta ( On behalf.
F DOE Annual Program Review High Intensity Neutrino Source R&D in the Meson Detector Building Bob Webber & Giorgio Apollinari September 26, 2007.
The LHC RF Power Systems Skip the intro… CWRF08 workshop - March'08 1 Presented by : Luca Arnaudon Slides by : Olivier Brunner & Luca Arnaudon Important.
Date 2007/Sept./12-14 EDR kick-off-meeting Global Design Effort 1 Cryomodule Interface definition N. Ohuchi.
SPL cryomodule specification meeting, CERN 19th October 2010 SPL cryomodule specification: Goals of the meeting SPL cryomodule specification: Goals of.
CW and High Average Power Workshop BNL The Diamond Storage Ring IOT based High Power Amplifier Morten Jensen on behalf of the SR RF Group.
ESS AD RETREAT 5 th December 2011, Lund “A walk down the Linac” SPOKES Sébastien Bousson IPN Orsay.
650 MHz Solid State RF Power development at RRCAT
CW Cryomodules for Project X Yuriy Orlov, Tom Nicol, and Tom Peterson Cryomodules for Project X, 14 June 2013Page 1.
RF Commissioning D. Jacquet and M. Gruwé. November 8 th 2007D. Jacquet and M. Gruwé2 RF systems in a few words (I) A transverse dampers system ACCELERATING.
Project X High Power 325 MHz RF Distribution and Control Alfred Moretti, Nov 12, 2007 Project X Workshop.
Status of Vertical Test Stand at RRCAT P Shrivastava, P Mohania,D.Baxy, Vikas Rajput S C Joshi, S Raghavendra,S K Suhane RRCAT, Indore November 26, 2012.
PIP Update May Agenda Summary Update – Activities – Budget – Plans Update Slides – Solid StateTom – ModulatorsRene – High Power Ferrite Testing.
K. TAVAKOLI Upgrade of the superconducting RF cavities at soleil K. Tavakoli SOLEIL Synchrotron, France.
SRF Advances for ATLAS and Other 
A CW Linac scheme for CLIC drive beam acceleration. Hao Zha, Alexej Grudiev 07/06/2016.
LLRF for PXIE Brian Chase For the Project X LLRF Collaboration 1 PX Collaboration Meeting, April 2012 Berkeley - B. Chase.
DESIGN STUDY November 28 th - 30 th 2005First EURISOL Design Study TOWN MEETING High Power RF Amplifiers Development at LNL Fabio Scarpa - INFN LNL.
Operation Status of the RF Systems and Taiwan Photon Source
HIE ISOLDE Linac Short Technical Description W. Venturini Delsolaro Material from: L. Alberty, J. Bauche, Y. Leclerq, R. Mompo, D. Valuch, D. Voulot, P.
Areal RF Station A. Vardanyan
The LEP Superconducting RF system has reached its maximum configuration of 288 four-cell cavities powered by 36 klystrons in In 2000, this system,
Solid State Amplifier Development at PSI
Test of the dressed spoke cavity
Observation of Failure Modes of RF Amplifiers at ATLAS
TTC Topical Workshop - CW SRF, Cornell 12th – 14th June 2013
An X-band system for phase space linearisation on CLARA
Physics design on Injector-1 RFQ
Test plan of ESS HB elliptical cavity
Jefferson Lab Low Level RF Controls
Operation experience of cryogenic system and cryomodules for the superconducting linear accelerator at IUAC, New Delhi. T S Datta ( On behalf of Cryogenics.
Tuner system for CEPC MI Zhenghui 2016/09/14
Cost Optimization Models for SRF Linacs
CEPC RF Power Sources System
RF Techniques and Developments at SSRF
CEPC Input Coupler Discuss 6th IHEP-KEK SCRF Collaboration Meeting
Pulsed Ion Linac for EIC
First High Power Test of the ESS Double Spoke Cavity package
Physics Design on Injector I
RF introduction Anders Sunesson RF group leader
Presentation transcript:

CW RF System for the ATLAS Efficiency and Beam Intensity Upgrade Speaker: Yong Luo, Physics Division, ANL On Behalf of: Sergey Sharamentov, Peter Ostroumov, Gary Zinkann Dan Paskvan, Albert Barcikowski, Mike Kelley Eighth CW and High Average Power RF Workshop, May 13-16,2014 Trieste, Italy

2 Content  Introduction to ATLAS  ATLAS Efficiency and Intensity Upgrade  RF System for RFQ  RF System for New Cryomodule Booster A  Improvement  Summary and Future Plan

3 CARIBU The Present ATLAS Accelerator Cryomodules 8 Cryomodules, 47 SC Accelerating Cavities MHz RFQ MHz Energy Upgrade cryomodule MHz Module 4. Split-ring cryomodules MHz Module 2. PII Cryomodules 1992

New ATLAS accelerator configuration 4

5 ATLAS Efficiency and Intensity Upgrade  Increase beam transmission efficiency –Radioactive beams from CARIBU (from Proton to Uranium)  Increase intensity of ion beams –Stable ion beams up to 10 pµA, hundreds of electrical microAmps  This upgrade requires new RF system –Two 60 KW amplifiers for 60 MHz RFQ –Seven 4 KW amplifiers for New 72 MHz Cryomodule –New control system

60.625MHz RFQ and Water Pumps  Installed in In operation since January RFQ with water cooling for body and vanes. Fine frequency tuning by adjusting water temp. Pump Skid RFQ

ATLAS CW RFQ  Total voltage is 2.1 MV  Novel multi-segment split-coax structure –Internal size is 19” only for 60 MHz –Strongly coupled segments –Reduced number of tuners –Bead pull measurements are not required  Cooling system is optimized to reduce temperature gradients –3-axis deep hole drilling 7

60KW Amplifiers to Provide Power for RFQ 8 Two 60KW Amplifiers made by Amplifier Systems. Typically, both are used in operation. But with the adjustment of coupling ports, one amplifier can be used to provide power. LLRF Contrl Units. PLC Water CTRL GUI3 1/8” Coax Line.

Simplified Block Diagram of 60KW Amplifier 9 SPEC: 60 KW, 80 dB minimum gain, Mhz nomial + +

Automated SEL – Driven Mode System 10 -allows for driven mode, SEL frequency and phase lock mode and Auto -SEL frequency lock mode for RF power fill-in, driven for acceleration in Auto

Summing Two RF Amplifiers for ATLAS RFQ 11 -two individual phase stabilization loops -I&Q modulator used as 360 degrees phase shifter and fast amplitude regulator

LLRF Control for ATLAS RFQ 12 Channel 1 only, channel B only or both channels switch

Cryomodule of 7 QWRs and 4 SC Solenoids 13  Seven  = 0.077, MHz quarter-wave cavities  Four 9-Tesla superconducting solenoids  Replaces 3 old cryomodules with split-ring cavities  Total design voltage is 17.5 MV, 4.5K cryogenic load is 70 W  Will be operated to provide ~20 MV, 4.5K cryogenic load is 85 W Vacuum Vessel Room Temperature Magnetic Shield Aluminum Heat Shield (MLI not shown) Compact design, focusing period Includes 2 cavities and 1 solenoid 5.2 m long x 2.9 m high x 1.1 m wide

14 Beta=0.077Beta=0.15Comment Number of Cavities77 Number of Solenoids41 Operating Temperature4.5 K Voltage per Cavity in Cryomodule >2.5 (4.1) MV>2.0 (3.0) MV Cavity limit in parentheses Performance Limiting System?VCX fast tuner E PEAK in Cryomodule40 (70) MV/m26 (39) MV/m Cavity limit in parentheses B PEAK in Cryomodule57 (100) mT47 (69) mT Cavity limit in parentheses Power to Helium/Cavity5 MV8 2 MV Summary of Performance for New Cryomodules New G-Tank Stored of the new Cryomodule: 0.15 J

New MHz Booster A SC Cryomodule m long x 2.9 m high x 1.1 m wide Right Upper: RF Coupling Port Left: Cryomodule A 1111 Right Bottom: Circulator and Dummy Load with Water Cooling.

New MHz Resonator RF System 16  Over-coupling is a main feature for phase lock  Transmission through the Cryomodule is almost 100% Bellows expand outward Beam ports pull inward Helium pressure form 0 to 90 psi

Power Supply, Amplifier and LLRF Control Unit 17  Slow Tuner control is integrated into LLRF controller  Contains two phase detectors, frequency detector, three phase shifters and two RF limiters  Provides regulation of resonator phase and amplitude  Provides RF power interlock resonator temperature and circulator cooling water for ARIS Model: TOMCO BT4K-Alpha SPEC: 4 KW, 3 Phase AC 208V, Mhz nomial. Use LDMOS 1111

Improvement on Reliability of 60KW Amplifiers  Deionized (DI) Water causes corrosion of Brass fittings –Net chemical reactions: Cu + H 2 O -> CuO + 2 H ads (or Cu 2 O + 2 H ads ) 2 H ads -> H 2 H 2 + ½ O 2 -> H 2 O –Replaced most brass fittings with stainless steel fittings (especially connected with H.V.)  Other –New home made inductor w/different value (removing unwanted resonance) –New powerful fans –Better insulator for output capacitors: better isolation –Fuses (-> fast blow type) –PID loop parameters optimization –Others (example) 18 Broken Inductor

Summary  New RF system is built and it meets the requirement  New RF system runs smoothly with the improvement mentioned above Future Plan:  Installation of 60KW circulators  Clean room environment for RFQ amplifiers  Continuous improvement on other electronics  For Tomco 4KW amplifiers, finishing stainless steel fittings replacement 19

End 20

Backup Slides 21