1 Project A6A3-03-01 AS 94900 Aerospace - Flight Control Systems, Design, Installation, and Test Of Piloted Military Aircraft, General Specification For.

Slides:



Advertisements
Similar presentations
AUTOMATIC FLIGHT CONTROL SYSTEM (AFCS)
Advertisements

AGARDograph: Safety and Risk Management in Flight Testing A Guide to Established Risk Management Practices Across the Flight Test Community Dennis Morley.
Subcommittee On Pressure Relief Systems CRE Meeting Spring 2011 Meeting Clark Shepard.
Work Breakdown Structures. Purpose The WBS shows different levels within the product hierarchy. For Government program managers levels 1-3 are of prime.
Joint Working Group for DoD Systems Engineering Standardization
Project Status Update II R09230: Open Architecture, Open Source Unmanned Aerial Vehicle for Imaging Systems A. Benjamin Wager (ME) B. Michael Skube (ME)
WBS & AO Controls Jason Chin, Don Gavel, Erik Johansson, Mark Reinig Design Meeting (Team meeting #10) Sept 17 th, 2007.
Process, Communication, and Certification Padma Venkata
Pneumatic Logic Sensors and Actuators
Hi Rel and Beyond Semitronics A Power Semiconductor Manufacturer.
Distributed Control Systems Emad Ali Chemical Engineering Department King SAUD University.
Aerospace Engineering By Patrick Ferrell. Aerospace Engineering is the main branch of engineering concerned with the research, design, development, construction,
Flight Control Systems and Actuators
The program work breakdown structure (WBS) establishes the essential
Airbus flight control system
Effective Methods for Software and Systems Integration
Leaders in Technology & Innovation ISO 9001:2000 & AS9100 Certified.
1 Accredited Standards Committee C63 ® - EMC Subcommittee 5 – Immunity Report to Main C63 Committee Stephen R Whitesell Chair, SC5 May 7, 2015.
Company Confidential Registration Management Committee (RMC) AS9104/3 Update San Diego, CA 19 January 2011 Shanya Salamaca RABQSA International.
1 Data Exchange Mark E. Sampson EMIS 8340 Systems Engineering Tool—applying tools to engineering systems.
©2008 Pearson Education, Inc., Upper Saddle River, NJ. All rights reserved. This material is protected under all copyright laws as they currently exist.
Graphical Output Package for Industrial Sensor May Team Members Steve Bower – CprE Ken Hall – CprE Roar Lien – CprE Jim Sproul – CprE Rich Matus.
SUBMITTED BY PRAMOD H S DEPT OF MECHATRONICS JSS POLYTECHNIC NANJANGUD.
Federal Aviation Administration 0 Certification Standards for New Technologies June 9, 2005 Certification Standards for New Technologies Presentation to:
UH-60 Mixing Unit, Electronic Coupling, & Stabilator
Standards Coordinating Committee 20 on Test and Diagnosis for Electronic Systems Slide 1 SCC20 Liaison Report Dr. John W. Sheppard CS SAB Meeting November.
M&V Plan Development Working Group Update M&V Summit November 2003 Lia Webster, Chair.
The Presentation Who is Electronic Associates? Who is Electronic Associates? –Industries Served –Companies We Have Served –Why have we been in business.
1 Small Business Innovation Research: A Deployable Wireless Architecture for Sensor-Based Embedded Diagnostics and Prognostics on Ground Vehicles SBIR.
Doc.: IEEE /087 Submission September 1999 Richard J. Holleman, IEEE-SASlide 1 IEEE Standards Association IEEE, ETSI, and Bluetooth Meeting August.
November MOIMS AREA PLENARY NAVIGATION WG REPORT November 2004 CONSULTATIVE COMMITTEE FOR SPACE DATA SYSTEMS.
2 nd Design Update Presentation March 17, Overview Ground Segment Space Segment OBCTNCTransceiverAntenna PCTNCTransceiverAntenna Rx Tx Rx Tx Rx.
Calspan Status Update AG&C Committee, March 1-3, 2006 Lake Tahoe, NV E. Ohmit.
1 M&V Cx Working Group Report New York City - M&V Summit Steve Dunnivant - Chair This presentation will probably involve audience discussion, which will.
Haripriya Head, Integration Team Pratham, IIT Bombay 19 th June, 2010.
TGDC Meeting, Jan 2011 Review of UOCAVA Roadmap Nelson Hastings National Institute of Standards and Technology
Standards Coordinating Committee 20 on Test and Diagnosis for Electronic Systems Slide 1 SCC20 Liaison Report Dr. John W. Sheppard May
PRIIA 305 Diesel Electric Locomotive Specification Independent Review Larry Salci February 15, 2011 Washington, D.C.
Title: LE TG Closing Report for Session #64 Document Number: h-09/0029 Date Submitted: Nov. 19, 2009 Source: Chair of LE TG: Mariana GoldhamerVoice:+972.
HySafe Coordination Committee Meeting no. 8, December 13, 2005, INASMET San Sebastian Status of WP5- The Hydrogen Incident and Accident Database Update.
19th January 2012 Don Wells (Hess)
AUTOMATIC FLIGHT CONTROL SYSTEM (AFCS)
Doc.: IEEE /0295r0 Submission March 15, 2011 Fei Tong, CSRSlide 1 Reference waveform generator for 11ac Notice: This document has been prepared.
I/M Solutions Conference
Mentor-Protégé Timeline Presented by: Office of Small Business Programs Naval Air Systems Command April 2013 Presented by: Office of Small Business Programs.
COMMITTEE CHARTER SAE S-18 Aircraft & Systems Development and Safety Assessment Committee 29 January 2008.
Virtual Lab on Automation Systems A Proposal under Mechatronics Laboratory Presented By Tanuja Sheorey PDPM IIITDM Jabalpur.
Company Confidential Registration Management Committee RMC Auditor Workshop Charleston, SC July Ballot: What is it all about? Information.
Company Confidential Americas Aerospace Quality Standards Committee (AAQSC) Private Web Based on SAE Standard Works September 28, 2015 The.
Aerospace Engineering ( we are aeronautics and astronautics ) 1
Senior Executive Partnership Round Table 12 Hosts Eaton Aerospace Corporation Defense Supply Center Richmond Air Force Materiel Command Army Material Command.
Department of Defense PBL Award Winners
Status Report Jim VanGaasbeek Ricardo Valerdi
Outcome TFCS-04 // March ITU, Geneva
VP Technical Operations Report
Robotics Components.
MOOG EMA Installation MSD1 - P12251
AEROSPACE CONTROL and GUIDANCE Initiatives Meeting Content
NFEC Forum Spring 2018 Pearson update
API 17Q – Subsea Equipment Qualification
API S64 Summer Conference Update.
Vendor Interactions Paul J. Lotz.
Status report from UNECE Task Force on Cyber Security &
Adding Computational Resources to SURAgrid (the document) September 27, 2007 Mary Trauner SURA Consultant.
Tutorial Introduction Section
Future Airborne Capability Environment (FACE™) Support
New Plant Configuration Management Development and Implementation Process John Maciejewski INPO June 29, 2009 EN MRM Standardization Model.
SAE Standards Works Training Module - Useful Tabs
Presentation transcript:

1 Project A6A AS Aerospace - Flight Control Systems, Design, Installation, and Test Of Piloted Military Aircraft, General Specification For Sponsors: Henry Harschburger and Dave Flavell Background There is an industry need for a comprehensive flight control system specification with details similar to MIL-F-9490 and lessons learned MIL-F-9490D was issued in 1975 and was reaffirmed in 1992 However, it is still a very useful document. Tailored versions are being used on the F/A-18, V-22, and RAH-66 Comanche Government representatives have agreed to participate with Committee A-6 in development of an Aerospace Standard for flight control systems A-6A3 Sept 03

2 Project A6A AS Scope. This specification establishes general performance, design, development and quality assurance requirements for the flight control systems of military manned piloted aircraft. Flight control systems (FCS) include all components used to transmit flight control commands from the pilot or other sources to appropriate force and moment producers. Flight control commands may result in control of aircraft flight path, attitude, airspeed, aerodynamic configuration, ride, and structural modes. Among components included are the pilot’s controls, dedicated displays and logic switching, transducers, system dynamic and air data sensors, signal computation, test devices, transmission devices, actuators, and signal transmission lines dedicated to flight control. The interfaces of flight control systems with related subsystems are defined. A-6A3 Sept 03

3 Project A6A AS MIL-F-9490D will be the baseline,with additional information and lessons learned from recent government and industry documents Major Tasks : Assemble an ad-hoc working group Provide a Microsoft Word version of MIL-F-9490D to the working group Review MIL-F-9490D Status of applicable documents Identify sections requiring major updates Identify new topics/sections to be added Format baseline document in SAE format Incorporating changes Ballot to Panel A-6A3 Sept 03

4 Project A6A AS FCS Specification Working Group Sponsor - Henry Harschburger NAVAIR - Shawn Donley, Hank Agnew USAF - Kahtan Awni, Paul Hundley Army- TBD Boeing- Ian Halley Northrop Grumman- Ken Ugowski, Aldo Arena Lockheed Martin- Dave Bodden BAE Systems- Kurt Vieten, Jay Blosser Hamilton Sundstrand- Steve Avritch HR Textron- Mark Willians Parker Aerospace- Glenn Zwicker Moog- Dave Flavell, Scott Schaefer A-6A3 Apr 05

5 Project A6A AS Plan/Tasks: Because of size of document Flight Control Panel approved change in balloting process to review document in three major parts - June Table of contents, cross ref. AS94900 to MIL-F-9490 Fall Submit Part 1 of the document for ballot.– Fall Submit Part 2 of the document for ballot. - Spring Submit Part 3 of the document for ballot. – Summer Submit the complete document for ballot. - Fall Submit Document for Committee A-6 ballot - Early 2006 Status Tasks: 1.Ballot of Part 1 - Complete Oct Second draft of Part 1 balloted/approved – Complete 14 Feb Review of Part 2 by Working Group - Complete 15 Feb Submit Part 2 for ballot – 1 March 2005 A-6A3 Apr 05

6 Project A6A AS Subsystem Level Requirements Subsystem Requirements Electrical Power Subsystem Hydraulic Power Subsystem Pneumatic Power Subsystem Actuation Subsystems Trim Subsystem Artificial Feel Subsystem Display and Annunciation Sensors 3.6 Component Design and Fabrication Requirements: Component General Requirements: Mechanical Components: Electrical and Electronic Components: Assembling: Component Installation: Component Fabrication: Specific Component Requirements: 4 Quality Assurance Provisions: 4.1 General Requirements: 4.2 Analysis Requirements: 4.3 Software Verification: 4.4 Test Requirement: 4.5 Qualification (Preproduction) Tests: 4.6 Documentation: Part 1 Ballot 10/15/04 and 2/14/05 Part 2 Submit Ballot 3/1/05 Part 3 Plan Incremental Balloting of Document to Panel A-6A3 Apr 05

7 For more information, or to participate, contact: Shawn Donley Project A6A AS 94900