CEN/TC278 PT1601 Report to DT2 and ISO TC204 WG18 / CEN TC278 WG16 plenary Vienna, June 2013 27.06.2013PT1601 / DT2 report Vienna1.

Slides:



Advertisements
Similar presentations
1 IEEE Power Engineering Society IEEE Standard 762: Standard Definitions for Use in Reporting Electric Generating Unit Reliability, Availability, and Productivity.
Advertisements

HL7 Security TC Sessions at Group Meeting in Cologne 2007 Security Standardization at ISO and CEN Bernd Blobel Deputy Head of Delegation to ISO and CEN.
GEOSS Data Sharing Principles. GEOSS 10-Year Implementation Plan 5.4 Data Sharing The societal benefits of Earth observations cannot be achieved without.
CEN TC278 WG16 ISO TC204 WG16 Liaison report to ETSI TC ITS June 2013 April 2013PT1601 liaison report to ETSI TC ITS1.
ISO/IEC TS Conformity assessment - Requirements for bodies providing audit and certification of management systems - Part 5 Competence requirements.
CEN/TC 389 Innovation Management
CEN/TC278 WG16 DT2 PT1601 Liaison report to ETSI TC ITS April 2013 PT1601 liaison report to ETSI TC ITS1.
STF421 ITS G5 TESTING – AN OVERVIEW – CEN DSRC – ITS G5 Coexistence Workshop - Presented by Friedbert Berens, in Ispra, Italy STF421 – An Overview -
SECURITY SIG IN MTS 28 TH JANUARY 2015 PROGRESS REPORT Fraunhofer FOKUS.
OneM2M Draft proposal for slide set. This is not intended to be a oneM2M presentation. It is a collection of source material slides which can be used.
Doc.: IEEE /1454r7 Submission March 2013 IEEE 802 JTC1 Standing Committee Proposal for SC6 contribution process 20 March 2013 Haasz et al, IEEESlide.
Towards "Guidelines supporting the Member States in developing the interoperability of ePrescriptions” Standards Development and Profiling Organisations'
ISO TC 184/SC4 ISO TC184/SC4/WG12 N937 SC4 Opening Plenary WG12 Report San Francisco, CA, USA TC184/SC4/WG Meeting 2001/06/11 Greg A. Paul WG12 Convener.
WG_Session_42_Closing_Plenary_report January 2011 IEEE Session #42 Taipei, Taiwan Closing Plenary Subir Das
TST WG Progress Report at TP 17 Group Name: TST WG Source: TST WG Chair, JaeSeung Song (KETI) Meeting Date: to , Sapporo, Japan Agenda.
ISO/TC 211 WG 5 Profiles and Functional Standards Presentation to 7th Plenary of ISO TC 211, Beijing, China, 24 September 19981/18 Presentation to ISO/TC.
Interim Solution What it is and how to to use it 21 June 2012.
Riccardo Genghini - Ws E-Sign Chairman – IETF PKIX San Francisco March Electronic Signature infrastructure for Europe Riccardo Genghini Cen/Isss.
SC14 Report to the SC13 Plenary Larry Schultz, Chairman Erin Cliggett Kahn, Secretary 17 June 2008.
1 IEEE MEDIA INDEPENDENT HANDOVER DCN: Title: , Session #21, Big Island Closing Plenary Date Submitted: September, 2007.
International Standards and Regional Regulations.
Rolling Resistance Standards Work at ISO (TC31 WG6) Prepared for GRB Review 19 Sep 2011 Angela Wolynski WG6 Convenor Informal document GRB (54th.
WG9 Report ISO/TC211 Plenary Meeting Montreal, Canada
LADM Overview and Introduction Christiaan Lemmen Workshop LADM Québec City, Québec, Canada November 4th 2009.
Doc.: IEEE / Submission March 2004 Larry Taylor (Staccato)Slide 1 Project: IEEE P Working Group for Wireless Personal Area Networks.
TST WG Progress Report at TP 19 Group Name: TP Source: TST WG Chair, JaeSeung Song (KETI) Meeting Date: to Agenda Item: TP19, Item.
Materials, equipment and offshore structures for petroleum, petrochemical and natural gas industries LIAISON REPORT of European Standardization Technical.
Doc.: IEEE r1 Submission May 12, 2002 Dr. John R. Barr, Motorola Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs)
SC32/WG2 N Status report on ISO/IEC CD MMF Ontology Registration He Keqing and OKABE, Masao Project editor MMF Ontology Registration ISO/IEC JTC1.
Doc.: IEEE /129r0 Submission May 2000 Vic Hayes, Lucent TechnologiesSlide 1 Report from the Regulatory ad-hoc meeting doc 00/124 Vic Hayes.
Doc.: IEEE /263r0 Submission José A. Gutierrez July-2002 Slide 1 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs)
2016/6/11 1 Liaison Report on ISO/TC215 Hidenori Shinoda 6/29/2007 Berlin.
ISO TC204 WG8 Convenor’s Report Public Transport and Emergency Services April 2006 Busan, South Korea.
ISO Liaison Report Hidenori Shinoda Charles Parisot.
ISO TC 204 CHOD Meeting 27 April 2006
ISO/TC 204 WG 3-Database Technologies
IEEE 802 JTC1 Standing Committee Proposal for SC6 contribution process
WG1 status report to TP#15 Group Name: oneM2M TP15
Time Schedule.
TGaf San Francisco Closing Report
JTC1 ad hoc closing report (July 11)
ETSI Liaison Request November 08
Submission Title: [Task Group 1 Opening Report]
P802.11s Report to EC on Conditional Approval to go to Sponsor Ballot
Marine Strategy Framework Directive (MSFD)
IEEE 802 JTC1 Standing Committee Proposal for SC6 contribution process
Radio Resource Measurement
IETF Liaison Report March 2004 Dorothy Stanley – Agere Systems
STF 442 Specialist Task Force initiated by ETSI MTS Manpower Duration
Item 6.1 COICOP revision Conclusions: The Working Group participants generally agreed with the proposed new structure for COICOP with some reservations.
Harmonisation Activity Progress report
Submission Title: Dallas e/ Liaison Report.
Proposed Review Cycle to
Marine Strategy Framework Directive (MSFD)
TGaf San Antonio Closing Report
P802.11z Report to EC on Conditional Approval to go to Sponsor Ballot
ETSI ERM TG37 Report to IEEE WAVE
ETSI Liaison Requests November 08
IEEE P Working Group for Wireless Personal Area Networks
A Global Consensus Process
Supplementary Plenary Information - May 2010
IEEE TGaf Palm Springs Closing Report
TGn Draft Redline Notice
P802.11z Report to EC on Conditional Approval to go to Sponsor Ballot
JTC1 ad hoc closing report (May11)
Strategic Co-ordination Group May 2009
Submission Title: [WG-TG3 closing Report Sept02]
802.11af Liaison Report Date: Authors: January 2013
<month year> doc.: IEEE < e> <March 2019>
July 15, 2010 San Diego, USA Session #68
Presentation transcript:

CEN/TC278 PT1601 Report to DT2 and ISO TC204 WG18 / CEN TC278 WG16 plenary Vienna, June PT1601 / DT2 report Vienna1

Meetings with stakeholders PT1601 / DT2 report Vienna February 2013: IEEE 1609, San Diego April 2013: Sztaki, Institut for Computer Science and Control, Budapest April 2013: ETSI TC ITS, Sophia Antipolis April 2013: ISO TC204 meeting, Seattle May 2013: iMobility Forum Concertation Meeting, Brussels 11. May 2013: University Kaiserslautern May 2013: IEEE 1609, San Diego June 2013: ETSI TC ITS, Sophia Antipolis

Status of work PT1601 / DT2 report Vienna3 PT1601 provided versions of TS and TS for "comment-only" ballot. Ballot period ended on 3. May "Comment-only" ballot provided one editorial comment to TS from Australia, and 11 comments to TS from Japan. All of these comments could be resolved. PT1601 received a technical comment from Marben Products on the ASN.1 module in TS This comment was resolved. PT1601 received comments from Orange / France to TS These comments were discussed. The final conclusion of DT2 was that these comments do not require a change of the document. Feedback will be provided.

Next steps PT1601 / DT2 report Vienna4 There are close relations between DT2, DT6, DT7, TC204 WG16 and ETSI, and potentially with other DTs. All DTs are invited to read TS and TS in order to avoid late redesigns of their standards. PT1601 together with DT6 and TC204 WG16 arranges for a technical ad-hoc meeting with ETSI TC ITS in July to resolve a potential conflict of competing standards with a new work item from ETSI was detected. ETSI agreed already to have this meeting.

Next steps PT1601 / DT2 report Vienna5 PT1601 will provide final versions of TS and TS before the next TC278 plenary meeting. TS is considered to be already mature. However an informative annex on "Objectives" and their usage will be added. TS needs additional efforts on security issues. PT1601 will present the final drafts to CEN TC278 WG16 / ISO TC204 WG18 for final comments. There will likely only be a short period for final comments. PT1601, after having resolved these final comments, will trigger "ballot for publication" for TS and TS 17423, preferably already before the next TC278 plenary meeting.

ESF GmbH Hans-Joachim Fischer Fichtenweg 9 D Blaubeuren Germany phone: fax: LECIT Consulting SrL Fausto Caneschi Via Santa Maria Pisa Italy phone: SRA, Inc. Richard Roy 3351 Shady Spring Ln Mountain View, CA USA phone: Members of PT PT1601 / DT2 report Vienna6