Progress report to SAC for the GISMO -- Gladders Image-Slicing Mutlislit Option for IMACS -- A. Dressler Basic mechanical/optical assembly -- Feb ‘07 1.

Slides:



Advertisements
Similar presentations
Guiding By: Jeff Thrush.
Advertisements

IMACS Commissioning Report to the Magellan SAC Performance and Operation 2+ years after installation Alan Dressler and Tyson Hare, April 8, Capabilities.
Magellan Associate Director Report Personnel Observing Statistics Commissioning of Instruments.
Keck I Cassegrain ADC: Preliminary Design Overview UCO/Lick Observatory 15 October 2003.
Extragalactic AO Science James Larkin AOWG Strategic Planning Meeting September 19, 2004.
By Kimberley Evans, Huw Wells and Katy Langley. Catadioptrics use a combination of mirrors and lenses to fold the optics and form an image. There are.
Magellan Associate Director Report Personnel Observing Statistics Telescope Operations.
S.H.H.S Building Construction
The Origin of Modern Astronomy Chapter 4:. Isaac Newton 1689.
M2FS: Michigan/Magellan Fiber System. M2FS (Michigan/Magellan Fiber System) Fiber-fed MOS w/2 independent and identical spectrograph arms 256 total fibers.
PALM-3000 Instrument commissioning schedule Antonin Bouchez Team Meeting #7 27 February, 2008.
MOM Report Paul Soler MICE Operations Manager University of Glasgow MICO April 4, 2011.
1 Implications Of Infrastructure Build The Infrastructure Project is bigger than anyone thought, but now it’s understood The cost was underestimated, but.
Unit 1 Physics Detailed Study 3.1 Chapter 10: Astronomy.
HBD Transmission Monitor: Update on Assembly & Testing HBD Working Group Meeting 8/29/06 B. Azmoun Brookhaven National Lab.
1 Summary of MICE beamline & hall installations This is a very rough summary of the progress since mid-December Richard Apsimon & Andy Nichols MICO meeting.
Magellan f/5 Planning and Status Andrew Szentgyorgyi Magellan SAC Meeting Pasadena/17 Mar 2012.
Technical manager’s report September Telescope activities Primary mirror hardpoint repair New mirror actuator controls Collimation analysis F/5.
The Michigan/Magellan Fiber System (M2FS): An MRI Instrument Development Proposal to NSF.
Magellan Associate Director Report Personnel Observing Statistics Commissioning of Instruments Committees.
18/19 January 2003IMACS SAC meeting update1 IMACS: Inamori-Magellan Areal Camera and Spectrograph Magellan SAC Status Report 18/19 January 2003 OCIW, Pasadena,
Magellan F/5 System Status A.Szentgyorgyi/SAO/30 Apr 2005.
Chapter 16 Designing Effective Output. E – 2 Before H000 Produce Hardware Investment Report HI000 Produce Hardware Investment Lines H100 Read Hardware.
Capstone Team  Andre Nylund  Chris Grewell  Craig Lechtenberg  Fadel Al Jutail  Matt Melius  Mufeed Yacoub Team Advisor  Dr. Raul Bayoán Cal Customer.
17/18 May 2003IMACS SAC meeting update1 IMACS: Inamori-Magellan Areal Camera and Spectrograph Magellan SAC Status Report 17/18 May 2003 Univ. of Michigan,
PACS IIDR 01/02 Mar 2001 FPFPU Alignment1 D. Kampf KAYSER-THREDE.
Design Partition, Project Plan, Task Assignments and Conceptual Designs September 13, 2006 Team Moondogs Chris Culver Rahul Kirtikar Elias Krauklis Christopher.
TSIP (Telescope System Instrumentation Program) proposal February, 2005 Carnegie submission, on behalf of Magellan Consortium: “A Second, More Sensitive.
1 Jim Thomas - LBL 4.2 Meters ~ 1 Meter The SSD: March Face to Face Meeting Jim Thomas Lawrence Berkeley Laboratory March 14 th, 2012 The SSD.
14 October Observational Astronomy SPECTROSCOPY and spectrometers Kitchin, pp
IP-BSM Improvement Work N. Terunuma 2012/6/26 ATF2 Project Meeting.
Binary Asteroids (or why 2 rocks are MUCH better than 1) DrBill (20361) Romanishin U. Of Oklahoma and Oklahoma City Astronomy Club.
Lyot Stop Focal Plane Mask OAP3 Out of plane spherical mirror.
Multiplexed High Res Spectroscopy at Keck – J. Cohen (PI), H. Epps (Optical Design), M. Rich (Project Scientist) Keck instruments for optical spectroscopy.
Multi-slit spectroscopy In sky-noise dominated conditions (most interesting!) the use of slits is essential: eg: Faint object, extra-galactic, surveys:
Magellan F/5 System Status A.Szentgyorgyi / Ann Arbor 25 Sept 2005.
6-7 October 2001Inamori-Magellan Areal Camera & Spectrograph 1 IMACS: Inamori-Magellan Areal Camera and Spectrograph Magellan SAC Status Report 6-7 October.
Magellan technical updates, Pasadena April 2006 – September 2006.
Pg 1 Spherical Grating Spectrographs CALSYS Upgrade Darragh O’Donoghue Why? Unacceptably low light throughput resulting in loss of science time while getting.
The FMOS Facility for the SUBARU telescope Gavin Dalton Oxford/RAL.
Drop Testing Apparatus Team Members: Deatly Butler Mark Clouse Chris Dux Kris Honas Shaun Scott Drew Stephens Client: Itron, Inc. Brian Priest Technical.
13-14 April 2002Inamori-Magellan Areal Camera & Spectrograph 1 IMACS: Inamori-Magellan Areal Camera and Spectrograph Magellan SAC Status Report April.
Oct 26, 2007SALT Workshop UKZN1 Robert Stobie Prime Focus Imaging Spectrograph Science Rationale Modes –Fabry-Perot Spectral Imaging –Grating Spectroscopy;
DAVID ANDERSON RYAN DUNN BRYON ELSTON ELIZABETH FISCHER ROBERT MENNA GUIDE : BILL NOWAK CUSTOMER: DR. MICHAEL SCHRLAU (ME DEPARTMENT) P13375 : Computer.
Magellan Telescopes Instrumentation: A Critical Assessment of Current Status.
Binospec - Next Generation Optical Spectrograph for the MMT
Oct 24, 2006SSWG1 Robert Stobie Prime Focus Imaging Spectrograph Status On-telescope throughput analysis Ghost analysis Repair plan Status of other current.
Mechanical design meeting, IAG, Calibration Unit mechanical design Svend M. Bauer Andreas Kelz, Emil Popow, Martin M. Roth.
1 Earth’s Atmosphere & Telescopes Whether light is absorbed by the atmosphere or not depends greatly on its wavelength. Earth’s atmosphere can absorb certain.
1 FVTX Detector Assembly Stephen Pate New Mexico State University (FVTX Assembly Management WBS 1.7) Stephen Pate, NMSU – FVTX Review – 16-Nov-2009.
Magellan SAC April 7-8, 2006 Pasadena, CA. Personnel New hires: –None Open positions: –Programmer –Scientists (two, through AAO) Changes –Pasadena EE.
Weak Lensing - PSF Calibrations Steve Kent Apr 1, 2005 ● Motivation for studies: – 1. Develop concise metrics for requirements for weak lensing calibrations.
Pasadena Updates March February 2009 PFSMegacam MMIRS FourStar Some of the instruments arriving at Magellan in the next year.
1 03/21/2006 GLAST CU Beam Test Workshop Scanning Table.
Measuring Instruments
Problem 3 ME 115 Final – Troy Topping. Initial Construction A box with m = 1250 kg is input to simulate the forklift Only half the mass is used since.
FourStar Status SAC Meeting 13mar2010 Persson, Murphy, Birk, Monson, Kelson, Uomoto.
Drawing Ray Diagrams for Plane Mirrors
18-19 May 2007Mosaic-II Update, SAC Meeting Mosaic-II Progress Tyson Hare, Ian Thompson, Greg Burley, Christoph Birk, Alan Dressler, Alan Uomoto.
 Today's vehicles are much more complex and complicated than the cars of the 1960s, '70s, '80s, incorporating more computer electronics, silicon chips,
© JABEE 2015 Fundamental Concept of JABEE Evaluation and Accreditation JABEE evaluation and accreditation is to confirm the engineering educational program.
Design for a New Optical Table of the Shintake Monitor Takashi Yamanaka The University of Tokyo ATF2 weekly meeting 2007/9/26.
MagIC Upgrade for High-Speed Photometry Jim Elliot, MIT Magellan SAC
Update on electron spectrometer measurements Introduction Setup, measurements carried out Some raw images Results and conclusions L. Deacon, M. Wing (UCL)
LSST Commissioning Overview and Data Plan Charles (Chuck) Claver Beth Willman LSST System Scientist LSST Deputy Director SAC Meeting.
COSMOS Status David Sprayberry, Sean Points & Jay Elias
Intro to CCD Imaging Joe Roberts
Introduction to Spectroscopy
NanoBPM Status and Multibunch Mark Slater, Cambridge University
Echidna: current status and expected performance
Presentation transcript:

Progress report to SAC for the GISMO -- Gladders Image-Slicing Mutlislit Option for IMACS -- A. Dressler Basic mechanical/optical assembly -- Feb ‘07 1

GISMO reimages these slices at the same scale and on the same focal surface -- to IMACS optics, it appears that these slices are actually being imaged by the telescope. Objects are selected by a slit mask at the reimaged focal surface. The slit mask must be changed manually (GISMO must be removed from IMACS), but each slitmask contains 5 setups, and these are selected remotely. 2

Typical slit density in a 4’ x 4’ field 3

Great multiplex advantage for fields with high target density: Galaxy deep fields, clusters of galaxies (grav. lenses), globular cluster systems of nearby galaxies, Galactic bulge stars… GISMO can also be used in combination with MOE (Multi-Object Echelle) to obtain, for example one or two orders at R=20,000 for ~50 stars in a globular cluster 4

The GISMO Pre-Ship Review -- March 15, 2007 at OCIW. Alan Uomoto organized the review. Attending were Matt Johns, Frank Perez, Mark Phillips, Steve Shectman, Ian Thompson, Andy Szentgyorgyi (phone), Dave Osip (phone), and Wendy Freedman (briefly) Presentations were made by Dressler, Hare, and Gladders (phone). Tyson Hare also answered technical questions from the Committee and Dressler and Gladders answered operational and scientific questions. By early March, GISMO was 95% assembled -- optics, structure, and electromechanics and some testing had been done. The GISMO team requested the Review because it wanted to ship GISMO to Magellan in order to make (1) a mechanical “fit-up” of GISMO in the IMACS mask-server and (2) an imaged starfield and focus run before proceeding with the final assembly. 5

6

Pre-Ship Review report to Director: Approved of shipping GISMO to Chile for mechanical fit up and verification sky images. Recommended returning GISMO to Pasadena before final shipping back to Chile, to address the final placement of electronics and cabling. (The electronics is for positioning the five-position multislit mask -- the only moving part.) Also, team would address problem of slipping in the brake of the slit mask motion (~50 microns), possibly with a detent system. Also investigate a baffle to protect the optics, and logistical issues -- Installation/handling cart? Director suggested a brief review before sending back GISMO in May for further tests. Ian slicing mirrors slit mask ? linear motor brake 7

GISMO shipped to Chile for March 29-31st Baade engineering run. GISMO mechanical fitup successful -- installed in box and inserted into IMACS on first try. Two issues: (1) GISMO is too heavy (35 lbs) to be installed against gravity -- will be inserted in horizontal position of mask server. Since GISMO will only be used with direct f/4 imaging (no other masks), it will be inserted for periods of several hours at a time, if not all night, so this is not a serious operational penalty. 8

GISMO shipped to Chile for March 29-31st Baade engineering run. GISMO mechanical fitup successful -- installed in box and inserted into IMACS on first try. Two issues: (2) Because of GISMO’s weight, the air-cylinder that inserts it (and the slitmasks) is unable to hold GISMO against the two stops -- there is a slight “rotation” as IMACS is turned around. This is unacceptable because of the motion of about 1 arcsec of the objects on the slit (worse case, full amplitude). 9

Air cylinder actuator hard stops Great weight of GISMO and IFU cause a “rotation” (falling off of top hard- stop) when vertical wrt gravity. Both units will be secured by a cam-latch in line with the guide wheels on top. Will this also fix the IFU drift? 10

First light GISMO images, March 31, IMACS f/4 image of  Cen 11

Focus run on March 31 made by moving Baade secondary mirror. Significant variation in best focus, but all slices reach 0.7” at some focus, which was the seeing at the time. 12

Time was allocated in subsequent engineering run, May 4-6, but attempt to return GISMO to Pasadena in first week of April failed -- GISMO sat in Santiago customs for almost 3 weeks. Return cancelled. Work continued in the SBS shops to finish final dressing of electronics and fabricate a detent system for the moving slit mask. These modifications were taken to Chile on May 1. Christoph Birk, Alan Bagish, and Tyson Hare finished the electronic and mechanical work. GISMO had not been returned to Chile as the PSR had requested, but it was acknowledged that the Commissioning would not begin until a progress review by the PSR Committee. During May 4-6, Mike Gladders and Jennifer Marshall continued tests. Dressler consulted. Principally, they worked to tune up the optics and make a focus-run Hartmann mask images (on sky) for more accurate offsets of slices foci. 13

Data from May 4-6, globular cluster in IMACS f/4 (15’ x 15’) After “steering” with the fold mirrors to direct output to proper positions in field, also align with decker mask 14

Most important result of the May tests was that the focus variations (especially of the outer 4 segments) are in the direction of “two short a path length” compared to most of the slices. It is likely that this is due to ~10% radius of curvature errors in the most difficult slicing mirrors. Z-MAX was used to investigate the best way to fix the problem, and no simple translation of optics preserved the optical paths. Excellent results were obtained, however, but simply extending focal lengths of folding mirrors. These mirrors are easy and rapid to obtain, and relatively inexpensive (Sunny Precision). They will be ordered next week and will show up in July. 15

Remaining Issues Detents in the brake have solved the slitmask slip problem, but mysterious jumps in the zero point needs to be fixed. Ran out of time. Cabling issues almost complete, but final dressing (tensioner) needs to be done in situ. Protective shroud still needs to be fabricated. Cam-latch is being designed. These issues will be addressed and finished by August. June has been given to Mike Gladders to make observational tests using the many modes of GISMO. Tyson Hare and Christoph Birk will accompany him. They will also attend to other IMACS issues. 16

The GISMO team expects to submit a further report in July or August to the the Director and the PSR Commnittee with a request to proceed with Commissioning during a Baade engineering run in the last quarter of GISMO might be offered in 2008A. The following complete list of tasks has been developed, some of which have been investigated to some extent, but not throughly and documented. 17

prelim 18

prelim 19