1 【 1 Project description and implementation method 】 1.1. Project description (including implementation method) 1.1.1 Trends of Regulations and Nuclear.

Slides:



Advertisements
Similar presentations
Project L.O.F.T. Report May 2007 through October 2007 Creating a design to meet stakeholder desires and dissolve our current set of interacting problems.
Advertisements

Chapter 2 Analyzing the Business Case.
Documenting Cash and In-Kind Match Project Director Training & Annual Meeting.
Quality Improvement/ Quality Assurance Amelia Broussard, PhD, RN, MPH Christopher Gibbs, JD, MPH.
Learning Objectives LO1 Describe the current audit environment, including developments in regulatory oversight and provincial regulation of public accountants.
Identifying and Selecting Projects
Chapter 3 Project Initiation
IS4799 Information Systems and Cybersecurity Capstone Project
© 2015 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole or in part.
Investment Justifications IJ Template and Examples 1.
Chapter 2.
IT Governance and Management
Blueprint Test matrix Is it necessary?. Blueprint Table of specification. Establish the length of each test and the number of test items measuring each.
PPA 502 – Program Evaluation Lecture 2b – Evaluability Assessment.
Analyzing the Business Case
Fact-Finding Fact-Finding Overview
SAFA- IFAC Regional SMP Forum
project management office(PMO)
Chapter 3 Project Initiation. The stages of a project  Project concept  Project proposal request  Project proposal  Project green light  Project.
Prepared by Long Island Quality Associates, Inc. ISO 9001:2000 Documentation Requirements Based on ISO/TC 176/SC 2 March 2001.
TS16949 requirements Subjects –Audit planning –Recertification audit requirements –Auditing Remote supporting functions.
ASPEC Internal Auditor Training Version
INTRODUCTION TO PUBLIC PROCUREMENT
Sharif University of Technology Session # 4.  Contents  Systems Analysis and Design Sharif University of Technology MIS (Management Information System),
Capability Maturity Model
Conducting the IT Audit
N By: Md Rezaul Huda Reza n
Lecture #9 Project Quality Management Quality Processes- Quality Assurance and Quality Control Ghazala Amin.
Chapter 5 Job Analysis.
Developing and Issuing the RFP. Why should qualifications be your procurement focus? n Having the necessary range of capabilities is more important than.
SBIR Budgeting Leanne Robey Chief, Special Reviews Branch, NIH.
Product Documentation Chapter 5. Required Medical Device Documentation  Business proposal  Product specification  Design specification  Software.
SOUTH AFRICAN DIAMOND AND PRECIOUS METALS REGULATOR (SADPMR)
1 Kingsley Karunaratne, Department of Accounting, University of Sri Jayewardenepura, Colombo - Sri Lanka Practice Management.
Project Life Cycle – Project Initiation © Ed Green Penn State University All Rights Reserved.
Edita Trečiokienė Grundtvig 3: Grants to Participate in Adult Education Training Activities The Quality of Training Activities applied for and possible.
Project quality management. Introduction Project quality management includes the process required to ensure that the project satisfies the needs for which.
McGraw-Hill/Irwin © 2003 The McGraw-Hill Companies, Inc., All Rights Reserved. 6-1 Chapter 6 CHAPTER 6 INTERNAL CONTROL IN A FINANCIAL STATEMENT AUDIT.
1 Kingsley Karunaratne, Department of Accounting, University of Sri Jayewardenepura, Colombo - Sri Lanka Practice Management.
IAEA International Atomic Energy Agency Methodology and Responsibilities for Periodic Safety Review for Research Reactors William Kennedy Research Reactor.
CEM CEM – 520 Measuring the Effectiveness of Materials Management for Industrial Construction Projects in Saudi Arabia Thesis By Ali Al-Darweesh.
IAEA International Atomic Energy Agency Development of the Basis Document for Periodic Safety Review for Research Reactors William Kennedy Research Reactor.
1 Chapter 11 Planning. 2 Project Planning “establishing a predetermined course of action within a forecasted environment” “establishing a predetermined.
RMC Auditor Workshop Charleston, SC July 2015 Registration Management Committee Company Confidential RMC Auditor Workshop Charleston, SC
Info-Tech Research Group1 Manage IT Budgets & Cost World Class Operations - Impact Workshop.
How to Write a Project Proposal Specialization Introductory Module Thursday, May 9, 2013 Barbados.
WORKSHOP ON ACCREDITATION OF BODIES CERTIFYING MEDICAL DEVICES INT MARKET TOPIC 9 CH 8 ISO MEASUREMENT, ANALYSIS AND IMPROVEMENT INTERNAL AUDITS.
School practice Dragica Trivic. FINDINGS AND RECOMMENDATIONS FROM TEMPUS MASTS CONFERENCE in Novi Sad Practice should be seen as an integral part of the.
THE BEST CONTACT CENTER INDONESIA 2016 INSTRUCTION This template should be used for all program categories. Template can be modified, subject to your.
Evaluation. What is important??? Cost Quality Delivery Supplier Expertise Financial Stability Coverage Product Offerings Do you intend to negotiate?
Small Business and Subcontracting. Subcontracting for Small Business 6 steps to successful subcontracting 6. Report Contractor performance 1. Consider.
North Carolina Council on Developmental Disabilities
Authorization to Enter Into Contract with Four Consultants for General Plan Implementation Services City Council February 6, 2017.
HOW TO WRITE PROJECT PROPOSAL – FORM AND STYLE
C. What is a Feasibility report
Auditing & Assurance Services, 6e
Reconstruction site Investigation, Planning, Scheduling, Estimating and Design Eng. Fahmi Tarazi.
(Additional materials)
Developing and Issuing the RFP
FIVE PROJECT PHASES 5C-3 Sun. 8:00-10:00am 21/ 2/2016.
Standards and Certification Training
Monitoring and Evaluation using the
Capability Maturity Model
MODULE B - PROCESS SUBMODULES B1. Organizational Structure
North Carolina Council on Developmental Disabilities
Technology innovation
PSO Overview for (name of organization’s) PSES Workgroup
Define Your IT Strategy
Kingdom of Saudi Arabia
Capability Maturity Model
Presentation transcript:

1 【 1 Project description and implementation method 】 1.1. Project description (including implementation method) Trends of Regulations and Nuclear Power Policies  Project description (including implementation method)  Describe the project contents specifically (including implementation method). 【 Criteria for added-point evaluation 】 ・ Are the proposals for the project original and innovative? ・ Is the implementation method efficient and effective, as well as feasible? ・ Does the bidder have experience in research on overseas nuclear power trends and a strong research base? 【 Criteria for added-point evaluation 】 ・ Are the proposals for the project original and innovative? ・ Is the implementation method efficient and effective, as well as feasible? ・ Does the bidder have experience in research on overseas nuclear power trends and a strong research base? Proposal form Description contents 【 Criteria for basic point evaluation 】 ・ Is it consistent with the project objectives? ・ Do the contents of project conform to the intent of the Agency for Natural Resources and Energy? ・ Is the bidder capable of researching overseas nuclear power trends? 【 Criteria for basic point evaluation 】 ・ Is it consistent with the project objectives? ・ Do the contents of project conform to the intent of the Agency for Natural Resources and Energy? ・ Is the bidder capable of researching overseas nuclear power trends?

2 【 1 Project description and implementation method 】 1.1. Project description (including implementation method) Understanding Users’ Needs  Project description (including implementation method)  Describe the project contents specifically (including implementation method). Description contents 【 Criteria for basic point evaluation 】 ・ Is it consistent with the project objectives? ・ Do the contents of project conform to the intent of the Agency for Natural Resources and Energy? ・ Is the bidder capable of researching overseas nuclear power trends? 【 Criteria for basic point evaluation 】 ・ Is it consistent with the project objectives? ・ Do the contents of project conform to the intent of the Agency for Natural Resources and Energy? ・ Is the bidder capable of researching overseas nuclear power trends? Proposal form 【 Criteria for added-point evaluation 】 ・ Are the proposals for the project original and innovative? ・ Is the implementation method efficient and effective, as well as feasible? ・ Does the bidder have experience in research on overseas nuclear power trends and a strong research base? 【 Criteria for added-point evaluation 】 ・ Are the proposals for the project original and innovative? ・ Is the implementation method efficient and effective, as well as feasible? ・ Does the bidder have experience in research on overseas nuclear power trends and a strong research base?

3 【 1 Project description and implementation method 】 1.1. Project description (including implementation method) Advanced Light Water Reactors with High-Level Safety  Project description (including implementation method)  Describe the project contents specifically (including implementation method). 【 Criteria for added-point evaluation 】 ・ Are the proposals for the project original and innovative? ・ Is the implementation method efficient and effective, as well as feasible? ・ Does the bidder have experience in research on overseas nuclear power trends and a strong research base? 【 Criteria for added-point evaluation 】 ・ Are the proposals for the project original and innovative? ・ Is the implementation method efficient and effective, as well as feasible? ・ Does the bidder have experience in research on overseas nuclear power trends and a strong research base? Proposal form Description contents 【 Criteria for basic point evaluation 】 ・ Is it consistent with the project objectives? ・ Do the contents of project conform to the intent of the Agency for Natural Resources and Energy? ・ Is the bidder capable of researching overseas nuclear power trends? 【 Criteria for basic point evaluation 】 ・ Is it consistent with the project objectives? ・ Do the contents of project conform to the intent of the Agency for Natural Resources and Energy? ・ Is the bidder capable of researching overseas nuclear power trends?

4 【 1 Project description and implementation method 】 1.1. Project description (including implementation method) Field Study  Project description (including implementation method)  Describe the project contents specifically (including implementation method). Description contents 【 Criteria for basic point evaluation 】 ・ Is it consistent with the project objectives? ・ Do the contents of project conform to the intent of the Agency for Natural Resources and Energy? ・ Is the bidder capable of researching overseas nuclear power trends? 【 Criteria for basic point evaluation 】 ・ Is it consistent with the project objectives? ・ Do the contents of project conform to the intent of the Agency for Natural Resources and Energy? ・ Is the bidder capable of researching overseas nuclear power trends? Proposal form 【 Criteria for added-point evaluation 】 ・ Are the proposals for the project original and innovative? ・ Is the implementation method efficient and effective, as well as feasible? ・ Does the bidder have experience in research on overseas nuclear power trends and a strong research base? 【 Criteria for added-point evaluation 】 ・ Are the proposals for the project original and innovative? ・ Is the implementation method efficient and effective, as well as feasible? ・ Does the bidder have experience in research on overseas nuclear power trends and a strong research base?

5 【 2 Project implementation plan 】  To ensure that good results are obtained, describe major milestones of the project implementation plan (work contents and schedule) conducted by the bidder, and state specifically and objectively the basis for the schedule proposed. Description contents Schedule (Include the following items in the description.) Work description, persons in charge, start date, end date, title of document prepared, milestones Innovativeness and ideas that will ensure that work is completed on time The schedule used in the past XXX was utilized as a template to create this schedule. XXXXXXXXXXXXXXXXXXXXXXXXXXXX ・・・・・・・・・・・・・・・  Work contents and schedule Example of description 【 Criteria for added-point evaluation 】 ・ Are reasons, innovativeness, and experience which indicate this schedule is reasonably achievable shown? ・ Is the schedule set up carefully such that the project implementation timing and term is established in accordance with the objectives and the findings of the research can be reflected in the later project and reported effectively? 【 Criteria for added-point evaluation 】 ・ Are reasons, innovativeness, and experience which indicate this schedule is reasonably achievable shown? ・ Is the schedule set up carefully such that the project implementation timing and term is established in accordance with the objectives and the findings of the research can be reflected in the later project and reported effectively? Quarter 1234 ○○ ○○ ○○ Other Interim report Report writing 【 Criteria for basic point evaluation 】 ・ Is the schedule appropriate? ・ Can the bidder meet the objectives according to the schedule? 【 Criteria for basic point evaluation 】 ・ Is the schedule appropriate? ・ Can the bidder meet the objectives according to the schedule? Proposal form

 Expertise and know-how  XXXXXXXXXX  Separately described in the proposal, “reference to XXX”, etc.  Past Experience (Include the following in the description.)  Client (* it is not mandatory to disclose the actual name. Instead, the name may be written as, for example, “Central government department A” or something similar.)  Summary of implementation  Implementation timing  Principal persons in charge of project implementation, etc. 【 3 Project implementation system 】 3.1 Organizational expertise and experience in similar projects 【 Criteria for added-point evaluation 】 ・ Do they have a reservoir of expertise, know-how, and others useful for this project? ・ Do they have implementation experience of research which is cited in various materials, or have they achieved valuable research outcomes? 【 Criteria for added-point evaluation 】 ・ Do they have a reservoir of expertise, know-how, and others useful for this project? ・ Do they have implementation experience of research which is cited in various materials, or have they achieved valuable research outcomes? Description contents  Describe organizational expertise, know-how, and past experience relevant to the project. Example of description If additional information is available, attach it to this as “annex”. 【 Criteria for basic point evaluation 】 ・ Do they have experience (expertise obtained) in similar projects? ・ Does the organization have the ability to examine the research contents from various perspectives? (Does the organization have different specialized departments, or a balanced structure?) 【 Criteria for basic point evaluation 】 ・ Do they have experience (expertise obtained) in similar projects? ・ Does the organization have the ability to examine the research contents from various perspectives? (Does the organization have different specialized departments, or a balanced structure?) Proposal form 6

 Name of person in charge (Include the following items in the description.)  Division and position  Work to undertake  Role  Work experience (customer business category, work implemented and its contents, positioning in the organization, implementation term)  Career summary, skills, expertise, etc.  Past successes  Name of person in charge (Include the following items in the description.)  Division and position  Work to undertake  Role  Work experience (customer business category, work implemented and its contents, positioning in the organization, implementation term)  Career summary, skills, expertise, etc.  Past successes 【 3 Project implementation system 】 3.2 Expertise and past experience in similar projects of persons who will be engaged in this project Description contents  Describe expertise, accumulated know-how, and past experience in similar projects of persons who will be engaged in this project. Example of description 【 Criteria for added-point evaluation 】 ・ Do they have a reservoir of expertise, know-how, and others useful for this project? ・ Do they have implementation experience of research which is cited in various materials, or have they achieved valuable research outcomes? 【 Criteria for added-point evaluation 】 ・ Do they have a reservoir of expertise, know-how, and others useful for this project? ・ Do they have implementation experience of research which is cited in various materials, or have they achieved valuable research outcomes? If additional information is available, attach it to this as “annex”. 【 Criteria for basic point evaluation 】 ・ Do they have experience in similar projects? ・ Do they have implementation experience of research which is cited in various materials, or have they achieved valuable research outcomes? 【 Criteria for basic point evaluation 】 ・ Do they have experience in similar projects? ・ Do they have implementation experience of research which is cited in various materials, or have they achieved valuable research outcomes? Proposal form 7

8 【 4 Attached material 】 4.1. Worker-hours for project implementation  [Name of contract item] Detailed estimation Work Worker-hours (man-hrs) No. Item 1.1.1 ●●●-related item 1.1.2 ○○○-related item Total Description contents  Describe total labor cost and worker-hours necessary to enable the project implementation method proposed in “2, Project implementation plan”. Example of description ・ The figures are reference values only and they do not need to coincide exactly with worker-hours and labor costs set out in the contract. Proposal form