PRE- BID CONFERENCE Preparation of Feasibility cum Masterplan for Development of Turf Club in Punjab Date 15.06.2012.

Slides:



Advertisements
Similar presentations
PRE-QUALIFICATION/ SHORT LISTING OF CONSULTANTS PRE-QUALIFICATION/ SHORT LISTING OF CONSULTANTS.
Advertisements

THE HOUNSLOW EXPERIENCE: A CASE STUDY Mark Steward MAX Associates 28 th April 2009.
Presentation by: Tshewang Gyeltshen. The SBD is prepared in line with the PRR 2009 & SBD Large Works General principals of procurement to be applied prescribed.
Railway Grade Separations Issues. Railway Grade Separations 1.Introduction Qualifications/experience to undertake bridge planning for railway grade separations:
Procurement in PPPs February 27, When do you start thinking about procurement? Preliminary Scoping & teaming Viability assessment Choice between.
Tendering Procedures in Lagos State under the Public Procurement Law 2011 Presented By Engr. Akin Onimole | February 13, 2013 GM/CEO, Public Procurement.
Request for Proposal (RFP) document consisting of detailed Scope of Work, Eligibility Criteria and other project details etc. can be issued to interested.
Facilities Design Principles Chapter 28. Planning Pitfalls Failure to provide accommodations for handicapped Failure to provide adequate storage Failure.
Alternative Project Delivery Mechanisms The J. K. Spruce Experience Katherine Yates Assistant General Counsel.
Alternative Project Delivery
Lunchtime Topics Craig Weise Construction Reform Program Director Lisa Conomy Construction Counsel OSU Office of Legal Affairs.
1 Use and content of the RFP  Request for Proposals (RFP) is similar to bidding documents and include all information of the assignment, selection of.
Procurement and Tendering Presentation to [NAME OF CLIENT] [YOUR NAME] [DATE]
DEPARTMENT OF TOURISM AND PUNJAB INFRASTRUCTURE DEVELOPMENT BOARD invite Public Private Partnership (PPP) for Development of INSTITUTE OF HOTEL MANAGEMENT.
Selection of Consultancy Services
Procurement of Consultancy Services. 2 Differences between.
Green Roof Action Project 綠頂行動 Our scheme is not just about physical implementation of green features on top of school buildings, it is about the knowledge.
Alderman Road Residences Phase II Design Build. Extensive master planning preceded this phase 2003 – Dagit Saylor Master Plan Hanbury Evans Update.
Software Development Contracts and Legal Issues Cost plus Fixed price Combined.
Lecture(3) Instructor : Dr. Abed Al-Majed Nassar
PRESENTATION TITLE Presented by: Name Surname Directorate Date Briefing Session: W 1059 WTE APPOINTMENT OF PROFESSIONAL SERVICE PROVIDER (PSP) FOR VALIDATION.
Selection of Consultant Nazaneen I. Ali Sr. Procurement Specialist 1.
WELCOME TO THE PROCUREMENT SEMINAR Procurement and Contracts An Overview of Contract Administration.
Model Procurement Documents for Architectural Services [NAME] [PLACE] [DATE]
Genesis Solar Module Brochure ™
A SOUND INVESTMENT IN SUCCESSFUL VR OUTCOMES FINANCIAL MANAGEMENT FINANCIAL MANAGEMENT.
HOW TO WRITE A BUDGET…. The Importance of Your Budget Preparation of the budget is an important part of the proposal preparation process. Pre-Award and.
Public Works Contracting Marsha Reilly Office of Program Research House of Representatives recommended.
Project Planning and Capital Budgeting
Tendering in Poland. INTRODUCTION Company Setup Tendering Project Delivery.
ROAD ACCIDENT FUND COMPULSORY BRIEFING SESSION RAF/2014/00008 Date: 24 March 2014 Time: 11:00.
Project preparation and appraisal. Preparation of project report and appraisal are intimately tied up.
Consultants' Competitive Negotiation Act Acquisition of professional architectural, engineering, landscape architectural, or surveying and mapping.
Achieving peak performance in contracting for services Presentation to the 10 th IPPU CPD Grand Imperial Hotel 31 st March, 2012 John F. A. Etidau.
Pre-Proposal Conference NASA Langley Research Center October 26, 2009.
CONSTRUCTION CONTRACTS PRIME CONTRACTS Format and Major Components CHAPTER - 4.
Management & Development of Complex Projects Course Code MS Project Management Project Life Cycle & PM Process Groups Lecture # 4.
Public Private Partnership (PPP) for Development of INSTITUTE OF HOTEL MANAGEMENT AT MOHALI (SAS NAGAR) DEPARTMENT OF TOURISM AND PUNJAB INFRASTRUCTURE.
BASICS IN IRRIGATION ENGINEERING 2.1. Planning Irrigation systems 2.2. soil-plant-water relation – over view 2.3. Crop water requirement 2.4. Base, delta.
WEST KOWLOON CULTURAL DISTRICT
UNDP Bangladesh Procurement Fair Objectives of the Fair; - UNDP Procurement principles; - Procurement plan ; - UNDP Procurement Roadmap;
Introduction Procurement of Consultant Services (based on PPA 2004 and Best Practices) Presented by: NM Lema Macrh, 2013.
Budget Workshop: Fiscal Policies, Process, and Budget Guidelines Board of Governors April 21, 2005.
STAKEHOLDER CALL/MEETING TO DISCUSS AND PROVIDE INPUT ON ZEV INCENTIVE PROGRAM GUIDELINES CALIFORNIA AIR RESOURCES BOARD March 7,
Process of Planning, Designing and Financing a Hospital
PUBLIC–PRIVATE PARTNERSHIP (PPP) FRAMEWORK AND GUIDELINES Syed M. Ali Zaidi, P.Eng. PM(Stanford), Ph.D. Director, Strategic Partnerships Alberta Infrastructure.
DEVELOPMENT OF A WHITE PAPER ON CORRECTIONAL SERVICES Ministry of Correctional Services.
Chapter 3 Event Bidding Event Bidding C H A P T E R 3.
Coquina Coast Seawater Desalination Project TERMS Base Contract TasksBase Contract Tasks – Must be completed – Negotiated and included in the Base Allowance.
Millennium Challenge Account-Benin II Feasibility Study to Establish a Power Generation Company (GENCO) Pre-proposal Meeting March 30, 2016 Brief Procurement.
Prepared by: Alex Fisch Planning Services Division.
Lecturer: Lina Vladimirovna Zhornyak, Associate Professor.
Preparation and Analysis of Project Report. What is a Project Report?  A Project Report is a detailed description of the Project  The Project Report.
ROAD ACCIDENT FUND VENDOR BRIEFING SESSION RAF/ 2012 /00032
Minimum Set of Requirements for Suppliers
Minimum Set of Requirements for Suppliers
PRESENTER Jose A. Galan ▸ Division Director, Internal Services Department, Real Estate Development Division ▸ Current Chair of the Florida Council For.
12.2 Conduct Procurements The process of obtaining seller responses, selecting a seller and awarding the contract The team applies selection criteria.
EVALUATION OF GENDER RESPONSIVE BUDGETING PROGRAMME IN NEPAL
PRE-BID MEETING ITB UNDP Design and Construction of a new medical warehouse in Bissau, Guinea Bissau 15th August 2017 Presented by Antoine Fadoul UNDP-
ROAD ACCIDENT FUND COMPULSORY BRIEFING SESSION RAF/2014/00008
Environmental Impact Assessment (EIA) in New Brunswick
Understanding the Community Housing Fund
PROJECT REPORT PREPARATION
2012 Annual Call Steps of the evaluation of proposals, role of the experts TEN-T Experts Briefing, March 2013.
Provision of vocational and entrepreneurship development skills training to the out-of-school adolescent girls and young women from conflict affected.
Pre-bid Clarification Meeting
Provision of HR Services, UNOPS Nepal
Roles and Responsibilities
RIBA Plan Tom Robinson sir david Swindells Vii
Presentation transcript:

PRE- BID CONFERENCE Preparation of Feasibility cum Masterplan for Development of Turf Club in Punjab Date 15.06.2012

Background Department of Animal Husbandry is administrative department of project. Punjab Infrastructure Development Board (PIDB), a nodal agency set by Government of Punjab. IL&FS IDC -as Project Development Advisor The area allocated for the project is around 250 acre in Ludhiana District, Punjab. The facility is expected to include Turf Club & other national and international level equestrian activities as well, viz. club house complex, horse riding club for children, etc. The Project also envisages various related support infrastructure like five star hotel and Amusement park and other Leisure activities, etc . Pre Bid Conference

Institutional Structure DEPARTMENTS INVOLVED Department of Home Affair & Justice. Department of Excise and Taxation G.O.P PIDB ANIMAL HUSBANDRY NODAL AGENCY FOR DEVELOPING THE PROJECT ON PPP ADMINISTRATIVE DEPARTMENT FOR DEVELOPMENT OF THE PROJECT IL&FS IDC PROJECT DEVELOPMENT ADVISOR Pre Bid Conference

Selection Process TECHNICAL EVALUATION FINANCIAL EVALUATION TWO STAGE PROCESS TECHNICAL EVALUATION Only those Applicants whose Technical Proposals score 70 marks or more out of 100 shall qualify. QUALITY- COST BASED SELECTION- 70:30 FINANCIAL EVALUATION SELECTED BIDDER Pre Bid Conference

Eligibility Criteria FINANCIAL CRITERIA TECHNICAL CRITERIA Over the past 15 (Fifteen) years preceding the PDD, undertaken a minimum of [2 (two)] Eligible Assignments. FINANCIAL CRITERIA The Applicant shall have received a minimum average annual income of [Rs. 7 (seven)] crore per annum from professional fees during the last 3 (three) financial years i.e. till March 2011 preceding the Proposal Due Date. Pre Bid Conference

Eligible Assignments Turf Club The Turf Club should have been registered in the turf authority/federation of respective countries. Masterplan and Conceptual Design of the following Components:- Race Tracks with minimum length of 1200 of meters Grand Stand with minimum capacity of 3000 spectators Stables for 500 Horses Betting Arena]; or Pre Bid Conference

Eligible Assignments [Upgradation of Turf Club Project Cost of Upgradation should be more than 200 crores which will include Upgradation or redevelopment of the following components:- Redevelopment of racecourse which involves extension and widening of the existing tracks. Masterplan and Conceptual Design of the following Components:- Redevelopment of Grand Stand with minimum capacity of 3000 spectators. Redevelopment of Stables for 500 Horses. Redevelopment of Betting Arena]; or Pre Bid Conference

Eligible Assignments- Cont… Equestrian Sports Centre Masterplan and conceptual design of equestrian Sports Complex of International Level. Design of Grand Stand with minimum capacity of 3000 spectators. Design of stable for 250 horses. Design of show jumping arena Pre Bid Conference

Proposal Requirement Method of Selection : Quality and Cost Based Selection (QCBS) Quality Cost Ratio : 70 : 30 Bid Security: INR 2 Lakh. Proposal Validity Period : 90 days Proposal shall be submitted in English Language Format of Technical Proposal : Full Technical Proposal Pre Bid Conference

Evaluation Criteria Minimum Technical Score required to pass : 70% Parameters Max. Weight Relevant Experience of the Applicant 25 Approach and Methodology 5 Relevant Experience of Key Personnel 70 Senior Architect-cum-Team Leader 20 Project Manager 15 IT Expert Equine Sports Expert 10 Equine Veterinary Specialist Total Maximum Score 100 Minimum Technical Score required to pass : 70% Pre Bid Conference

Financial Score Formula for Financial Score Sf = 100 * Fm/F Sf : Financial Score Fm : Lowest Price F : Price Proposal Under Consideration Weights given to Technical and Financial Proposals are T = 70% and P = 30% Combined and final evaluation 3.4.1 Proposals will finally be ranked according to their combined technical (ST) and financial (SF) scores as follows: S = ST x TW + SF x FW Where S is the combined score, and TW and FW are weights assigned to Technical Proposal and Financial Proposal that shall be 0.70 and 0.30 respectively Pre Bid Conference

Bidding Process Release of NIT 25th May 2012 Issue of RFP Documents Pre –Bid Meeting 15th June 2012 Submission of Technical & Financial Proposal 9th July 2012 Opening of Technical Proposals 9th July 2012 Opening of Financial Proposals of Technically Qualified Bidders July 2012 Selection of Preferred Bidder and Issue of Notice of Award July 2012 Team Mobilization/ Commencement of Work July 2012 Pre Bid Conference

Objective The objective of the consultancy is to provide technical assistance to GoP in the development of a world class Turf club with all the facilities of international standards. Pre Bid Conference

Scope of Work- Cont… Assessment and analysis of existing site: Selection of Site- The consultant will undertake a site suitability study for the two sites available near Ludhiana. Assessment of land at the selected site and possibility for future expansion Assessment of land requirement and land acquisition requirement if any Assessment of Infrastructure facility like water supply, sewerage, drainage facility Identification of external infrastructure development Consultant shall list all the clearances required for the project Consultant shall also assess the potential of proposed site for commercial development and identify and propose the type and size of commercial activities possible site Pre Bid Conference

Scope of Work Prepare the conceptual plan and design for the entire turf club. Standardizing - laying specifications as per their respective international & national federations for turf club support infrastructure & facilities. Planning & standardizing entire operation/activity of racing in accordance to the guidelines of international horse racing federation. Pre Bid Conference

Scope of Work- Cont… Providing technical inputs as per international/national guidelines, as & when required for designing facilities, equestrian sports, betting law, breeding & veterinary hospital till the award of final work order or signing of final agreement with the concessioner. Assistance in preparation of tender documents/concession agreement and bid evaluation. Conceptual design and specifications for water treatment plant, water reservoirs, water features, surface contouring of water features, irrigation and drainage. Environmental impact assessment of the project and detailing measures required for mitigating adverse impacts if any. Pre Bid Conference

Scope of Work- Cont… Preliminary Design and Conceptual Masterplan: The consultant shall carry out preliminary design and prepare alternative concept plan for Turf Club. Identification and listing of essential and desirable components in term of infrastructure, support infrastructure, amenities, etc and recommended components for the proposed project. Outline design for Turf Club and components, their sizing, configuration and preliminary design structure. The design shall be in conformation with applicable norms, standards, guidelines. Pre Bid Conference

Scope of Work- Cont… Master Plan shall include: Prevalent building regulation and developmental guidelines. This may include ground coverage, setbacks, maximum permissible built-up area, permissible building height, use of basement etc. Site layout with plot boundary, setbacks and other applicable development control guidelines Spatial arrangement of components including utilities and support infrastructure and sizing of components Area statement for each proposed components Parking arrangement Circulation plan Pre Bid Conference

Scope of Work- Cont… Cost Estimations: The consultant shall undertake cost estimate as per applicable Schedule of Rate for each and every component of the proposed facilities. The consultant shall provide in detail a schedule of fixed and variable operating and maintenance cost of the facility at various stages of utilization These costs shall be used by GoP for estimation of landed project cost and all financial analysis and calculation. Pre Bid Conference

Proposed Team Structure Sr. No Team Member Educational Qualification Experience of Eligible Projects 1 Team Leader B. Arch with more than 10 years of experience He should have worked in atleast two of the eligible projects mentioned in clause 3.1.4 out of which one should have been in the capacity of a team leader. 2 Project Manager B. Arch with more than 7 years of experience He should have worked as an architect in atleast one of the eligible projects mentioned in clause 3.1.4. 3 IT Expert B.E/B.Tech in Computer/I.T Engineering with more than 7 years of experience He should have led the IT Team in atleast one of the eligible projects mentioned in clause 3.1.4. or should have been involved in designing the software which facilitates betting in Casinos or related projects. 4 Equestrian Sports Expert Graduate with more than 7 years of Experience He should have worked as an Equestrian Sports Expert in atleast one of the eligible projects mentioned in clause 3.1.4. 5 Equine Veterinary Specialist P.G in Veterinary Science with more than 7 years of experience He should have been involved as an Equine Veterinary Specialist in atleast one of the eligible projects mentioned in Clause 3.1.4. Pre Bid Conference

Time Schedules and deliverables Sr. No. Activity/Report Time(in days from date of signing of consultancy agreement) Payment as a % of Total Fee 1 Inception Report Action Plan and Methodology 7 days 5 2 Interim Report I Shall include the final site suitable for the Turf Club. It would also include the Concept plan including layout plans for Race Tracks, Grand Stand, Veterinary Hospital, and Stables for horses. The consultant shall also prepare a draft Master Plan for different amenities like amusement park, multiplex, hotel, residential, commercial etc feasible near the Turf Club. 30 Days 25 3 Interim Report II Based on the suggestions received from the Client on Inception Report, the Consultant shall submit Interim Report which would include: Preliminary Planning for the Turf Club and the Internal Infrastructure; and The Revised Master Plan for the different Amenities feasible near the Turf Club. 75 days 30 4 Final Report The final report would include: The preliminary design of the Turf Club and the Internal Infrastructure. Final Master Plan for the different Amenities and the Proposal for Key Attraction 120 days 40 Pre Bid Conference

Sites In Punjab- Ladhowal and Mattewara Ludhiana Pre Bid Conference

Location of Site- Mattewara Pre Bid Conference

Location of Site- Mattewara

Location of Site- Ladhowal Pre Bid Conference

Thank You