PRE- BID CONFERENCE Preparation of Feasibility cum Masterplan for Development of Turf Club in Punjab Date 15.06.2012
Background Department of Animal Husbandry is administrative department of project. Punjab Infrastructure Development Board (PIDB), a nodal agency set by Government of Punjab. IL&FS IDC -as Project Development Advisor The area allocated for the project is around 250 acre in Ludhiana District, Punjab. The facility is expected to include Turf Club & other national and international level equestrian activities as well, viz. club house complex, horse riding club for children, etc. The Project also envisages various related support infrastructure like five star hotel and Amusement park and other Leisure activities, etc . Pre Bid Conference
Institutional Structure DEPARTMENTS INVOLVED Department of Home Affair & Justice. Department of Excise and Taxation G.O.P PIDB ANIMAL HUSBANDRY NODAL AGENCY FOR DEVELOPING THE PROJECT ON PPP ADMINISTRATIVE DEPARTMENT FOR DEVELOPMENT OF THE PROJECT IL&FS IDC PROJECT DEVELOPMENT ADVISOR Pre Bid Conference
Selection Process TECHNICAL EVALUATION FINANCIAL EVALUATION TWO STAGE PROCESS TECHNICAL EVALUATION Only those Applicants whose Technical Proposals score 70 marks or more out of 100 shall qualify. QUALITY- COST BASED SELECTION- 70:30 FINANCIAL EVALUATION SELECTED BIDDER Pre Bid Conference
Eligibility Criteria FINANCIAL CRITERIA TECHNICAL CRITERIA Over the past 15 (Fifteen) years preceding the PDD, undertaken a minimum of [2 (two)] Eligible Assignments. FINANCIAL CRITERIA The Applicant shall have received a minimum average annual income of [Rs. 7 (seven)] crore per annum from professional fees during the last 3 (three) financial years i.e. till March 2011 preceding the Proposal Due Date. Pre Bid Conference
Eligible Assignments Turf Club The Turf Club should have been registered in the turf authority/federation of respective countries. Masterplan and Conceptual Design of the following Components:- Race Tracks with minimum length of 1200 of meters Grand Stand with minimum capacity of 3000 spectators Stables for 500 Horses Betting Arena]; or Pre Bid Conference
Eligible Assignments [Upgradation of Turf Club Project Cost of Upgradation should be more than 200 crores which will include Upgradation or redevelopment of the following components:- Redevelopment of racecourse which involves extension and widening of the existing tracks. Masterplan and Conceptual Design of the following Components:- Redevelopment of Grand Stand with minimum capacity of 3000 spectators. Redevelopment of Stables for 500 Horses. Redevelopment of Betting Arena]; or Pre Bid Conference
Eligible Assignments- Cont… Equestrian Sports Centre Masterplan and conceptual design of equestrian Sports Complex of International Level. Design of Grand Stand with minimum capacity of 3000 spectators. Design of stable for 250 horses. Design of show jumping arena Pre Bid Conference
Proposal Requirement Method of Selection : Quality and Cost Based Selection (QCBS) Quality Cost Ratio : 70 : 30 Bid Security: INR 2 Lakh. Proposal Validity Period : 90 days Proposal shall be submitted in English Language Format of Technical Proposal : Full Technical Proposal Pre Bid Conference
Evaluation Criteria Minimum Technical Score required to pass : 70% Parameters Max. Weight Relevant Experience of the Applicant 25 Approach and Methodology 5 Relevant Experience of Key Personnel 70 Senior Architect-cum-Team Leader 20 Project Manager 15 IT Expert Equine Sports Expert 10 Equine Veterinary Specialist Total Maximum Score 100 Minimum Technical Score required to pass : 70% Pre Bid Conference
Financial Score Formula for Financial Score Sf = 100 * Fm/F Sf : Financial Score Fm : Lowest Price F : Price Proposal Under Consideration Weights given to Technical and Financial Proposals are T = 70% and P = 30% Combined and final evaluation 3.4.1 Proposals will finally be ranked according to their combined technical (ST) and financial (SF) scores as follows: S = ST x TW + SF x FW Where S is the combined score, and TW and FW are weights assigned to Technical Proposal and Financial Proposal that shall be 0.70 and 0.30 respectively Pre Bid Conference
Bidding Process Release of NIT 25th May 2012 Issue of RFP Documents Pre –Bid Meeting 15th June 2012 Submission of Technical & Financial Proposal 9th July 2012 Opening of Technical Proposals 9th July 2012 Opening of Financial Proposals of Technically Qualified Bidders July 2012 Selection of Preferred Bidder and Issue of Notice of Award July 2012 Team Mobilization/ Commencement of Work July 2012 Pre Bid Conference
Objective The objective of the consultancy is to provide technical assistance to GoP in the development of a world class Turf club with all the facilities of international standards. Pre Bid Conference
Scope of Work- Cont… Assessment and analysis of existing site: Selection of Site- The consultant will undertake a site suitability study for the two sites available near Ludhiana. Assessment of land at the selected site and possibility for future expansion Assessment of land requirement and land acquisition requirement if any Assessment of Infrastructure facility like water supply, sewerage, drainage facility Identification of external infrastructure development Consultant shall list all the clearances required for the project Consultant shall also assess the potential of proposed site for commercial development and identify and propose the type and size of commercial activities possible site Pre Bid Conference
Scope of Work Prepare the conceptual plan and design for the entire turf club. Standardizing - laying specifications as per their respective international & national federations for turf club support infrastructure & facilities. Planning & standardizing entire operation/activity of racing in accordance to the guidelines of international horse racing federation. Pre Bid Conference
Scope of Work- Cont… Providing technical inputs as per international/national guidelines, as & when required for designing facilities, equestrian sports, betting law, breeding & veterinary hospital till the award of final work order or signing of final agreement with the concessioner. Assistance in preparation of tender documents/concession agreement and bid evaluation. Conceptual design and specifications for water treatment plant, water reservoirs, water features, surface contouring of water features, irrigation and drainage. Environmental impact assessment of the project and detailing measures required for mitigating adverse impacts if any. Pre Bid Conference
Scope of Work- Cont… Preliminary Design and Conceptual Masterplan: The consultant shall carry out preliminary design and prepare alternative concept plan for Turf Club. Identification and listing of essential and desirable components in term of infrastructure, support infrastructure, amenities, etc and recommended components for the proposed project. Outline design for Turf Club and components, their sizing, configuration and preliminary design structure. The design shall be in conformation with applicable norms, standards, guidelines. Pre Bid Conference
Scope of Work- Cont… Master Plan shall include: Prevalent building regulation and developmental guidelines. This may include ground coverage, setbacks, maximum permissible built-up area, permissible building height, use of basement etc. Site layout with plot boundary, setbacks and other applicable development control guidelines Spatial arrangement of components including utilities and support infrastructure and sizing of components Area statement for each proposed components Parking arrangement Circulation plan Pre Bid Conference
Scope of Work- Cont… Cost Estimations: The consultant shall undertake cost estimate as per applicable Schedule of Rate for each and every component of the proposed facilities. The consultant shall provide in detail a schedule of fixed and variable operating and maintenance cost of the facility at various stages of utilization These costs shall be used by GoP for estimation of landed project cost and all financial analysis and calculation. Pre Bid Conference
Proposed Team Structure Sr. No Team Member Educational Qualification Experience of Eligible Projects 1 Team Leader B. Arch with more than 10 years of experience He should have worked in atleast two of the eligible projects mentioned in clause 3.1.4 out of which one should have been in the capacity of a team leader. 2 Project Manager B. Arch with more than 7 years of experience He should have worked as an architect in atleast one of the eligible projects mentioned in clause 3.1.4. 3 IT Expert B.E/B.Tech in Computer/I.T Engineering with more than 7 years of experience He should have led the IT Team in atleast one of the eligible projects mentioned in clause 3.1.4. or should have been involved in designing the software which facilitates betting in Casinos or related projects. 4 Equestrian Sports Expert Graduate with more than 7 years of Experience He should have worked as an Equestrian Sports Expert in atleast one of the eligible projects mentioned in clause 3.1.4. 5 Equine Veterinary Specialist P.G in Veterinary Science with more than 7 years of experience He should have been involved as an Equine Veterinary Specialist in atleast one of the eligible projects mentioned in Clause 3.1.4. Pre Bid Conference
Time Schedules and deliverables Sr. No. Activity/Report Time(in days from date of signing of consultancy agreement) Payment as a % of Total Fee 1 Inception Report Action Plan and Methodology 7 days 5 2 Interim Report I Shall include the final site suitable for the Turf Club. It would also include the Concept plan including layout plans for Race Tracks, Grand Stand, Veterinary Hospital, and Stables for horses. The consultant shall also prepare a draft Master Plan for different amenities like amusement park, multiplex, hotel, residential, commercial etc feasible near the Turf Club. 30 Days 25 3 Interim Report II Based on the suggestions received from the Client on Inception Report, the Consultant shall submit Interim Report which would include: Preliminary Planning for the Turf Club and the Internal Infrastructure; and The Revised Master Plan for the different Amenities feasible near the Turf Club. 75 days 30 4 Final Report The final report would include: The preliminary design of the Turf Club and the Internal Infrastructure. Final Master Plan for the different Amenities and the Proposal for Key Attraction 120 days 40 Pre Bid Conference
Sites In Punjab- Ladhowal and Mattewara Ludhiana Pre Bid Conference
Location of Site- Mattewara Pre Bid Conference
Location of Site- Mattewara
Location of Site- Ladhowal Pre Bid Conference
Thank You