Construction Cost Estimation Michael Mincic Civil Engineering Technology Department 22 February 2007.

Slides:



Advertisements
Similar presentations
Construction Engineering 221
Advertisements

Construction Management. Players Owner – owns project upon completion of construction –Private – owner owns land and pays for construction of facility.
CONTRACT A binding agreement between two or more parties for performing, or refraining from performing, some specified act(s) in exchange for lawful consideration.
Construction Engineering 221 Cost Estimating and Bidding II.
Bidding Requirements ACT 380. Objective Provide an overview of the bidding process, including documents included in the bidding requirements.
Chapter 12 Estimate Summaries and Bids. Bid Summaries The format of the summary depends for what the estimate is to be used. –Ordering materials –Calculating.
CON 4003 CVE 4073/5073 The Estimating Process Prof. Ralph V. Locurcio, PE.
Chapter 5 Cost Estimating and Bidding BCN 4708 Fall 2008.
Marcy Mealy Procurement Specialist CDBG Program
CIVL202 Construction Engineering I
KFUPM, Department of Construction Engineering and Management CEM 520 LIABILITY ALLOCATION AMONG THE PARTIES TO FIXED-PRICE CONSTRUCTIN CONTRACTS IN SAUDI.
Estimating CTC-415. Estimate Types Concept Detailed Definitive.
ESTIMATING By Laith Jacob.
PROCEDURES FOR SELECTING THE CONTRACTOR
Review of Plans & Estimating Introduction Architect’s Responsibilities Types of Estimates Factors Affecting Cost Film Project:
Cydney McGlothlin, Architect, University of Florida, Gainesville FL
Prof Awad S. Hanna Labor Cost and Sources of Labor Costs.
Construction Engineering 221 Cost Estimating and Bidding.
Chapter 1 Introduction to Cost Estimates What is an Estimate? An estimate is an evaluation of a future cost. A building cost estimate is an attempt to.
2004 TEA Conference, Mobile, AL Ingredients for a Cost-based Estimate $ $ $ $ $ $
CIVL202 Construction Engineering I Tutorial 2 T1Mon11:00 – 11:50 T2Wed09:00 – 09:50.
What Are Construction Documents Construction documents serve as a means of obtaining bids from contractors and are used by contractors to obtain price.
By : Savannah Mosley ARCHITECTURAL ENGINEERING. WHAT IS ARCHITECTURAL ENGINEERING? Architectural engineering is the blend of the basic principles of engineering.
SPORT MANAGEMENT 302 (a) B. FLAHERTY Questions/Comments?? Quiz next week, Chapters 1-6 Complete Chapter 7 “Funding and the Bid Process” Chapter 8 “Constructing.
Architect By: Chia-Jade Lee & Chloe Horgan By: Chia-Jade Lee & Chloe Horgan.
Construction Engineering Management Project Costing
Contract Pricing Methods Ch 2. Lump Sum –Contractor bids 1 price for entire project –Estimate needs to be detailed –Design needs to be finished before.
© 2009 Gibbs, Giden, Locher & Turner LLP - All Rights Reserved 1 The Spearing Doctrine and Definitions of “Complete” Construction Documents Presented by.
Chapter 42 Construction Specifications. 2 Links for Chapter 42 Introduction Construction Specifications Construction Documents.
Construction Contracts and Project Delivery Methods
Labor Standards Pam Truitt  September 10, Key Regulations & Statutes  Davis-Bacon Act  Copeland Act (Anti-kickback Act)  Contract Work Hours.
YUSUF OZ FATIH BOLUKBAS HUSEYIN ANIL KARABULUT. A contract is a legally binding agreement between two or more parties.
Measurement and Payment. Construction Progress Payments –Contractor gives a bill for progress to RPR Outlines what bill is for Give details as needed.
Specification & Quantities Estimating
Construction Cost Estimating Class #2: The Estimating Process Prof. Ralph V. Locurcio, PE.
Construction Documents ACT Objective To acquire a basic understanding of the contents and relationship between the documents which make up the.
King Fahd University of Petroleum & Minerals
CONSTRUCTION CONTRACTS PRIME CONTRACTS Format and Major Components CHAPTER - 4.
Risk Management and Schedule Management E. Keith Sinkhorn Department of Engineering 21 February 2007.
Chapter 2 Introduction to Construction Procedures
CONSTRUCTION CONTRACTS DOCUEMENTS
CON 4003 CVE 4073/5073 Construction Cost Estimating Class #2: The Estimating Process Prof. Ralph V. Locurcio, PE.
CVE 4070 Construction Engineering Course Review & Critique Prof. Ralph V. Locurcio, PE.
Estimates and Quotes Apply procedures to develop plans, estimates and quotes Objective 4.03 Remember key terms, abilities needed, and items included in.
PROJECT PHASES ACT Objective To provide an understanding of the design & construction process and the roles of the different participants in this.
DR. Nabil Dmaidi Labor Cost and Sources of Labor Cost.
1 PS&E Plans, Specifications and Estimate. 2 Contract Letting Plans-Show what is being built Plans-Show what is being built Specification-Show how project.
34 Specifications Chapter Permission granted to reproduce for educational use only.© Goodheart-Willcox Co., Inc. Objectives Explain the purpose of specifications.
Estimating CE-147 Week 2. Estimate Types Concept Detailed Definitive.
CHAPTER 1 MANAGEMENT IN THE ENGINEERING AND CONSTRUCTION INDUSTRY CONSTRUCTION'S FUTURE:  Increasing size of projects & Organizations  Increasing technological.
Chapter 13 Estimates for Remodeling Work
CON 2001 CVE 4070 Construction Methods/Engineering Changes & Extra Work Prof. Ralph V. Locurcio, PE.
Contract Specifications Written Set of standards and procedures informing the contractors or remediation professionals of materials & operation necessary.
Measurement and Payment
Introduction to Procurement for Public Housing Authorities Sealed Bids Unit 5.
© Awad S. Hanna, PhD, P.E.1 Estimating and Scheduling CEE 492 Lecture 2 Construction Contracts.
© Awad S. Hanna, PhD, P.E.1 Estimating and Scheduling CEE 492 Lecture 4 STEPS IN THE DEVELOPMENT OF A DETAILED ESTIMATE.
4. Price Labor, Materials, and Equipment Ⓒ. L ABOR C OST Six Components to the Labor Cost: 1. Wages 2.Worker's Compensation Insurance 3.FICA Tax, Federal.
UNIVERSITY OF PALESTINE FACULTY OF APPLIED ENGINEERING & URBAN PLANNING CIVIL ENGINEERING DEPARTMENT ENGINEERING PROJECT MANAGEMENT CHAPTER 3 INTRODUCTION.
HORTICULTURE II - LANDSCAPE Unit B Landscape Design.
COST PLUS. Reasons for Cost-Plus Can’t agree on a price Specialty work Notice of Changed Conditions.
 To provide a realistic accurate idea of the cost  Provide information about building or not.
Administration of a FIDIC Contract - Pre-Contract Phase -
Estimating Project Costs
Costs and Economics of Construction
Financing Land Development Projects
Speaker: Sarah Chambers, Esq. Claims Counsel| Professional Liability
CIVL 493 CONSTRUCTION MANAGEMENT
Manajemen Konstruksi Bidding & Award
Procurement & Strategic Sourcing
Presentation transcript:

Construction Cost Estimation Michael Mincic Civil Engineering Technology Department 22 February 2007

Civil Engineering Technology at CSU- Pueblo Bachelor of Science CET –Four year degree accredited by the Accreditation Board for Engineering and Technology TAC- (ABET)

Outline 1.Construction Cost Estimating 2.Bid Documents 3.The Estimation Process 4.Cost of Construction Labor & Equipment

Construction Cost Estimating Estimating is not an exact science! Construction knowledge Common sense Good judgment Lots of Luck!!!

Types of estimates The construction process players –The Owner –The Designer –The Contractor Approximate Estimates Detailed Estimates

Organization of Estimates See Steps for preparing a detailed estimate (pg. 8, Table 1.2) CSI Format –Building Construction –16 major divisions WBS Format –Heavy Engineering

Awareness of Estimation Items Quantity Take-Off Labor and Equipment crews Checklist of Operations Bid Documents Addenda & Change Orders Overhead Material Taxes Labor Costs Workmen’s Compensation Insurance Labor Burden Bonds Insurance

Bid Documents & Contract Documents Bid Document –Before Agreement Contract Document –After Agreement Architect – building type Engineer –Heavy/Industrial

Bid Documents Contract Requirements Arrangement of Contract Documents –Business/legal matters –Technical matters Building Construction Specs Heavy/Highway Specs

Bid Documents Requirements Bid Solicitation Instructions to Bidders –Time of completion –Obligation of Bidder Information Available to Bidders Bid Forms –Lump sum –Unit price

Drawings Heavy/Highway –Plan, profile, earthwork, cross section, details, schedules, etc. Building Construction Drawings –Civil –Architectural –Structural

Decision to Bid Assess the desire to Bid –Do we want to bid this project? –Do we have the skills to complete this project? –Do we have the available labor to complete this project? –Do we have the necessary equipment to complete this project? –Do we have experience with similar projects? –How busy are we? –Can we bond for the additional work with the existing projects?

Additional Decisions to Bid Geographic Location Complexity of the Project Owner’s Reputation Designer’s Reputation Do we want to expand?

Sources of Labor Rates Union Wage –Predetermined by contractor’s union Open-Shop –Agreed upon by the employer and employee Prevailing rate –Dependant on the local area The Cost of Labor

Employee Costs Social Security Tax Unemployment Compensation Tax Worker’s Compensation Insurance Public Liability & Property Damage Insurance Fringe Benefits