Alternate Bidding: The West Virginia Experience 2011Virginia Concrete Conference March 3, 2011 Richmond, VA Bob Long Executive Director ACPA Mid-Atlantic.

Slides:



Advertisements
Similar presentations
A Look to the Future By: Pat Hughes, Dave Holt, and Ron Bumann.
Advertisements

AD/AB - LCCA 2 nd Session Wednesday, January 29th.
7-Year Pavement Warranties TEA, Omaha September 24, 2009 Paul Sosney Head Capital Award Ministry of Transportation Ontario.
Design and Construction Guidelines for Thermally Insulated Concrete Pavements Lev Khazanovich, UM John Harvey, UCD Joe Mahoney, UW September 12, 2007.
USE OF POLYURETHANE GROUT FOR CONCRETE PAVEMENT SLAB STABILIZATION Indiana County District 10-0 Lessons Learned 1.
Concrete Overlay (Whitetopping) in MD
CALTRANS EXPERIENCE WITH WARRANTIES. WHY WARRANTY The Right Strategy at the Right Time Shift Responsibility of Quality Control to Contractor State Responsibility.
Presented at: Rutgers Asphalt Paving Conference March 8, 2011 Presented by: Eileen Sheehy, P.E. Manager, Bureau of Materials NJDOT.
Michigan Department of Transportation Perpetual Pavement Rep. Rick Olson’s 2012 Best Practices Conference on Road and Bridge Maintenance Curtis Bleech.
Pavement Type Selection (Designs, Costs & Bidding) 9 th Annual Concrete Conference for the Maryland Transportation Industry March 24, 2009 Timonium, MD.
COUNTY OF SAN DIEGO DEPARTMENT OF PUBLIC WORKS County of Los Angeles Public works 2015 Sustainable Pavement Round Table February 10, 2015.
City of Auburn Hills Road Asset Management Program February 21, 2014 SEMCOG University.
Uniform Paving Platform Regional Asphalt Seminar, Blacksburg, VA March 12, 2015 David P. Shiells, P.E. District Materials Engineer.
Regional Asphalt Seminars Pavement Wedge Guidelines and Specifications EMMETT R. HELTZEL, P.E. STATE MAINTENANCE ENGINEER.
 Narrow roadway, with no shoulders  Poor pavement condition  AADT 405/150 – Low Traffic Volume  Ideal candidate for P.I.P.
Construction of LLP HMA Pavements Pre-bid Meeting Solano 80; 04-4A0104 District 4 Oakland, CA September 14, 2012 Bob Humer.
mydocs-presentations-2011PAPAMWF-EricaRevisions
Concrete Paving: Opportunities for Virginia Robert R. Long, Jr. Executive Director American Concrete Pavement Association Mid-Atlantic Chapter October.
Alternate Bidding in Missouri Transportation Estimators Association Annual Conference November 2-4, 2005 – Daytona Beach, FL Interstate 44 … South-Central.
Corridor #5 Update United States Senate Briefing September 26, 2007.
Sustainability Specifications and Implementation February 26, 2015 Affan Habib, P.E. Pavement Program Manager.
1 Introduction to QA/QC Process. 2 CHECKLISTS SheetsItems to CheckGeneral Reference YesYes NoNo N/AN/A General General Plan Content DM=Design Manual General.
Pavement Maintenance II
Saving Your Asphalt! 36 th Annual Rocky Mountain Asphalt Conference & Equipment Show February 18-20, 2009.
Pavement Preservation Protecting the Investment and the Environment R. Gary Hicks CP2 Center, Chico, CA Prepared for CEAC 2014 Conference March 26-28,
FUEL AND ASPHALT COST ADJUSTMENT PROVISIONS. Use of Cost Adjustment Provisions FHWA Technical Advisory Dec 10, 1980 –“Price volatility of construction.
Roadway Preservation Intranet Page. Location: Intranet/Roadway-Preservation.aspx.
TRIBAL INVOLVEMENT IN EVERY DAY COUNTS IVAN MARRERO, P.E. ASSISTANT DIVISION ADMINISTRATOR FHWA-OKLAHOMA DIVISION.
Survey Responses Regarding Current Issues and Approaches for: Price/Supply Issues, Alternate Bidding Issues, Practices for Increasing Competition Prepared.
TEA, Portland, Maine Travis Koestner Missouri Department of Transportation October 20, 2006 Alternate Paving Update $$ Cost Control at MoDOT $$
Concrete Pavements The Right Tool for The Right Job.
SESSION 8 Shoulder Considerations. Objectives Identify shoulder/edge support types Describe benefits of each type Discuss how edge support conditions.
 Have an approved mix design before paving.  The department has eliminated the use of PG -22 Asphaltic Material and replaced it with PG -28.  Tack.
Chapter 3 Framework for Treatment Selection From… Maintenance Technical Advisory Guide (MTAG)
Enacted in 1990, CAPP is funded with 0.45 cent of the fuel tax which generates approximately $28 million per biennium. The CAPP is a direct allocation.
Technical Services By Nathan Haaland.  Increase in Construction Costs  Asphalt  $350 to $735 per ton  Labor  3.6% increase  Inflation  13% increase.
AAPA Q TMR Senior Management Meeting 23 June 2010 – Sustainability - issues & options Sustainability - issues & options Rob Vos Queensland Executive.
1 Reclaimed Asphalt Pavement in Arizona - Application and Verification October 3, 2008 Arizona Association of County Engineers.
Session #3 Asphalt 103- Materials: Basics of RAP, Usage and Specifications.
Alternate Technical Concepts AASHTO Subcommittee on Design July 28, 2010 Columbia, S.C. KATHY HARVEY State Design Engineer Missouri Department of Transportation.
PennDOT’s 2010 Program Rebecca S. Burns, P.E. Acting Director Bureau of Construction and Materials 11 th Annual Pennsylvania Concrete.
$18 Million Benefits of Using Ground Tire Rubber In Asphalt: Eleven Years of Success George Way, P.E. Arizona DOT.
LTPP Lessons Learned: Delaware SPS-2 Wednesday April 9, 2014 SPS-2 Tech Day, Dover, DE Gabe Cimini Project Manager, LTPP North Atlantic Regional Support.
Alternate Bid on Pavement Projects Overview Keith Shannon Director, Office of Materials and Road Research Mn/DOT – ACEC Annual Consultant Conference March.
Module 3-4 Cold Milling. Learning Objectives  Describe the cold milling process  Describe the characteristics of typical milling equipment  Describe.
2003 Warranty Presentations Caltrans WARRANTED HMA PAVEMENTS PAVEMENTS.
Gary Hicks and Rob Marsh Gary Hicks and Rob Marsh April 19, 2005 April 19, 2005 Pavement Preservation Sub-Group on Strategy Selection & Evaluation.
Paving the way for over 60 years Presentation at the January 10, 2007 NCAUPG Technical Conference By Dusty Ordorff Bituminous Roadways, Inc.
What is a Resource? Any physical or virtual entity of limited availability A new or reserve supply that can be drawn upon when needed Something that one.
STH 21 Adams County Project # Project Specifics Project Specifics Asphaltic Pavement Milling Asphaltic Pavement Milling Pulverizing Shoulders.
IRI T ESTING IN N ORTH C AROLINA Presented by Christopher Bacchi, PE Vice President, Trimat Materials Testing, Inc. Raleigh, NC.
Using Reflective Crack Interlayer-
Asphalt Pavement Association of Indiana Annual Winter Conference Michael B. Cline Commissioner, INDOT December 14, 2010.
UPDATE ON PAVING PROJECTS “TIMES THEY ARE A CHANGING” VRMCA Fall Convention September 7-9, 2008 Hilton VA Beach Oceanfront Virginia Beach, Virginia Robert.
The Highway Fund – Planning, Measuring, and Reporting Mike Holder, PE, Chief Engineer 2015 CAPA / DOT Workshop February 24, 2015.
Pavement Preservation Program Emily McGraw, PE February 23 and 24, 2015 – NCDOT & CAPA Workshop.
Highway Network System
John Donahue, P.E. Missouri DOT 5 th Annual Building Green with Concrete Workshop June 21, 2012.
ORDINANCE # Authorizing $372,760 for traffic signal interconnect at 47 th Street and Emanuel Cleaver II Boulevard Start of project End of project.
Jerry L. Larson IRMCA Indiana LTAP Basics of a Good Road
Micro-milling The Economics A Rehabilitative Strategy for Savings Presented By: Sheila Hines Georgia Department of Transportation.
VDOT’S PREVENTIVE MAINTENANCE TECHNIQUES & EXPECTATIONS
Alabama Asphalt Pavement Association
Florida APT Update.
Thin Lift Asphalt Overlays
David P. Shiells, P.E. District Materials Engineer
Thin Hot Mix Asphalt Overlays PennDOT Research Findings
2018 Pavement Workshop May 23-24, 2018
Driving Indiana’s Economic Growth Bidding Alternate Pavement Designs
Hoops, haddock, cascade, oriole, Ervin and valley view heights paving
Presentation transcript:

Alternate Bidding: The West Virginia Experience 2011Virginia Concrete Conference March 3, 2011 Richmond, VA Bob Long Executive Director ACPA Mid-Atlantic Chapter

Evolution of Alternate Design Alternate Bid (ADAB) Procedures  Joint efforts began in the Fall 2007 including WVDOH, FHWA and industry.  Formal procedures implemented in July 2008  All procedures finalized June 2010

CORRIDOR H – US 48 MOOREFIELD (July 2008)  First “formal” Alternate Bid pavement project  10.6 miles  4-lane arterial  No life cycle cost adjustment (C factor)  Included asphalt escalator  Asphalt by the ton and PCCP by the SY

CONCRETE PAVEMENT DESIGN Description:  Perpetual pavement design provided by Industry using Westergaard Equations Design  10” Jointed Plain Concrete Pavement on 4” free draining base  15’ doweled joints  Full depth tied concrete shoulders Assumptions: Analysis period = 50 yrs Initial performance period = 22 yrs Rehab performance period for CPR = 14 yrs Rehab performance period for Overlay = 14 yrs No Salvage year 50 Rehab #1 – diamond grinding and 7.5% joint patching Rehab #2 – overlay w/2” skid resistant mix w/PMA and 2% joint patching 10” Jointed Plain Concrete Pavement 4” Free Drain Base Pavement Typical

ASPHALT PAVEMENT DESIGN Description:  Perpetual pavement design provided by Industry using PerRoad 3.2 Design Program  13.5” HMA on 4” free draining base  Use PG polymer modified asphalt (PMA) binder in top 4.5” and on future overlays  Increase AC by 0.5% in bottom 5” Assumptions: Analysis period = 50 yrs Initial performance period w/PMA = 22 yrs Rehab performance period w/PMA = 14 yrs No salvage year 50 Rehab #1 – mill and resurface w/2” skid resistant mix w/PMA Rehab #2 – mill and resurface w/2” skid resistant mix w/PMA 2” 12.5mm skid w/76-22 AC 2.5” 19mm mix w/76-22 AC 4” 25mm mix w/64-22 AC 5” 37.5mm mix w/64-22 AC + 0.5% AC content 4” Free Drain Base Pavement Typical

PROJECT NUMBER & BIDDERSBID APD-0484(308) (X312-H-93.38) Kokosing Construction Co., Inc. (PCCP) 34,544, Hi-Way Paving, Inc. (PCCP)36,137, Anthony Allega Cement Contractor, Inc. (PCCP) 36,995, West Virginia Paving, Inc. (Asphalt) 38,072, McCarthy Improvement Company (PCCP) 41,096, Cherry Hill Construction, Inc. (PCCP) 44,354, West Virginia Department of Transportation Division of Highways Bid Results - Letting of July 15, 2008

SECTION 690 MAINLINE PAVEMENT 690 – GENERAL DESCRIPTION: This Special Provision shall define the requirements to construct mainline pavement, which includes roadway pavement and full depth paved shoulders, to the limits as shown by the contract plans. The contractor shall construct one of the pavement systems as described herein and by the contract plans.

CONCRETE PAVEMENT SYSTEM: A concrete pavement system shall be constructed as defined by the concrete typical section(s) and all other documents referenced in the contract plans. This work and materials shall include jointed plain concrete pavement, free draining base, fabric for separation, subgrade, and subgrade preparation ASPHALT PAVEMENT SYSTEM: An asphalt pavement system shall be constructed as defined by the asphalt typical section(s) and all other documents referenced in the contract plans. This work and materials shall include asphalt wearing surface, asphalt base courses, free draining base, fabric for separation, subgrade, and subgrade preparation..

RECENT ADAB PROJECTS WV 10 – 3.7 miles l 4-lane arterial on new alignment – pre-graded l 10” PCCP vs ” Asphalt l Bid by the SY of Mainline Pavement l 4 of the 6 bidders bid concrete and the low concrete bid was 17% lower than asphalt l Low SY price was $60.00 King Coal US52 – 9.5 miles l Pre-graded and bid by the SY of Mainline Pavement l 10” PCCP vs. 11.5” Asphalt l 5 out of 6 bidders went concrete and the concrete bid was 3% lower than asphalt l Low SY price was $48.45

RECENT ADAB PROJECTS WV Corridor H, US 48 – 3.3 miles l 4-lane arterial on new alignment – pre-graded l 10” PCCP vs. 13.5” Asphalt l Bid by the SY of Mainline Pavement l 4 of the 5 bidders bid concrete and the low concrete bid was 29% lower than asphalt l Low SY price was $46.40

RECENT ADAB PROJECTS US Route 35, Putnam County – 14.5 miles l Design build – lump sum bid l 4-lane arterial with structures on new alignment – grade, drain, pave & structures l Bid by the SY of Mainline Pavement l 10” PCCP vs. 12.5” Asphalt l Four proposers – 3 confirmed use of concrete pavement l Successful team went with concrete

RECENT ADAB PROJECTS WV Corridor H, US 48 – 6.0 miles l Design bid build l 4-lane arterial with structures on new alignment – grade, drain, pave & structures l Bid by the SY of Mainline Pavement l 10” PCCP vs. 12.5” Asphalt l Low bidder went with concrete l Low SY price was $44.50

THE RESULTS  8 out of 9 projects went concrete when bid as an alternate to asphalt  On these projects about 80% of the bidders have bid concrete and all have had at least 4 bidders  WVDOH has saved $9,800,000 just on the four paving jobs alone over the low asphalt bids.

UPCOMING ADAB PROJECTS 1. Route 9 - Charlestown - VA line – 3.1 miles paving only 2. Corridor H - Rte. 1 to Mount Storm – 11.8 miles paving only 3. Corridor H - Mount Storm to Parsons - 10 miles grade, drain, & pave

Why ADAB “Works” in WV  WVDOH senior management support  Strong new construction program  Equivalent designs  Economized PCCP design (no seal, no dowels in shoulder, no cure on CTOGB  Most asphalt work controlled by one company

FALLOUT INTEREST  One new CPR projects is complete with 2 more about to come out  Concrete was bid as an alternate on an asphalt overlay job  The WV Turnpike is looking at concrete overlays instead of just asphalt  Extensive statewide concrete pavement training requested and delivered  Concrete is no longer a “four-letter word” – ACPA’s phone is ringing!

Alternate Design Alternate Bid Questions?????

THANK YOU!