DEVELOPMENT OF ULTRA MEGA POWER PROJECTS A MAJOR INITIATIVE UNDER POWER SECTOR REFORM Director (Projects) Power Finance Corporation Ltd. Chairman Sasan.

Slides:



Advertisements
Similar presentations
Hydropower Development Policy & Regulatory Framework
Advertisements

1 Power Development Strategy INDIA R.V. SHAHI SECRETARY MINISTRY OF POWER GOVERNMENT OF INDIA Presentation in World Bank, Washington DC June 23, 2003.
1 Presentation on Investment Opportunities in Indian Power Sector and Cooperation with IEA By R.V. SHAHI Secretary, Ministry of Power Government of India.
Petroleum, Chemicals and Petrochemicals Investment region (PCPIRs) Specialty Chemicals Conclave
DEVELOPMENT OF ULTRA MEGA POWER PROJECTS Shyam Wadhera Director (Projects) Power Finance Corporation Ltd. 11 th May, 2006.
Barriers to Adoption of Clean and Efficient Technologies in the Indian Power Sector: An Analysis Using AHP Anoop Singh, S. C. Srivastava Indian Institute.
1 Presentation on Indian Power Sector Government of India April, 2006.
ROLE OF REGULATORS FOR ENERGY SCENARIO by Vijoy Kumar Chairman, UPERC.
1 Presentation on Indian Power Sector : Key Issues By R.V. SHAHI Secretary (Power), Government of India November 16, 2006 Power Ministers’ Conference on.
Regulatory Environment and Small-hydro Development Professor Priyantha D C Wijayatunga Public Utilities Commission of Sri Lanka and University of Moratuwa.
Regulatory framework in the Energy Sector Chairman Ph.D. Tserenpurev Tudev Energy Regulatory Commission of Mongolia Energy Mongolia-2012 Ulaanbaatar Mongolia.
1 Presentation on Indian Power Sector Government of India June, 2006.
A Primer on Electric Utilities, Deregulation, and Restructuring of U.S. Electricity Markets W.M. Warwick July 2000 Revised May 2002.
1 Framework Required to Ensure Long-term Sustainability - Environmental and Socio- cultural concerns.
1 Business Opportunities Istanbul, Turkey 30 April 2010 Asian Development Bank.
SOLAR ENERGY The Next Sunshine Sector. India’s Entrepreneurship Success has been based on the 3 stage mantra The Indian Growth Story Timely Entry 2000.
Solar Energy in Gujarat Some Aspects of Regulatory Decision-making Dr. P. K Mishra Chairman Gujarat Electricity Regulatory Commission Forum on Clean Energy,
Electricity Reforms and Regulations in Nepal Navin Dahal South Asia Watch on Trade, Economics & Environment (SAWTEE)
Renewable Energy Support Schemes & Capacity Building Needs Benon Bena Manager, Off-Grid Renewable Energy Development Rural Electrification Agency-Uganda.
RENEWABLE ENERGY POLICY. Renewable energy is energy that comes from resources which are continually replenished such as sunlight, wind, rain, tides, waves.
ENHANCING THE POLICY FRAMEWORK FOR SUSTAINABLE ENERGY INVESTMENT Guidance from the OECD to developing and emerging economies Karim Dahou, Investment Division,
1. Objective of Seminar Energy sector at a glanceProfiles in Energy SectorAbout SynergemSeizing the opportunities 2.
Electricity Reforms in Bangladesh
POWER SECTOR POLICY OVERVIEW ASSOCIATION FOR POWER UTILITIES OF AFRICA (APUA) SCIENTIFIC COMMITTEE CONFERENCE Presentation by Mr. M. Mulasikwanda Department.
 Energy Conclave 2006 Energy and Sustainable Development July 2006.
Comparative Legal and Regulatory Framework of Nepal and India relating to Hydropower Development Advocate Amar Jibi Ghimire.
E P D K 1 Turkish Electricity Market and Recent Developments Cemal Çelik Energy Expert EMRA-TURKEY March ANTALYA.
CHITALE & CHITALE PARTNERS 1 POLICY FRAMEWORK FOR TRANSMISSION & DISTRIBUTION IN POWER SECTOR ADVOCATES & LEGAL CONSULTANTS ONGCONGC.
1 Power – The Wind Way. 2 Windy Years India Currently holds a cumulative capacity of over 21000MW in India. Wind power growth in India has seen various.
United Nations Procurement Division
Liberalization of Electricity Market in Taiwan Su, Jin-sheng Energy Commission Ministry of Economic Affairs August 8, 2001.
The Future of Energy Markets in India: Structure and its Regulation Anoop Singh Dept. of Industrial and Management Engineering, Indian Institute of Technology.
Challenges Facing the Power Sector “India the Next Decade” Chatham House 27 th June 2005 Mike McWilliams Director, Scott Wilson.
Topics  Renewable Energy  Electricity prices and retail competition  TXU Acquisition  Legislative Session.
CAPTIVE POWER POLICY. Section 44 of the Electricity(Supply) Act, 1948 gave birth to Captive Generation.  Any other person to establish or to acquire.
International Coal Conference nd October 2011 Coal – the Way to achieve energy security for Pakistan By Mohammad Younus Dagha Secretary Coal &
India. Agenda Introduction Industry Structure and Regulations In Power Other Initiatives in Power Industry Natural Gas Markets Privatization Initiatives.
Power Trading By P.S.Bami President – India Energy Forum & Former Chairman & Managing Director, NTPC 1.
Energy Conclave 2006 Presentation by Debashish Majumdar, Managing Director Indian Renewable Energy Development Agency Limited New Delhi July 27, 2006 Implementing.
Sanjeev Aggarwal Amplus Infrastructure Developers Private Limited Clearances and Land Acquisition for Coal Blocks Way Forward to Meet Demand of Coal.
LEGAL FRAMEWORK, POLICIES AND REGULATIONS AND ORGANIZATIONAL SET UP IN INDIA -Dr. Aditi Raja Director, Finance, KPTCL
Divider custom What’s this layout for? Use this if you with to change the colour of the lines Sustainable Power – Unpacking the Buzz Word The world’s leading.
Power Trading The Indian electricity sector has grown manifold since independence making India the third largest producer of electricity in Asia. The installed.
OVER VIEW OF INDIAN POWER SECTOR INDIAN POWER SECTOR 27 th January, 2010.
PPP Legal & Regulatory Framework. PPP Policy In July 2008 GOK approved the PPP policy directive through which: PPPs are identified as a method for investing.
Ministry of Science, Technology and the Environment, Malaysia CLEAN DEVELOPMENT MECHANISM: MALAYSIA’S EXPERIENCES BY DR NADZRI YAHAYA DEPUTY DIRECTOR CONSERVATION.
Institutional arrangement for energy statistics in India D. Sahoo Dy. Director General Central Statistical Organization, India.
QUOTE “We live in a post war world. Today shooting wars are exception. But are we entering an era of Resource Wars?. And energy is the principal resource.
Presentation to Select Committee on Economic Development
 Contract by Public Authority for provision of asset and/or services  With private entity  Private finance used to fund asset/service  Long-term in.
LEGAL FRAMEWORK, POLICIES AND REGULATIONS AND ORGANIZATIONAL SET UP IN INDIA -Dr. Aditi Raja Director, Finance, KPTCL
Presentation on Capacity Addition targets for X th Plan MINISTRY OF POWER 2 nd May 2002.
PROPOSED AMENDMENT TO EA,2003 OCTOBER,2015 by RAKESH NATH.
SRLDC 1 COMPETITION IN GENERATION Power Grid Corporation of India Limited New Delhi, India.
Eng Salma Hussien Egyptian Electric Regulatory and Consumer Protection Agency Renewable Energy Strategy Plan.
EABC/EAC ENERGY CONFERENCE: 8-9TH JUNE, AVAILABLE BUSINESS OPPORTUNITIES IN THE ENERGY SECTOR By Eng. B.J. Mrindoko.
Energy Sector of Turkey “General Overview and Policy Objectives” Sinem ÇAYNAK General Directorate for Energy Affairs IEA Turkey IDR Meeting December 8,
Here Renewable Energy Independent Power Producer Programme Bidder’s Conference 16 August 2012 Andrew Etzinger Senior General Manager Eskom.
5 th ERRA Annual Meeting Country News – The Russian Federation Krasnodar Territory Sergei Milovanov Regional Energy Commission – Prices and Tariffs Department.
RENEWABLE ENERGY REGULATION IN KENYA KENYA-SPAIN MULTILATERAL PARTNERSHIP MEETING HELD AT CROWNE PLAZA Presented by Caroline Kimathi Asst Manager, Licensing.
Georgy TAVADZE Chairman Georgian National Energy Regulatory Commission (GNERC) Budapest, Hungary April 14, th Annual Meeting of the Energy Regulators.
1 Financial Sector Development in Myanmar Presented by Mr. Nyo Aye Mr. Win Hteik Assistant Director Board Secretary Ministry of Finance Central Bank of.
CARILEC. An Association of Electric Utilities CARILEC An Association of Electric Utilities The Caribbean Electric Utility Service Corporation (CARILEC)
Damitha Kumarasinghe Director General
Renewable Energy Development in India
Challenges in Financing Renewable Energy
Public Private Partnerships
UNIT 1 B ROLE OF ENTREPRENEUR.
Presentation to the Parliamentary Portfolio Committee
India Energy Congress 2013 Sustainable Sources of Energy February 2013.
Presentation transcript:

DEVELOPMENT OF ULTRA MEGA POWER PROJECTS A MAJOR INITIATIVE UNDER POWER SECTOR REFORM Director (Projects) Power Finance Corporation Ltd. Chairman Sasan Power Ltd & Coastal Gujarat Power Ltd. Presented By: Shyam Wadhera 22 nd January 2007

Total Generation Capacity 1,27,673 MW Comprising of : Hydro 33,600 MW (26%) Nuclear 3,900 MW (3%) Thermal 83,982 MW# (66%) Renewables 6,191 MW (5%) # (Coal 69,198 MW, Gas 13,582 MW and Oil 1202MW) (70,569 MW) (41,673 MW)(15,431 MW) In addition to above captive generation capacity of appx. 41,000 MW. POWER INFRASTRUCTURE IN INDIA (As on Oct, 2006)

GROWTH OF POWER SECTOR IN INDIA *To electrify these rural households ( 78 mn) in next five years, Rajiv Gandhi Gramin Vidyutikaran Yojana has been launched. Census Results PLF (%) Energy Shortage (%) Peaking Shortage (%) Households Access to Electricity (%) Rural Households Coverage (%) *-

PER CAPITA CONSUMPTION OF ELECTRICITY IN INDIA (kwh/ year) Growth pattern over years In 1950 Electricity consumption per capita was 15 kwh In 2012 it is projected at 1000 kwh. Brazil:2070 China:1200 Thailand:2000 Malaysia:

CHALLENGES AND P0LICY RESPONSES Eliminating Shortages- Peaking 11.2%, Energy 7.1%. Adding 1,00,000 MW capacity by Stepping up Public Investments. Nurturing Private Sector- Present share 11%. Electricity Act –2003 and National Electricity Policy. Rural Electrification- 56% Rural households yet to be electrified Financial Viability- SEB losses though reducing, yet very high. Improving quality of supply. Completion of electrification in next five years- Rajiv Gandhi Gramin Vidyutikaran Yojana launched. Total Village Electrification by Distribution Reforms : Reduction in Aggregate Technical and Commercial (AT&C) losses.

VISION FOR POWER SECTOR By year 2012 : Per capita availability 1000 units. Installed capacity over 200,000 MW. Spinning reserves 5%. Minimum lifeline consumption of one unit per household per day. Inter-regional transmission capacity: 37,000 MW. Energy efficiency/ conservation savings about 15%. Quality and reliable power supply.

ELECTRICITY ACT 2003 – Salient Features The Act creates a liberal and transparent framework for power development. It facilitates investment by creating competitive environment and reforming distribution segment of power industry. Entry barriers removed / reduced delicensed generation. freedom for captive generation including group captive. trading recognised as an independent activity. open access in transmission already in place. Open access to consumers above 1 MW within five years from Jan 2004 (date of enforcement of amendment to Electricity Act). Multiple licenses in distribution.

ELECTRICITY ACT Implementation Most of the Rules (required to be framed by Central Govt.) notified. Open Access in transmission notified by CERC : Jan, 2004 Guidelines for determining tariff through competitive bidding notified: Jan 2005 National Electricity Policy announced: Feb, 2005 Regional Power Committees for all the 5 regions established: May 2005 Appellate Tribunal for Electricity : Operational July, Electricity/Tariff Policy notified : Jan 2006 Guidelines for private investment in transmission: April 2006 Several SERCs have initiated action for open access in Distribution.

The Govt. Of India is committed to add 100,000MW by 2012 to meet its mission of Power to All. This requires significant capacity addition during remaining period of 10 th Plan & entire 11 th Plan, which may not be possible from the ongoing and new generation projects already identified. As such there is need to develop large capacity generation projects at the national level to meet the requirement of number of states. The Ultra Mega Projects are proposed to be taken up under the competitive bidding guidelines and will enable establishment of large capacity through private investments. LAUNCHING OF ULTRA MEGA POWER PROJECTS

Ministry of Power Policy Interventions Inter-Ministerial co-ordination State Government support Central Electricity Authority Site selection Resolution of Technical Issues Power Finance Corporation Ltd. Nodal agency for setting up Shell Companies (SPVs) for each project. Managing the bid process. AGENCIES INVOLVED

CONCEPT Setting up of large projects of 4000 MW at a single location: ensuring economies of scale Award of projects to developer through tariff based competitive bidding : ensuring cheaper power Utilisation of super critical technology: ensuring higher efficiency and lower CO 2 emissions APPROACH Guidelines for determination of tariff through bidding process were issued on 19 th January, 2005 under Section 63 of the Electricity Act, These provide for procurement of power by Distribution Licensees through competitive bidding Separate SPVs for each project to undertake project development activities including bid process management on behalf of procurers DEVELOPMENT OF ULTAR MEGA POWER PROJECTS THROUGH COMPETITIVE BIDDING

Contd….. DEVELOPMENT OF ULTAR MEGA POWER PROJECTS THROUGH COMPETITIVE BIDDING TECHNICAL FEATURES Utilisation of higher efficiency super critical technology with unit size of 800 MW Station capacity of about 4000 MW (5x800 MW) Flexibility re: unit size to be permitted, subject to meeting thermal efficiency requirements FINANCIAL ASPECT For achieving financial closure, past experience highlights critical importance for Government intervention to: secure reliable fuel supply. obtain environmental clearances. land acquisition and resolution of R&R issues. co-ordination with states & bulk power purchasers.

ROLE OF MINISTRY OF POWER Ministry of Power to be facilitator for co-ordination with concerned Ministries/ agencies and State Govts. for ensuring: Coal block allotment for pithead projects Environment/ forest clearances Facilitate acquisition of land Required support from State Govt. & its agencies

ROLE OF SHELL COMPANIES ( SPVs ) To acquire land for the project and coal mine taking contribution from procurers against land cost Allocation of coal blocks for pit-head projects. Allocation of water by the State Govt. for pit-head locations To get approval for use of sea water from Maritime Board/ other Govt. Agencies for coastal locations Statutory clearances from MoEF/ Civil Aviation/ Defence etc. To obtain various approvals from the central government and state government as are required to be obtained for the project and coal mines

…contd ROLE OF SHELL COMPANIES (SPVs) Shell Companies to take action for (contd.): Appointment of Consultants to undertake studies/ surveys and preparation of bankable project report Appointment of Consultants for International Competitive Bidding (ICB), document preparation & evaluation Appointment of Rating Agencies for Green Field Project Rating Tie up for off-take/ sale of power to distribution utilities. To finalise RfQ/ RfP documents in consultation with states/ bidders To carry out RfQ/ RfP process and award of project Shell Company will be transferred to the successful bidder for execution of project.

BIDDING PROCESS Notice inviting Expression of Interest(EoI) Two stage bidding process Request For Qualification (RFQ) containing qualifying criteria Request For Proposals (RFP) from the qualified bidders High Level Committee consisting of Member(Thermal) CEA, Director (Projects) PFC and Representatives of FIs (MD SBI, MD IDFC and MD IDBI) for selection of Consultants and Qualifying/ shortlisting Bidders Evaluation Committee consisting of Chairperson/ CEO of the Bank/ FI, Chairperson CEA, CMD PFC & Representative of the power purchasers for final selection of developer

PAYMENT SECURITY MECHANISM As Condition in PPA : Letter of credit (LC) by distribution utilities Escrow on the receivables of distribution utilities In the event of default by any procurer : Other procurers have the first right to buy power share for which payment default has occurred. In case of unwillingness of other procurers to buy default power, the same can be sold in the All India market through prevailing open access in transmission either directly or through traders. If any further power share is still unsold, direct supply to HT consumers as per provisions of the Electricity Act 2003 to be accepted upfront (7 Purchasing States in Sasan and 5 in Mundra have initialed PPA on 9/10/06 and confirmed power allocation / PSM)

Looking at the Success of two initially identified Ultra Mega Thermal Power Projects, one at Sasan in M.P. (Pithead) and other at Mundra in Gujarat (coastal), it has been proved that it is possible to overcome the hindrances being faced by large generation projects in getting the clearances and awarding them on tariff based competitive bidding. The present model adopted by PFC can be repeated by power procurers which in turn would add additional generation capacity to the Nation at most competitive tariff in minimum time. In addition to above Ministry of Power is also taking steps for bringing up large Hydro Projects and large size Transmission Projects on the fast track similar to Ultra Mega Power Projects(Thermal). WAY AHEAD FOR ULTRA MEGA POWER PROJECTS

THANK YOU