CFS TIME SCHEDULE EDR - CFS Europe – Kick-Off Meetings Kick-Off Meetings, CERN, 3, 4, 5 September 20071 ILC PROJECT ENGINEERING DESIGN REPORT CFS Europe.

Slides:



Advertisements
Similar presentations
Summary of Report to IATI Steering Committee, Paris 9 February 2011 Richard Manning.
Advertisements

Copyright OSIconsult TTCOM-4.PPT/hoffmann/nov00/1 Criteria for a successful proposal Dr. Harald Hoffmann OSIconsult GmbH Simmeringer Hauptstrasse 24 A-1110.
MINISTRY OF REGIONAL DEVELOPMENT AND PUBLIC WORKS DG “PROGRAMMING OF THE REGIONAL DEVELOPMENT” OPERATIONAL PROGRAMME “REGIONAL DEVELOPMENT” EVALUATION.
Managing Evaluations for Consistently High Quality American Evaluation Association Annual Conference Molly Hageboeck.
Good Evaluation Planning – and why this matters Presentation by Elliot Stern to Evaluation Network Meeting January 16 th 2015.
Weekly Risk Report & Performance Metrics
4.5 Multimedia Production
1 Use and content of the RFP  Request for Proposals (RFP) is similar to bidding documents and include all information of the assignment, selection of.
Copyright Course Technology Chapter 11: Project Procurement Management.
Project Procurement Management
Proactive Management of Project Schedule Shimon Zeierman Rafael Advanced Systems Ltd.
Greg Baker © Part One The Foundations – A Model for TQM Chapter # 3 Design for quality.
Fundamentals of Information Systems, Second Edition
GDE Meeting B Barish 16-Aug-05 The GDE – who, what and how? The BCD – what is it? Internal Organization toward BCD What do we want out of Snowmass? How.
Iterative development and The Unified process
EVALUATION AND QUALITY ASSURANCE STRATEGY PRESENTED BY DR SHYAM PATIAR.
Chapter 2 A Strategy for the Appraisal of Public Sector Investments.
System Implementation
Lord Mogg Chair of ERGEG Florence Forum June 2009 Implementation of the Third Energy Package.
Environmental Impact Assessment Prepared by: Miss Syazwani Mahmad Puzi School of Bioprocess Engineering UniMAP.
S/W Project Management
TEMPUS IV- THIRD CALL FOR PROPOSALS Recommendation on how to make a good proposal TEMPUS INFORMATION DAYS Podgorica, MONTENEGRO 18 th December 2009.
9 Closing the Project Teaching Strategies
PPMT CE408T Engr. Faisal ur Rehman. Presentation Outline Project Porcurement Managment Project Closure.
المحاضرة الثالثة. Software Requirements Topics covered Functional and non-functional requirements User requirements System requirements Interface specification.
Demystifying the Business Analysis Body of Knowledge Central Iowa IIBA Chapter December 7, 2005.
IPA Funds Programme Management sept Bölgesel Rekabet Edebilirlik Operasyonel Programı’nın Uygulanması için Kurumsal Kapasitenin Oluşturulmasına.
WB Carbon Finance Project Cycle and Role of Key Players Introduction to Carbon Finance March 10, 2004.
Rev. 0 CONFIDENTIAL Mod.19 02/00 Rev.2 Mobile Terminals S.p.A. Trieste Author: M.Fragiacomo, D.Protti, M.Torelli 31 Project Idea Feasibility.
Nick Walker, Brian Foster LAL, Orsay WP2: Coordination with the GDE.
Introduction Complex and large SW. SW crises Expensive HW. Custom SW. Batch execution Structured programming Product SW.
LCFOA Meeting at SLAC Linear Collider Forum of the Americas 1 LINEAR COLLIDER FORUM OF THE AMERICAS CONVENTIONAL FACILITIES OVERVIEW Victor R. Kuchler.
Regular process for global reporting and assessment of the state of the marine environment, including socio-economic aspects Guidance for Authors.
© Commonwealth of Australia 2003 The Quality Assessment Framework.
CLIC Implementation Studies Ph. Lebrun & J. Osborne CERN CLIC Collaboration Meeting addressing the Work Packages CERN, 3-4 November 2011.
DESY_ILCW07 Global Design Effort-CF&S 1 Beam Delivery System & Interaction Region Fred Asiri CF&S Point of Contact.
Fundamentals of Information Systems, Second Edition 1 Systems Development.
United Nations Economic Commission for Europe UNECE Transport Division 1 TRANS-EUROPEAN RAILWAY (TER) PROJECT 2 nd Expert Group Meeting (Budapest, 23 September.
Chapter 11: Project Procurement Management
EN Regional Policy EUROPEAN COMMISSION Information and Publicity SFIT meeting, 12 December 2005 Barbara Piotrowska, DG REGIO
Module 5 Session 5.2 Visual 1 Module 5 Refining Objectives, Scope, and Other Project Parameters Session 5.2 Reviewing the PAR and refining key project.
1 Global Design Effort: Controls & LLRF Controls & LLRF Working Group: Tuesday Session (29 May 07) John Carwardine Kay Rehlich.
TEN-T Executive Agency and Project Management Anna LIVIERATOU-TOLL TEN-T Executive Agency Senior Programme and Policy Coordinator European Economic and.
Number: TR/06/B/F/PP/ WASTE-TRAIN VOCATIONAL TRAINING, EDUCATION, CONVEYING INFORMATION ON UP-TO-DATE WASTE MANAGEMENT PRACTICES TO DECISION MAKERS/STAFF.
Conventional Facilities and Siting GG Global Design Effort BILCW 07 - Beijing1 Conventional Facilities and Siting Global Group Summary Report.
1 Future Circular Collider Study Preparatory Collaboration Board Meeting September 2014 R-D Heuer Global Future Circular Collider (FCC) Study Goals and.
Proposal for a Global Network for Beam Instrumentation [BIGNET] BI Group Meeting – 08/06/2012 J-J Gras CERN-BE-BI.
EVALUATION OF THE SEE SARMa Project. Content Project management structure Internal evaluation External evaluation Evaluation report.
Conventional Facilities and Siting Global Group Global Design Effort CFS EDR Kick-Off Mtg, FNAL Aug 22 – 24, CFS EDR FNAL Kick-Off Planning.
ILC 2007 Global Design Effort 1 Planning Damping Rings Activities in the Engineering Design Phase Andy Wolski Cockcroft Institute/University of Liverpool.
EN Regional Policy EUROPEAN COMMISSION Information and Publicity Structural Funds Information Team Brussels, 30 June 2005 Barbara Piotrowska, DG REGIO.
Fred Asiri1 Conventional Facilities and Siting Global Group (CFS) SLAC Update Conventional Facilities and Siting Global Group (CFS) SLAC Update December.
CENTRAL EUROPE PROGRAMME PROJECT DEVELOPMENT FINANCIAL ISSUES Project development seminar Prague, 1 st February 2010 Luca FERRARESE JTS CENTRAL.
Fabrizio Gagliardi EGEE Project Coordinator EGEE is proposed as a project funded by the European Union under contract IST
Main Linac Technology (MLT) Meeting To be held through WebEx July 13, 2007.
IS&T Project Reviews September 9, Project Review Overview Facilitative approach that actively engages a number of key project staff and senior IS&T.
Cluster Host Preparation Meeting Autumn Term 1a Overview and Action Planning Judith Carter Senior Adviser Complex Needs/Vulnerable Learners
Regular process for global reporting and assessment of the state of the marine environment, including socio-economic aspects Guidance for Authors.
The SiD LOI Proposed Milestones and Schedules SiD Collaboration Phone Meeting September 6, 2007 John Jaros.
WP3 - Evaluation and proposal selection
Quality assurance in population and housing census SUDAN’s EXPERIANCE in QUALITY assurance of Censuses By salah El din. A . Magid OUR EXPERIANCE IN 5.
EIA approval process, Management plan and Monitoring
Conventional Facility & Siting (CF&S) Overview for the Positron Source
12.2 Conduct Procurements The process of obtaining seller responses, selecting a seller and awarding the contract The team applies selection criteria.
The ARC Process for New Program Proposals
Report on plan to produce an Engineering Design Report
ILC PROJECT ENGINEERING DESIGN REPORT CFS Europe – KICK OFF MEETING
Conventional Facilities and Siting Global Group (CFS) SLAC Update December 10, 2007 Acknowledgment: Jerry Aarons, Clay Corvin, and Esther Kweon Fred Asiri.
Business environment in the EU Prepared by Dr. Endre Domonkos (PhD)
DG AGRI, Unit F6 Bioenergy, biomass, forestry and climatic changes
Presentation transcript:

CFS TIME SCHEDULE EDR - CFS Europe – Kick-Off Meetings Kick-Off Meetings, CERN, 3, 4, 5 September ILC PROJECT ENGINEERING DESIGN REPORT CFS Europe – KICK OFF MEETINGS CERN 3, 4, 5 September 2007 TECHNICAL TIME SCHEDULE FOR CFS J-L Baldy

CFS TIME SCHEDULE EDR - CFS Europe – Kick-Off Meetings Kick-Off Meetings, CERN, 3, 4, 5 September TECHNICAL TIME SCHEDULE FOR CFS SUMMARY 1.Presentation of Time Schedules 2.Adopted “Philosophy” 3.ILC technical Time Schedule for CFS 4.Zoom 1 : EDR Phase 1 5.Zoom 2 : EDR Phase 2 6.Some additional comments Conclusions

CFS TIME SCHEDULE EDR - CFS Europe – Kick-Off Meetings Kick-Off Meetings, CERN, 3, 4, 5 September Presentation of Time Schedule It covers all main tasks from now until second year after To. It covers all main tasks from now until second year after To. To is when the official green light is given to the project. To is when the official green light is given to the project. It is tentative and based on European views (approved by the other Regions with some comments). It is tentative and based on European views (approved by the other Regions with some comments). It is a technical schedule : no delays or float is included for approval processes, political or financial negotiations….. It is a technical schedule : no delays or float is included for approval processes, political or financial negotiations….. However it is aimed at clarifying : However it is aimed at clarifying : the logical sequence of main tasks the logical sequence of main tasks a clear splitting of what should be taken by ILC GDE and what will be in the hands of the bidders (if their offers include the provision of CFS works) a clear splitting of what should be taken by ILC GDE and what will be in the hands of the bidders (if their offers include the provision of CFS works)

CFS TIME SCHEDULE EDR - CFS Europe – Kick-Off Meetings Kick-Off Meetings, CERN, 3, 4, 5 September Adopted «Philosophy» Get the necessary information from the Area, technical and global systems as soon as possible (on critical path) Get the necessary information from the Area, technical and global systems as soon as possible (on critical path) Work as early as possible on an EDR phase 1 (3 sample sites) Work as early as possible on an EDR phase 1 (3 sample sites) Use the EDR phase 1 to carry out the bidding selection process for the “final” selected site Use the EDR phase 1 to carry out the bidding selection process for the “final” selected site Use the selected site to carry out on EDR phase 2 (fully focused on this site) Use the selected site to carry out on EDR phase 2 (fully focused on this site) Use EDR phase 2 to seek and obtain the official green light for the project (To) Use EDR phase 2 to seek and obtain the official green light for the project (To) Carry out the environmental studies as much as possible before To on the basis of EDR phase 1 (Bidder) and EDR phase 2 (Bidder + GDE) Carry out the environmental studies as much as possible before To on the basis of EDR phase 1 (Bidder) and EDR phase 2 (Bidder + GDE)

CFS TIME SCHEDULE EDR - CFS Europe – Kick-Off Meetings Kick-Off Meetings, CERN, 3, 4, 5 September 20075

CFS TIME SCHEDULE EDR - CFS Europe – Kick-Off Meetings Kick-Off Meetings, CERN, 3, 4, 5 September 20076

CFS TIME SCHEDULE EDR - CFS Europe – Kick-Off Meetings Kick-Off Meetings, CERN, 3, 4, 5 September 20077

CFS TIME SCHEDULE EDR - CFS Europe – Kick-Off Meetings Kick-Off Meetings, CERN, 3, 4, 5 September Some additional comments (1 ) Selection, updates, environment Selection of consultants for CE (as well as for other CFS systems) to be carried out by GDE-CFS. One consultant for each region (likely) Selection of consultants for CE (as well as for other CFS systems) to be carried out by GDE-CFS. One consultant for each region (likely) Selection of contractors for CE (possibly other CFS systems) to be carried out by the selected bidder if included in his offer Selection of contractors for CE (possibly other CFS systems) to be carried out by the selected bidder if included in his offer Area system updates : a number of iterations to be implemented with each CFS concerned system with a constant view on “value engineering” Area system updates : a number of iterations to be implemented with each CFS concerned system with a constant view on “value engineering” EDR phases 1 and 2 : see presentation on CFS Work Packages EDR phases 1 and 2 : see presentation on CFS Work Packages Environmental study phase 1 will be done by bidders with the aim of showing feasibility and assets of the proposed site Environmental study phase 1 will be done by bidders with the aim of showing feasibility and assets of the proposed site Environmental Study phase 2 will be the final one, done in close collaboration between GDE and selected bidder with the aim of obtaining the green lights from Host State / local authorities Environmental Study phase 2 will be the final one, done in close collaboration between GDE and selected bidder with the aim of obtaining the green lights from Host State / local authorities

CFS TIME SCHEDULE EDR - CFS Europe – Kick-Off Meetings Kick-Off Meetings, CERN, 3, 4, 5 September Some additional comments (2 ) Selection of ILC Site Pre-selection process : after world-wide “advertising” getting the number of potential bidders to (say) a maximum of 8, with a first assessment of their capability to build up a “serious” bid Pre-selection process : after world-wide “advertising” getting the number of potential bidders to (say) a maximum of 8, with a first assessment of their capability to build up a “serious” bid For pre-selection process, assistance to call for bids preparations, and evaluation of bids : necessity of a “top level” Panel of Experts (with prior information to all bidders) For pre-selection process, assistance to call for bids preparations, and evaluation of bids : necessity of a “top level” Panel of Experts (with prior information to all bidders) Composition of the panel could be : three internationally recognised external experts (one from each Region) plus two members of the GDE Management Composition of the panel could be : three internationally recognised external experts (one from each Region) plus two members of the GDE Management They would use a system of key parameters with weightings to set up a comparison matrix, and build up a solid selection proposal. They would use a system of key parameters with weightings to set up a comparison matrix, and build up a solid selection proposal.

CFS TIME SCHEDULE EDR - CFS Europe – Kick-Off Meetings Kick-Off Meetings, CERN, 3, 4, 5 September Some additional comments (3) Costs Among the most difficult questions to solve is the one of the supply of resources (manpower, cash, in kind) for tasks on the Time Schedule, before To on GDE side Among the most difficult questions to solve is the one of the supply of resources (manpower, cash, in kind) for tasks on the Time Schedule, before To on GDE side In other words : will all Work Packages be distributed and resourced in accordance with the time Schedule ? In other words : will all Work Packages be distributed and resourced in accordance with the time Schedule ? The costs of the bids to host is likely to be high. The costs of the bids to host is likely to be high. Any indemnities foreseen from GDE to non-selected bidders ? The cost of works proposed to be carried out by the bidders will not necessarily be the same as the one in the EDR cost estimate. How to compare the bids ? How to assess their level of contribution to the project ? The cost of works proposed to be carried out by the bidders will not necessarily be the same as the one in the EDR cost estimate. How to compare the bids ? How to assess their level of contribution to the project ?

CFS TIME SCHEDULE EDR - CFS Europe – Kick-Off Meetings Kick-Off Meetings, CERN, 3, 4, 5 September Some additional comments (4) EDR The CFS EDR Phase 1 Chapters will be put together from the EDR submissions from each one of the CFS Work Packages The CFS EDR Phase 1 Chapters will be put together from the EDR submissions from each one of the CFS Work Packages A CFS committee will be set in place to check consistency of the document. It will work in collaboration with the overall EDR committee. A CFS committee will be set in place to check consistency of the document. It will work in collaboration with the overall EDR committee. For phase 2 For phase 2 The site dependent chapters will be built up from the same ones in EDR Phase 1 (GDE + selected bidder) if one of the sample sites is selected The site dependent chapters will be built up from the same ones in EDR Phase 1 (GDE + selected bidder) if one of the sample sites is selected The site dependent chapters will be « written new » from the selected bid if this not the case The site dependent chapters will be « written new » from the selected bid if this not the case The site independent chapters will be refined from the same ones in EDR Phase 1, with the input of the selected site features. The site independent chapters will be refined from the same ones in EDR Phase 1, with the input of the selected site features.

CFS TIME SCHEDULE EDR - CFS Europe – Kick-Off Meetings Kick-Off Meetings, CERN, 3, 4, 5 September Conclusions The overall technical Time Schedule and zooms 1 and 2 will be useful tools : The overall technical Time Schedule and zooms 1 and 2 will be useful tools : To set methodology and sequence of tasks to be carried out until start of works To set methodology and sequence of tasks to be carried out until start of works To better understand who will do what ? To better understand who will do what ? To be used as an inter regional and inter system reference To be used as an inter regional and inter system reference To get a precise idea of the minimum necessary time spent from now to start of works (technically speaking !) To get a precise idea of the minimum necessary time spent from now to start of works (technically speaking !) Quite a few tough problems on the way (allocation of WP, resources, bidding process…) Quite a few tough problems on the way (allocation of WP, resources, bidding process…) A very challenging process indeed ! A very challenging process indeed ! Comments are of course welcome. Comments are of course welcome.