Evaluation of Bids and Contract Award Module 6: Session 7.

Slides:



Advertisements
Similar presentations
Office of Purchasing and Contracts Research Funded Procurement Outreach Training Level III Procurements $50,000 and Above.
Advertisements

Presentation by: Tshewang Gyeltshen. The SBD is prepared in line with the PRR 2009 & SBD Large Works General principals of procurement to be applied prescribed.
STANDARD BIDDING DOCUMENT PROCUREMENT OF GOODS (FOR VALUE UP TO NU.0.25 MILLION) Presentation by: Tshewang Gyeltshen.
USDA Child Nutrition Programs.  Procurement (purchasing rules) must apply to all purchases that are supported, in whole or in part, with non-profit food.
Determining Responsive Bids and Responsible Bidders and Offerors Presenter: J. Peter Stamps, CPPO, VCO VA Dept of General Services.
Request for Proposal - Best Value Generally RFP’s are created for large dollar technical purchases, services and consultants.  Consideration in addition.
Contents Introduction General Description of Tender Process Threshold Requirements Submission of Bids Evaluation Award Post-Award Actions Principles of.
ZHRC/HTI Financial Management Training
Tender Adjudication and Contract Monitoring. Introduction IMPORTANT Each tender is unique. Please ensure to read the tender document carefully.
Tendering Procedures in Lagos State under the Public Procurement Law 2011 Presented By Engr. Akin Onimole | February 13, 2013 GM/CEO, Public Procurement.
Gene Shawcroft, P.E. Central Utah Water Conservancy District April 29-30, 2013.
Multi-Stage Bidding.
Inter-American Development Bank Procurement of Goods, Works and Consulting Services in projects financed by IDB Washington, DC – July 2004.
Lunchtime Topics Craig Weise Construction Reform Program Director Lisa Conomy Construction Counsel OSU Office of Legal Affairs.
1 Use and content of the RFP  Request for Proposals (RFP) is similar to bidding documents and include all information of the assignment, selection of.
Selection of Consultancy Services
Procurement of Consultancy Services. 2 Differences between.
Marcy Mealy Procurement Specialist CDBG Program
Sustainable Energy Systems Overview of contractual obligations, procedures and practical matters KICK-OFF MEETING.
PROCEDURES FOR SELECTING THE CONTRACTOR
1 Purchasing and Procurement Processes Module Four Revision Date: 2/06/2015.
Selection of Consultant Nazaneen I. Ali Sr. Procurement Specialist 1.
ZHRC/HTI Financial Management Training
INTRODUCTION TO PUBLIC PROCUREMENT
EuropeAid How can a private entity benefit from EC Service Contracts ? Jean-Louis VILLE Head of Unit « Finances, Contracts and Audit » Neighbourhood.
ZHRC/HTI Financial Management Training Session 8: Annual Procurement Plans, Procurement Contracts, and Contract Management.
A SOUND INVESTMENT IN SUCCESSFUL VR OUTCOMES FINANCIAL MANAGEMENT FINANCIAL MANAGEMENT.
1 1 Module II. Bidding and Evaluation Process I.Bidding documents (Stages of bidding & preparation of bidding document) II.Bid evaluation methods (principles.
Conditions and Peculiarities of Submission of Complaints in Ukraine. Typical Errors/Infringements Relating to Submission of Complaints Kyiv, April.
PROCUREMENT POST REVIEW OF WORLD BANK FINANCED PROJECTS IN INDIA October 11, 2007.
Contractors & contracts
1 PRESENTATION ON TENDERING REQUIREMENTS Presented by Kenya National Highways Authority (KeNHA) Team.
ADMINISTRATIVE REVIEW. PPDA Act and Administrative review  The Public Procurement and Disposal of Public Assets Act, 2003, sections 89 and 90, provide.
October 25, 2005 Pathways To Successful EU-Research Projects Financial management in FP 6 projects Praha, October 25, 2005 Claudia Labisch KoWi Office.
United Nations Procurement Division
EU-TURKEY CHAMBER FORUM PROJECT (ETCF) ETCF is funded by the European Union. 1 EU-TURKEY CHAMBER FORUM EU TURKEY CHAMBERS PARTNERSHİP GRANT SCHEME PROCUREMENT.
1 Bölgesel Rekabet Edebilirlik Operasyonel Programı’nın Uygulanması için Kurumsal Kapasitenin Oluşturulmasına Yönelik Teknik Yardım Technical Assistance.
WELCOME TO UNB. MARK McGEEHAN Assistant Manager, Procurement Services 3 plus years with UNB 28 years in Healthcare Procurement Current member of APPA.
UNDP Bangladesh Procurement Fair Objectives of the Fair; - UNDP Procurement principles; - Procurement plan ; - UNDP Procurement Roadmap;
Cooperationand consortium building Luis Araque de Juan European Commission International Cooperation and Development DEVCO/EuropeAid Unit R.3 Legal Affairs.
11 /Module I.3/ Management of public procurement /Module I.3/ а. Procuring entity b. Evaluation committee & Rights and Duties c. Procurement Planning.
1 CONTRACTING. 2 WHAT IS CONTRACTING ? CONTRACTING IS BASICALLY AN AGREEMENT BETWEEN TWO PARTIES, ONE CALLED THE CONTRACTING PARTY AND THE OTHER THE CONTRACTED.
You Be the Judge - Case Studies Office of the State Comptroller Office of Operations Bureau of Contracts Priscilla Cassidy Kathy Heffernan.
Procurement in Projects Financed by Islamic Development Bank Presented during Project Start-up Workshop September 2015, Jakarta, Republic of Indonesia.
INVITATION TO TENDER PROCEDURE INVITATION TO TENDER PROCEDURE IT–4144/SMB/HL-LHC (Point 1) IT-4155/SMB/HL-LHC (Point 5)
Introduction to Procurement for Public Housing Authorities Sealed Bids Unit 5.
GROUP TECHNOLOGY & COMMERCIAL TACTICAL PROCUREMENT PROCUREMENT PROCESS PRESENTED BY MARTHA DE BRUYN 24 NOVEMBER
CONDUCTING BUSINESS WITH THE TOWN OF MIAMI LAKES Construction Services October 28, 2013.
BOS 1 Procurement of Goods and Works Asian Development Bank Business Opportunities.
ENQUIRY NO: MPPPSC The drilling of boreholes, supply and installation of windmills. Prepared by: Hector Mabaso Date: 05 May 2016.
Evaluation. What is important??? Cost Quality Delivery Supplier Expertise Financial Stability Coverage Product Offerings Do you intend to negotiate?
Building Capacity of SMEs for Participation in Public Procurement Draft Presentation for Training of Trainers June 2014.
Assessment of the Bidding Process in Construction Project ABDULLAH H. ABU ZANT. AYMAN K. ILAIWI. MOHAMMED FADEL. SODQI M. ALHNAINI. AN-NAJAH NATIONAL UNIVERSITY.
Construction Tender Process Tender steps between Client, Contractor and Subcontractor Dr A Kimmance.
Evaluation of Expression of Interest and Proposals
Tender Evaluation and Award Process
Preparation of a tender and tender documents
Content of Tender Dossier Instructions to Tenderers
Award Management Services
Evaluation Grids Evaluation Grids.
Rebecca Rhodes, Senior Associate, UVAC
Sample Bid Evals and Best Practices
Request for Proposal - Best Value
BIDDING AND STANDARD BIDDING DOCUMENTS (SBDs)
Request for Proposal & Proposal
Request for Proposal - Best Value
Fasset Briefing Session
United Nations Procurement Division
Pre-bid Clarification Meeting
Procurement of Works -1 Ghana Shyam Gautam.
Presentation transcript:

Evaluation of Bids and Contract Award Module 6: Session 7

1)Appreciate the significance of bid evaluation process in the procurement of road works and services 2)Discuss with the trainees the approach to bid evaluation and explain the process of selecting a best evaluated bidder 3)Appreciate the importance of understanding the evaluation criteria and taking advantage of it 4)Outline contract award process and the remedies of an aggrieved bidder Learning Objectives 2

 A Bid is an offer made by a potential supplier to provide works, services or supplies or a combination thereof in response to an invitation.  It may be accepted by the Employer or not  Bid evaluation is the successive activities a PE goes through in selecting the most responsive and best evaluated bid to accept.  It involves examination, evaluation, comparison and post–qualification of bids. Bid Evaluation 3

1)Evaluate the bids using the criteria stated in the solicitation documents. 2)Composed of 3-5 persons and each member independently evaluates and scores the bids. 3)Conduct evaluation meetings jointly and minutes are signed by all members present. 4)Make a report signed by all members to PDU of the process and award recommendation. The Evaluation Committees 4

 Should possess skills in procurement and contracting, financial management as well as experience and technical skills in the subject matter of procurement.  Have knowledge of the work of the user department.  Be independent, able to make sound judgment and be of integrity.  Sign a Code of Ethical Conduct in Business and declare that they have no conflict of interest  Reach a consensus on the committee recommendations Members of the Evaluation Committee 5

 Evaluation criteria to be made known to all bidders in the solicitation documents.  All bidders be assessed against the same criteria.  Equitable and fair assessment be applied to all.  Members of the EC to have no conflict of interest.  Confidentiality be maintained throughout until best evaluated bidder is communicated to all. Guiding Principles for Bid Evaluation 6

 Employer assesses the content of the bid to answer questions as to whether:  The bid conforms to all the terms, conditions and specification.  The bid is free from any material deviations, reservations or omissions. Does the bid for example:  Substantially affect the scope, quality or performance of works specified?  Substantially limit the right of the Employer or obligations of the Bidder?  Would rectification unfairly affect competitiveness of other Bidders? 7 Testing compliance and responsiveness

 The Employer may for a substantially compliant bid waive non conformity, omissions or error that are not material  Employer may request the Bidder to submit within a reasonable time information or documents to rectify non material anomaly not relating to price.  Employer may correct arithmetic error  The best evaluated bidder should accept the correction of errors 8 Waiver of non-conformity

 Examination of the legal documentation and other information submitted by the bidders to confirm eligibility of the Bidder or materials, equipment and services to be used on the contract.  Checking for capacity to contract, insolvency, bankruptcy and receivership  Business activities not suspended  Compliance to statutory obligations  Not having a conflict of interest with Employer and other bidders  The Bidder and subcontractors being eligible citizens and not disqualified by PPDA. 9 Preliminary Evaluation: Eligibility and Administrative Compliance

 Certificate of incorporation.  Valid trading license.  VAT registration certificate, if applicable  Income tax clearance certificate  Powers of attorney  Bid bond/security  Bond Validity Period  Audited financial statements  Certain declarations 10 Common Preliminary Evaluation Requirements

1)Submission of the bid in a required format 2)Delivery within required time 3)Correct bid Validity 4)Signature and authorisation of bids 5)Any additional documents included 6)Correct number of copies and envelopes (say 2 in 1) 7)Signature of documents Other Administrative Compliance checks 11

 Quality and cost based evaluation  Quality based selection  Fixed budget selection  Least cost selection  Technical compliance least cost selection 12 Common evaluation methods

 Considers first, the technical quality and second, cost of each bid.  There is a minimum technical qualifying mark, below which a bid is rejected.  The relative weighing of technical and cost element are decided in advance and overall outcome used for selection. Quality and Cost Based Selection 13

 Stage 1 1)Points are awarded to the technical quality of each bid using predetermined criteria 2)Bids which do not reach a predetermined minimum scores are rejected  Stage 2 1)Financial bids of technically accepted bids are opened and awarded a financial score based on the lowest bid. 2)The best evaluated bid is the one with the highest combined technical and financial score. Stages in a quality and cost based selection 14

Criteria Maximum Score (%) Actual Score (%) Specific experience of the firm10 Tools and equipment30 Qualifications and competence of key personnel 40 Transfer of knowledge10 Local participation10 Total Score100 % Example of a typical technical criteria rating system for works 15

Examples of a Quality and Cost best evaluated bidder Scoring technical and financial evaluation (Minimum Technical score 75%) BidderTech score Financial Bid (shs) Financial score A86%110m91% B90%135m74% C78%100m100% D72%120mNot opened Best weighted evaluated bidder (Technical 70%, financial 30%) BidderTech score Fin. score Weighted A86x0.7091x B90x0.7074x C78x x DDropped 16

 Sometimes the weighted average of technical and financial bids approach is used to select the BEB  Sometimes every compliant and responsive bid is assessed as a pass and the lowest bidder selected as the BEB  Simply the BEB is selected by comparing all compliant bids using the methodology and criteria stated in the bid documents 17 Best Evaluated Bidder

 This is the process where the Employer verifies whether the BEB is qualified to perform the contract  Post-qualification is done only where no prequalification was conducted  Such verification may involve a request for clarification of information included in the bid document  It will also include due diligence of documents and other information provided by the bidder  Where the BEB is found wanting, then the Employer will proceed to the next best evaluated bidder. 18 Post-qualification

 Notice of the Best Evaluated Bidder must be publicly displayed stating the following:  Procurement Reference  Subject of procurement  Name of Best Evaluated Bidder  Total contract price  Date of display  It is copied to all the bidders who participated  Display is for a specified period as per PPDA  Dissatisfied bidders may lodge complaints for administrative review within that period. Publication of BEB 19

 A contract is awarded by the Contracts Committee to the bidder whose tender has been determined to:  be substantially responsive to the bid documents  offers the best evaluated bid and has been post-qualified and recommended by the EC  Options for the Contracts Committee:  Accept recommendation to award  Reject recommendation with reasons  Accept recommendation subject to some adjustments Award of Contract 20

 The employer (the Contracts Committee) has the right to accept any bid or to reject any bid or even to reject all bids!  A Letter of Bid Acceptance (LBA) by the employer notifies the successful bidder that their bid is accepted  The LBA states the consideration the Employer will pay to the Contractor on execution of works  Prior to the signing of a formal contract the LBA constitutes a binding contract.  A contractor must sign and return a contract agreement within 21 days of receipt. 21 Bid Acceptance

 A dissatisfied bidder may, by payment of a fee, lodge a complaint for any omission or breach.  A request for an administrative review must be in writing to the accounting officer within 15 days when the bidder became aware of the incident  A copy must be provided to the PPDA  If no decision is made within 15 days from submission or if the bidder is dissatisfied with decision of the AO, the bidder may apply to PPDA for an administrative review.  Application must be within 10 days. Rights of a dissatisfied bidder 22

 The details of the procurement  Details of the act, regulation or guideline  Explanation of how the rule is breached  Dates of the breach and names of the public officers responsible  Documentary support  Any other relevant information 23 Information to be submitted by the aggrieved applicant

 Suspends the procurement process and informs the Contracts Committee  Institutes an investigation and reviews information  Submitted by applicant, from staff of the PDE and from other bidders  Issues a decision within 15 days of receipt of the complaint stating:  Whether to uphold or reject the complaint  Reasons for the decision  Any corrective measures taken 24 Response by the AO

 If escalated to PPDA, it will review information provided by the bidder and from the PDE.  The tender council carries out an administrative review and reports to PPDA and Solicitor General for final decision.  Decision must be delivered by PPDA within 21 days stating:  Whether application is upheld or rejected  Reasons for the decision  Any corrective measures taken. 25 Response of PPDA

 Outline the major areas to consider in evaluating a road works bid. For each suggest what you would do to maximize your scores using the Quality and Cost- Based Selection (QCBS) Method 26 Discussion Session

27

Criteria Maximum Score (%) Actual Score (%) Specific experience of the firm10 Tools and equipment30 Qualifications and competence of key personnel 40 Transfer of knowledge10 Local participation10 Total Score100 % Example of a typical technical criteria rating system for works 28