PPP Center of the Philippines

Slides:



Advertisements
Similar presentations
The Philippine Public-Private-Partnership (PPP) Program
Advertisements

Enable Procurement Agencies to Fulfill their Roles Push Smooth Implementation of Project Procurement Foreign Debts Management Center, Hebei Provincial.
Mobilizing Institutional Investment in Africa Stockholm, 22 th October 2014 Changing the Game for Africa.
Public Private Partnerships MUNICIPAL PPP CONFERENCE Date: 18 February 2010.
Public Procurement in Albania in the framework of recent reforms PUBLIC PROCUREMENT AGENCY 1.
Facilitating PPPs in Asia
© OECD A joint initiative of the OECD and the European Union, principally financed by the EU The Private Sector Perspective on PPP Projects/Concessions.
The Enabling Environment: How can governments encourage PPPs? Recent Australian Initiatives Michael Schur, November 2014 Disclaimer: The views expressed.
Brief Overview of the Passenger Transport Sector in the Philippines Gilberto M. Llanto C.P. ROMULO HALL, NEDA SA MAKATI BUILDING May 7, 2013.
Phases of A BOT Project Prepared By :Afaf Bu-khawa Course title: Technology Implementation,MGT 620.
1 Business Opportunities Istanbul, Turkey 30 April 2010 Asian Development Bank.
Jeff Delmon FEU Financial Solutions World Bank. Why PPP? Procurement efficiency Lifecycle management Design/construction/operation management Monetizing.
Public Private Partnership- Identification, Viability and Implementation Prof. Yashvir Tyagi Prof. Yashvir Tyagi Department of Economics Department of.
Capacity Building Program for EAs/IAs on Successful Project Design and Implementation November 2013  ADB Headquarters, Manila, Philippines Improving.
WELCOME TO THE PROCUREMENT SEMINAR Procurement and Contracts An Overview of Contract Administration.
AfDB - EBRD Joint conference in procurement reform in North Africa and SEMED Countries Marrakech 22 and 23 April 2013 Jordan Delegation 22-23/4/2013.
Financing Urban Public Infrastructure
© OECD A joint initiative of the OECD and the European Union, principally financed by the EU Martin Oder, LL.M. The Emerging Role of the Competitive Dialogue.
Background of PPP Negotiation
P UBLIC -P RIVATE P ARTNERSHIPS IN M ONGOLIA Now and Futures Prospects E.Enerelt, ADB June 6, 2014.
James Aiello PricewaterhouseCoopers Africa Utility Week 06 International Good Practice in Procurement.
Local Governmental Debt, Fiscal Risks and Their Management Framework Liu Shangxi Research Institute for Fiscal Science, Ministry of Finance, PRC Disclaimer:
ADB Support for PPPs Qian Ying, Director and Craig Sugden, Principal PPP Specialist East Asia Regional Department Disclaimer: The views expressed in this.
1 COUNTRY REPORT KEC TECHNICAL TRAINING PROGRAMME, 2011.
Building Blocks for a Successful Public- Private Partnerships Presented by Igor Abramov Counsel & Co-chair, Eurasia and Russia Practice Group, Heenan Blaikie.
Public Procurement Reforms
Disclaimer: The views expressed in this document are those of the author, and do not necessarily reflect the views and policies of the Asian Development.
Strategic Opportunities for TVET: Experience and Directions of ADB Support Sofia Shakil Senior Education Specialist East Asia Department, Asian Development.
Legal Aspects Related to Brownfield Regenerations Prof. Maros Finka, M.arch., Ph.D. „This project has been funded with support from the European Commission.
PUBLIC-PRIVATE PARTNERSHIP FOR CLEAN AIR CHINA GAS HOLDINGS LIMITED August 2013 Eric Leung Wing Cheong Deputy Managing Director Chief Financial Officer.
AMC Governance and Institutional Support. Objectives Build on existing capacity Ensure appropriate independence and credibility through transparency,
PUBLIC PROCUREMENT SYSTEM IN TAJIKISTAN RAVSHAN KARIMOV AGENCY FOR PUBLIC PROCUREMENT UNDER THE GOVERNMENT OF THE REPUBLIC OF TAJIKISTAN.
Seethapathy Chander Asian Development Bank Beijing, 25 November 2014 Disclaimer: The views expressed in this document are those of the author, and do not.
PUBLIC PROCUREMENT INFORMATION TECHNOLOGIES IN THE REPUBLIC OF TAJIKISTAN PUBLIC PROCUREMENT AGENCY UNDER THE GOVERNMENT OF THE REPUBLIC OF TAJIKISTAN.
National Planning Department. Mobilizing private investment for low carbon development October 14 th, 2015.
Environmental Assessment in British Columbia Forum of Federations Conference September 14, 2009.
Public-Private Partnership Development Platform in Ukraine Non-governmental organization “Public-Private Partnership Development Platform” Київ
WHO EURO In Country Coordination and Strengthening National Interagency Coordinating Committees.
PUBLIC–PRIVATE PARTNERSHIP (PPP) FRAMEWORK AND GUIDELINES Syed M. Ali Zaidi, P.Eng. PM(Stanford), Ph.D. Director, Strategic Partnerships Alberta Infrastructure.
PPP Legal & Regulatory Framework. PPP Policy In July 2008 GOK approved the PPP policy directive through which: PPPs are identified as a method for investing.
ESTABLISHMENT OF THE CLEAN DEVELOPMENT MECHANISM (CDM) NATIONAL AUTHORITY, OPERATIONAL FRAMEWORK AND SUPPORT SYSTEMS FOR THE PHILIPPINES Establishment.
GOOD GOVERNANCE Internal Management Support Dr. David J. Lozada Jr. Assistant Secretary of Health Internal Management Support Team 1 st National Staff.
 Contract by Public Authority for provision of asset and/or services  With private entity  Private finance used to fund asset/service  Long-term in.
TEN-T Executive Agency and Project Management Anna LIVIERATOU-TOLL TEN-T Executive Agency Senior Programme and Policy Coordinator European Economic and.
Jela Tvrdonova, The EU priorities:  Use the Leader approach for introducing innovation in the thematic axis  better governance at the local level.
Virginia Office of Public-Private Partnerships (VAP3) Adopted Public-Private Transportation Act (PPTA) enabling legislation in 1995 Public-Private Education.
Disclaimer: The views expressed in this document are those of the author, and do not necessarily reflect the views and policies of the Asian Development.
Seminar on Public Private Partnerships February PPP Experiences – Challenges and Way Forward Administrative Staff College of India.
Infrastructure Development Corporation Limited Risk Mitigation through Project Development Focus on Safer Airplanes in addition to better Parachutes Pradeep.
Consulting Opportunities in IDB Private Sector Operations.
Office of Major Project Development (OMPD) Overview November 2015.
BIDDER’S CONFERENCE: Eskom Grid Connection Process and related matters Date: 16 August 2012.
REPUBLIC OF ALBANIA PUBLIC PROCUREMENT AGENCY Eighth Regional Public Procurement Forum May, 22-25, 2012 Tirana
Reforms in the Albanian Public Procurement System 7 th Regional Public Procurement Forum Tbilisi, Georgia May 16-19, 2011 PUBLIC PROCUREMENT AGENCY 1.
André Hoddevik, Project Director Enlargement of the PEPPOL-consortium 2009.
Public – Private Partnership in Vietnam: A new approach Ho Chi Minh City – June 2010.
Philippine PPP Program
BOT LAW (R.A. No. 6957, as amended by R.A. No. 7718)
Presentation to the Public-Private Partnerships in Highways Workshop
Legal Aspects Related to Brownfield Regeneration
2016 Procurement Framework Contract Management
ADB’s CORPORATE STRATEGY
ESCL – ANNUAL CONFERENCE 25 OCTOBER 2018 EDWINA UDRESCU, FCIArb Lawyer
The Government Role in BOT
Public-Private Partnership for Clean Air Municipal Natural Gas Distribution Infrastructure Development Projects Hisaka Kimura Principal Investment Specialist.
a. Financing b. Designing c. Construction d. Operating
Cofindustria OVERVIEW OF THE WORLD BANK PROGRAM IN SERBIA
Developing the power sector in Federal Nepal Main lessons from international experience Kathmandu, November 06, 2018.
Financing PPP Projects
The Role of Private Sector in Capital Budgeting
Presentation transcript:

PPP Center of the Philippines The Experience of the PPP Center of the Philippines Disclaimer: The views expressed in this document are those of the author, and do not necessarily reflect the views and policies of the Asian Development Bank (ADB), its Board of Directors, or the governments they represent. ADB does not guarantee the accuracy of the data included in this document, and accept no responsibility for any consequence of their use. By making any designation or reference to a particular territory or geographical area, or by using the term “country” in this document, ADB does not intend to make any judgments as to the legal or other status of any territory or area.

The Philippine PPP Agenda PPP as one of the strategies to accelerate INFRASTRUCTURE DEVELOPMENT PPP Program is geared towards INCLUSIVE GROWTH Private sector as PARTNER IN DEVELOPMENT PPP Center as the CHAMPION FOR PUBLIC-PRIVATE PARTNERSHIPS

The PPP Center jjjjj Per Executive Order No. 8, s. 2010, as amended by Executive Order No. 136 signed last 28 May 2013: BOT Center renamed as PPP Center PPP Center Services: Provide advisory services Facilitate development of PPP projects Manage the Project Development and Monitoring Facility Capacitate national implementing agencies and LGUs Advocate policy reforms Monitor implementation of PPP projects Expanded mandate: BOT Law Joint Venture arrangements Other PPP arrangements PPP Center to directly report to the PPP Governing Board

Institutional Evolution of the PPP Center Aquino Administration 1986-1992 BOT Law (RA 6957) Ramos Administration 1992-1998 Amended BOT Law (RA 7718) BOT Center under Office of the President -CCCPAP Aquino Administration 2010-Present Renamed PPP Center and attached to NEDA Estrada Administration 1998-2001 Renamed BOT program to PSP program CCPSP under the Office of the President Evolving Institutional Role in Critical Phases of Private Sector Engagement Arroyo Administration 2001-2010 Revert to BOT Program BOT Center under DTI

Institutional Arrangement Contracting Parties/ Implementing Agencies National Line Agencies Government Corporations Local Government Units Review and Approving Bodies Inter-Agency Investment Coordination Committee (ICC) NEDA Board Coordinating and Monitoring Agency The Public-Private Partnership Center Other Government Bodies Concerned Policy-making Bodies (PPP Governing Board) National and Sectoral Regulatory Bodies PREQUALIFICATION, BIDS AND AWARDS COMMITTEE (PBAC) Responsible for all aspects of the pre-bidding and bidding process, including the preparation of tender documents, conduct and evaluation of bids, and interpretation of the rules regarding the bidding, among others

The Project Development & Monitoring Facility (PDMF)

The PDMF Revolving fund that supports pre-investment activities to ensure project viability/bankability through engagement of high-caliber consulting firms PDMF Panel of Consulting Firms: 22 internationally-renowned consortia of consulting firms under Indefinite Delivery Contracts (IDCs) Scope of services Feasibility studies Project structuring Bidding documents, including PPP contract Support during the bidding process until financial close

PDMF Fund USD 18 million from AusAID through ADB USD 51 million from GOP Revolving Feature: Project development cost + 10% cost recovery fee to be reimbursed by the successful bidder

Consultant Selection Stage 1: Pre-qualification of Consulting Firms Quality-based selection Firms (consortia) are retained for 3 years on indefinite delivery contracts (IDC) without commitment IDCs are used when consultants are required to provide “on call” specialized services/advice on a particular activity, the extent and timing of which cannot be defined in advance Stage 2: Call-Down Assignment Fixed-budget selection Electronic submission of technical and financial proposals Lump-sum contract

Advantages of Tapping the PDMF Shorter timeline for procuring consultants Access to associations of international and national consulting firms pre-qualified to provide project preparation and transaction support services Access to full range of services (i.e., from preparation of FS and tender documents, bid process management until financial close)

Robust PPP Pipeline of Projects

(By Project Status as of November 2014) PPP PROJECTS (By Project Status as of November 2014) Status No. of Projects Estimated Cost (in million USD) Projects under Implementation Awarded 8 2,833.33 Other projects for implementation 3 2,132.44 Sub-total 11 4,965.77 PPP PIPELINE Projects for awarding 1 786.67 Projects under procurement 6 3,831.56 Projects approved for roll-out 4,070.49 For approval of relevant government bodies 428.89 Projects with ongoing studies 9 6,882.89 For procurement of consultants 10 TBD Under conceptualization or development 46 16,000.49* TOTAL 57 20,966.26* *This does not include 28 projects with no estimated costs yet.

(By Implementing Agency) PPP Projects (By Implementing Agency)

PPP Projects (By Sector)

AWARDED PROJECTS (1/2) PROJECT BRIEF DESCRIPTION ESTIMATED COST STATUS (USD) 1 Daang Hari-SLEX Link Road Project Construction of a 4-km toll road connecting the cities of Las Piñas and Bacoor to the South Luzon Expressway 44.67 M Construction on-going; 55% completed (as of 25 October 2014) 2 PPP for School Infrastructure Project (Phase I) Construction of 9,300 classrooms in various sites in Regions I, III and IV-A 361.78 M 2,078 sub-projects (7,288 classrooms) completed; 364 sub-projects (1,683 classrooms) under construction; and 75 sub-projects (333 classrooms) under pre-construction (as of 31 Oct. 2014) 3 NAIA Expressway Phase II Construction of an expressway & a feeder road that will connect NAIA Terminals, Skyway, and Manila-Cavite Toll Expressway 344.89 M Construction on-going; 12.52% complete (as of 20 October 2014) 4 (Phase 2) Construction of 4,370 classrooms in various sites in Regions, I, II, III, X, CAR, and CARAGA 85.78 M 64 sub-projects (111 classrooms) completed; 305 sub-projects (803 classrooms) under construction; and 1,559 sub-projects (3,456 classrooms) under pre-construction stages (as of 31 October 2014)

AWARDED PROJECTS (2/2) 7 8 PROJECT BRIEF DESCRIPTION ESTIMATED COST STATUS (USD) 5 Modernization of the Philippine Orthopedic Center Construction of a 700-bed capacity super-specialty tertiary orthopedic hospital 126.44 M On-going pre-construction activities; On-going procurement of Independent Consultant (IC) 6 Automatic Fare Collection System Replacement of the old magnetic-based ticketing system with contactless-based smart card technology for LRT Lines 1 & 2 and MRT Line 3 38.22 M On-going pre-operation activities 7 Mactan-Cebu International Airport (MCIA) New Passenger Terminal Building Construction of a new passenger terminal building with a capacity of 8 million passengers per year; and O&M of old and new facilities 389.33 M O&M Start Date (start of 25 year concession period) on 1 November 2014; On-going pre-construction activities; On-going procurement of Independent Consultant (IC) 8 LRT Line 1 Cavite Extension and Operation & Maintenance Extension of the current 11.7-km LRT Line 1 to Bacoor, Cavite; and O&M of the 32.4-km integrated LRT Line 1 system 1.44 B Ongoing preparation for procurement of Independent Consultant (IC) TOTAL COST OF AWARDED Projects : 2.83 B

What we want to achieve by 2016 Robust pipeline of PPP projects at least 50 projects in the pipeline in various stages of the project cycle at least 15 PPP contracts signed at least 5 projects completed at least 10 infrastructure projects handed over to the private sector for Operation & Maintenance (O&M) Solid PPP legal and policy framework Transparent, predictable and tested procedures Standard contract agreements that uphold reasonable returns and fair risk allocation to the private sector while safeguarding public interest

THANK YOU PUBLIC-PRIVATE PARTNERSHIP CENTER OF THE PHILIPPINES NEDA COMPLEX, EDSA, DILIMAN, QUEZON CITY Contact Details: (632) 990-0721 | www.ppp.gov.ph