City of Palm Beach Gardens Tennis Center Expansion Project ITB2014-037PF.

Slides:



Advertisements
Similar presentations
Presented by: Mike Sisson February 23, It is the Law The Americans with Disabilities Act of It is the Right Thing to do Provide Equal Access.
Advertisements

JUNO BEACH PEACE GARDEN PROPOSAL April 15, 2011 Presented by Terron & Megan.
FIRE STATION NUMBER 2 Pre-Proposal Conference & Site Visit RFP FR August 27, 2013.
FIRE STATION NUMBER 2 Pre-Proposal Conference & Site Visit RFP FR April 25, 2014.
Procurement: What Everyone Needs to Know. What is Procurement? “The act of obtaining something”
Oklahoma Department of Transportation Susan McClune Regulatory Services.
ASPHALT & CONCRETE FOR INDOOR FACILITIES Presented by Tom DeRosa.
Lander Streets and Utilities 2015 Public Meeting No. 2 McDougall & Cliff Project Area.
Dillon and Christina Project Area Lander Streets and Utilities 2015 Public Meeting No. 2.
TAKING THE CTCB EXAM BY: TOM DEROSA, CTCB & MATT STROM, CTCB.
City of Bloomfield Hills 2015 Road Improvement Program.
City of Palm Beach Gardens SUBSURFACE TURF DRAINAGE SYSTEM FOR NATURAL ATHLETIC FIELDS SUBSURFACE TURF DRAINAGE SYSTEM FOR NATURAL ATHLETIC FIELDS ITB PF.
Public Information Meeting #6 City of Fargo Flood Risk Reduction Projects Rose Creek Coulee October 9, 2012.
City of Palm Beach Gardens ARTISTIC BUS SHELTERS ARTISTIC BUS SHELTERS ITB PW ITB PW.
Marcy Mealy Procurement Specialist CDBG Program
US Highway 17 (Center Street) Sidewalk Feasibility Study Town of Pierson, Florida.
& Community Design LSU Green Laws Research Project Green Laws Louisiana Department of Agriculture & Forestry EBR Parish Tree And Landscape Commission Louisiana.
Award of Bid #Y7-100-HF Convention Center Janitorial Services County Administration.
& Community Design LSU Green Laws Research Project Green Laws Louisiana Department of Agriculture & Forestry EBR Parish Tree And Landscape Commission Louisiana.
Mission Statement To develop a vision of how we, the citizens of Folly, want Center Street to be transformed into the “Gateway to our city.” Then deliver.
Gwinnett County’s Post Development Stormwater Management Program
1 CDBG Procurement Requirements For Local Officials.
PIONEER HIGH SCHOOL WEST STADIUM PHASE 1. EXECUTIVE SUMMARY Erickson Hall (EHCC) was the awarded the Pioneer High School Phase 1 Construction Contract.
Chapter 11 Pricing Concrete Work. Objectives Upon completion of this chapter, you will be able to: –Describe the job factors and the labor and management.
PC Meeting July 1, 2015 CUP 15-02/DR 15-06/DR
Author name here for Edited books chapter 6 Facility Construction 6 chapter.
Why is the formula for triangle a half?. If the radius is 5cm, find the area of the shaded region.
NBOZ Northlake Boulevard Overlay Zoning District Village of North Palm Beach Landscape Element Requirements.
Architect Drawing of New Entrance. Location Location of Phase II Construction Project – Old tennis courts west of the existing building.
MASTER PLAN FEBRUARY 15,2012.
Capital Improvement Program. During the Annual Strategic Action Plan (SAP) evaluation, long-term needs and priorities are identified by City Council Capital.
STATE WIDE SIGN GUIDE This guide will demonstrate various sign mounting products and procedures for construction and maintenance.
Hospital Facility Managers Association of Delaware Valley.
BPRD DISTRICT OFFICE AND RIVERBEND PARK Robin Laughlin, ALSA, RLA.
Tom Cloud Park Splash Pad. Splashpad Rendering Tom Cloud Park.
Project Update Colorado Esplanade Project.
Chapter 15 Site Plan Layout. Driveway style and Slope Design Considerations  Minimum lawn slope of 5% for first 10’ (5/8” per foot)  Minimum concrete.
City of Palm Coast, Florida City Council Meeting October 2, 2012.
1 Award of Bid #Y9-732-SB Barnett Park Gymnasium County Administration June 9, 2009.
Now that I built it, How much did it Cost?
Bond Construction Update Facilities Advisory Committee Long Beach Community College District April 6, 2011 EDUCATE  ENGAGE  EMPOWER 1.
PBL: OUTDOOR LEARNING SPACE Level 3.  What features are necessary for an outdoor learning space?  How does weathering impact design choices?  What.
Redevelopment in the Resort Housing District To the Sanibel- Captiva Chamber of Commerce Nov. 29, 2011 Prepared by: Planning Department.
Community Development Department Variance to 20 ft. Street Side Setback 1 Windsor Place APP. NO Variance to 20 ft. Street Side Setback 1 Windsor.
May 2010 Photo provided by the Trust for the National Mall U.S. Commission of Fine Arts Concept Review.
Guidelines for Land Clearing Presented By: SLC Environmental Resources Department.
Chapter 6 Designing Recreation Facilities and Reading Blueprints.
Community Development Department Ryan’s Landing Planned Unit Development Application No
Downtown Marina Authorization for 30% Design Contract for Downtown Marina and Adjacent Areas & Functions Stockton City Council December 6, 2005 Agenda.
Gloucester Parkway Entrance Enhancements IFB# RAR Pre-Bid Conference & Site Visit August 16, 2016.
PUD Mike Awe for Sanctuary Mission. SUBJECT PROPERTY S S S S S S S M M M M C C C C C C C.
Urban Runoff Pollution Ordinance 2017 Proposed Update
Project Status & Right-of-Way Acquisition
Santa Cruz avenue sidewalks Project
DISCOUNT TIRE SITE PLAN PLDRB Public Hearing on August 16, 2017
Estimating the Cost for the Concrete Pad
Estimating the Cost for the Concrete Pad
PRE-BID MEETING ITB UNDP Design and Construction of a new medical warehouse in Bissau, Guinea Bissau 15th August 2017 Presented by Antoine Fadoul UNDP-
Estimating the Cost for the Concrete Pad
Changes to Pace Master Campus Plan 1. Pod A Tear down Randall House, build new Lower School building in its place. Add new parking in front. 2.
Caltrans 2010 standard specifications
AX7665D82 Areawide Total Maximum Daily Load (TMDL) Design-Build
Estimating the Cost for the Concrete Pad
Presentation cover; need to take off boarder on PPLM photo
1200 West Widening and Reconstruction Project
ARIZONA WATER COMPANY East Sedona Water Storage Facility
House Construction Budget Plan
Estimating the Cost for the Concrete Pad
Lecture 10 PROCUREMENT Ferdinand FASSA.
Stream Crossing Replacement Policy
Presentation transcript:

City of Palm Beach Gardens Tennis Center Expansion Project ITB PF

I-95 PBG Tennis Center th Court North, PBG, Florida Site Map

Project Overview This project involves the a ddition of four hydrogrid clay courts and one hydrogrid center/stadium clay court along with related site work and amenities.

Basic Elements of Project Four new hydrogrid clay courts (match existing) Four new hydrogrid clay courts (match existing) One new Pro court hydrogrid clay court (match existing) One new Pro court hydrogrid clay court (match existing) Earthwork for expansion and relocation on the existing dry detention area Earthwork for expansion and relocation on the existing dry detention area Access walkways and amenities Access walkways and amenities

Four new hydrogrid clay courts

 Built exactly as existing courts  Base and surface materials  Hydration and drainage system  Fencing w/wind screens, pavers, striping, water fountain  Shade structure  Design and constructed to ensure consistent play, appearance and maintenance as existing courts

New New Pro court hydrogrid clay court  Court layout typical of Davis Cup World Group and Federation Cup main draw events shall be built to match existing pro court

Dry detention & berm expansion and relocation New courts will be located over existing detention areas and berm New courts will be located over existing detention areas and berm Additional detention area is to be constructed Additional detention area is to be constructed Minimum impact to site location Minimum impact to site location Save natives where possible Save natives where possible Maintain buffers Maintain buffers

MISCELLANEOUS AMENITIES Bleachers - 15 feet in length, 3 rows installed on concrete pad provide by contractor. Bleachers - 15 feet in length, 3 rows installed on concrete pad provide by contractor. Trashcans, benches, court scoreboards, shoe cleaners, windsocks, and court valets – The awarded Bidder shall be responsible for the assembly and installation prior to substantial completion unless the equipment is not made available by the City. Trashcans, benches, court scoreboards, shoe cleaners, windsocks, and court valets – The awarded Bidder shall be responsible for the assembly and installation prior to substantial completion unless the equipment is not made available by the City. The City will purchase the following items, and the awarded Bidder shall coordinate delivery, assembly, and installation (install price in base bid)

Site Amenities Alternate Bid Items Alternate Bid Items 50-Gallon Pressure Tank for Court Watering System (Supply and Install) 50-Gallon Pressure Tank for Court Watering System (Supply and Install) Approach Apron to courts for maintenance areas (Each) Approach Apron to courts for maintenance areas (Each) Additional Sidewalk (Per Square Foot) Additional Sidewalk (Per Square Foot) Additional Windscreens (Supply and Install Per Court) Additional Windscreens (Supply and Install Per Court) Concrete Slab for bleacher pad (Per Square Foot) Concrete Slab for bleacher pad (Per Square Foot) Shade Structure: Sunport or approved equal; Style I ( Supply and Install) Shade Structure: Sunport or approved equal; Style I ( Supply and Install) Shade Structure: Sunport or approved equal; Style II ( Supply and Install) Shade Structure: Sunport or approved equal; Style II ( Supply and Install) Bleachers, 15’ wide ( Supply and Install) Bleachers, 15’ wide ( Supply and Install) Water Fountain (Supply and Install) Water Fountain (Supply and Install) Synthetic Clay – to match existing (Per Pallet) Synthetic Clay – to match existing (Per Pallet) Laser Grading (old existing Court) Laser Grading (old existing Court)

HydroCourt Vs. Hydrogrid Bidders can provide a HydroCourt system bid provided the bidder provides a written guarantee and demonstrate that the HydroCourt system will seamlessly integrate and work with the existing HydroGrid irrigation system, and not create any operational problem. Bidders can provide a HydroCourt system bid provided the bidder provides a written guarantee and demonstrate that the HydroCourt system will seamlessly integrate and work with the existing HydroGrid irrigation system, and not create any operational problem.

Questions? Questions after this meeting must be submitted in writing to Km Ra!.   fax (561)