DE SREC Procurement Program Overview (877) 466-4606 x100 Call-in for this webinar is (917) 338-1451 PIN:

Slides:



Advertisements
Similar presentations
1. 2 Partners in Procurement Steve Hagar Deputy Director Central Purchasing Division Department of Central Services August 24th, 2009.
Advertisements

LOS ANGELES UNIFIED SCHOOL DISTRICT JOB ORDER CONTRACTING Copyright © 2004 The Gordian Group, Inc. all rights reserved.
TENDERING J. Marc MacEwing Shapiro Hankinson & Knutson Law Corporation.
THE CHILD AND ADULT CARE FOOD PROGRAM playing a vital and integral role in improving the overall quality of care and daily nutritional health of participants.
1 FALL 2010 ASBO CONFERENCE
Nabil dmaidi1 Miller Act H Enacted in 1935 H Federal Contracts over $25,000 H Contractor shall provide Bonds H Performance Bonds in the amount to protect.
Welcome to the Virtual Bidders’ Conference DigitalEdge ITB #ESD112-DE-14B ● June 5, 2014 ● GoToWebinar Debbie Tschirgi Program Director Bunny Stevens Procurement.
Procurement: What Everyone Needs to Know. What is Procurement? “The act of obtaining something”
Gene Shawcroft, P.E. Central Utah Water Conservancy District April 29-30, 2013.
Perkins Postsecondary Reserve Fund Grants WELDING PROGRAM OF STUDY.
Town of Davie Neighborhood Stabilization Program (NSP) Applicant Workshop January 30, 2010.
DOL AME Grant RFPs Manufacturing Lab Equipment Pre-Award Webinar July 25, 2013.
Marcy Mealy Procurement Specialist CDBG Program
IPERS Overview & Benefit Options
1 CDBG Procurement Requirements For Local Officials.
Treasury Tax & Loan Investment Program Term Investment Option (TIO) Program Overview Updated September 2009.
Procurement and Food Service Contracts Pages
Going Green: City of Phoenix Sustainability Update ACMA Winter Conference February 7, 2008 Carolyn F. Bristo Assistant Public Works Director City of Phoenix.
 Federal Financial Aid is financial assistance provided to students who fill out the FAFSA application and meet the requirements. Financial aid can include:
Structured Transaction Overview. FDIC serves as an equity partner in its Receivership capacity for a single or multiple institution transaction. Joint.
School District Purchasing. Purchasing Authority Arizona Statutes Arizona Statutes Arizona Administrative Code Arizona Administrative Code  Primary source.
COMPLIANCE WITH GRANT IMPLEMENTATION PROCEDURES TxDot Grant Fund Project.
Page CDBG/CHIP Recipients’ Workshop This package must be signed and returned to DCA within 30 days after receiving grant award – What am I?
The Tax Credit Process (Once credit has been awarded) Reservation and Carryover Gross Rent Floor Election Form Commitment 10% Certification Quarterly Progress.
Washington Metropolitan Area Transit Authority (WMATA) Invitation for Bid/ Contract Number – FQ12210 December 12, :00 AM JGB Board Room Rehabilitation.
Creating A Greener Energy Future For the Commonwealth Procurement of Renewable Energy on Landfills January 19, 2010 Courtney Feeley Karp, Esq.
Indiana Hoosier Lottery Lottery Draw Witness Pre-Proposal Conference September 14, 2012 Stan Judson IDOA Strategic Sourcing Analyst.
Review of EDC Solar Long- term Financing Program Analysis January 12, 2012 Center for Energy, Economic, and Environmental Policy DRAFT.
Outline o What they are o How they work o Who uses them o History ?
1 Procurement. 2 Overview Every municipality should keep procurement records that allow an auditor or other interested party to track the specific nature.
Dutch Auction
Talbot County Project Sunburst Talbot County Department of Parks & Recreation Private/Public Partnership July 12,
MARCH 9, 2006 Boating Safety and Enforcement Grant Program Regulations Stakeholder Workshop Proposed Conceptual Regulations Department of Boating and Waterways.
JOHN BURTON FOUNDATION THP-Plus Participant Tracking System Reporting Functions Online Webinar – April 8, 2009 Presented by Michele Byrnes and Reed Connell,
New Jersey’s Clean Energy Program: 2011 Renewable Energy Plan Overview of Final Compliance Filing REC Meeting 12/7/10 Charlie Garrison.
Putting the U in Community Solar Creating a Local, Meaningful University Offset Program Myron Willson, U of U Sustainability Resource Center Director Stephanie.
Washington Metropolitan Area Transit Authority (WMATA) FQ15237 SIX (6) TIE BREAKER STATIONS UPGRADE ORANGE AND BLUE LINES VA, DC AND MD Pre-Bid Conference.
Uniform Grant Guidance Roundtable Discussion: October 5, 2015 Procurement 1.
You Be the Judge - Case Studies Office of the State Comptroller Office of Operations Bureau of Contracts Priscilla Cassidy Kathy Heffernan.
G 200 L 200 ISO NEW ENGLAND T H E P E O P L E B E H I N D N E W E N G L A N D ’ S P O W E R. Southwest Connecticut RFP Markets Committee November 14, 2003.
INVITATION TO TENDER PROCEDURE INVITATION TO TENDER PROCEDURE IT–4082/EN Design, Supply, Installation and Commissioning of the ventilation of the BAF3.
Community Solar. Background Review of Electricity System mandated by Bill 1 – Nov “Our Electricity Future, Nova Scotia’s Electricity Plan” released.
JUNIOR PARKING LOTTERY LOTTERY REQUIREMENTS AND DEADLINES.
Federal Acquisition Service U.S. General Services Administration Area Facility Operation Specialist (aFOS) 88 th Regional Support Command Pre-Bid Meeting.
PROCUREMENT General Overview of Procurement Process on Dublin Waste to Energy Project.
Illinois Distributed generation Procurement program
Sunverge Energy – SGIP Overview
Massachusetts DOER Solar Credit Clearinghouse Auction 2017 Auction Bidder Webinar June 21, :00 – 3:00 PM ET.
Carbon Free Energy with Storage 2017 JOINT REQUEST FOR OFFERS
Universal Prekindergarten (UPK) Program New York State UPK GRANT FUNDS
Massachusetts RPS Solar Credit Clearinghouse Auction 2017 Auction Bidder Webinar July 12, :00 – 3:00 PM ET.
Illinois Distributed generation Procurement program
Buttsbury Junior School Friends Association present our
Existing Programs Stakeholder Group
2017 Spring Utility DG Procurement
Dale Davis – President, CMI Solar & Electric, Inc.
Junior parking lottery
© 2017 Universal Service Administrative Co.
The LREC/ZREC PROGRAM and RFP Results
Junior parking lottery
Bids for Phase 2 Option A We do little more than already approved. This would add up to $690,000 to the original $3,000,000 mortgage. This includes.
EDGAR RULES AND PROCEDURES TRAINING
Procurement.
TERM JUNIOR PROGRAM MONDAY 29th JANUARY – SUNDAY 15th APRIL
Auction Purchase Cover – Option – 01.
Auction Purchase Cover – Option – 01.
How Small Developers and EPC Contractors Can Add PPA Financing to their Arsenals John Langhus, VP Business Development Midwest Solar Expo 2019 New Energy.
Procurement & Strategic Sourcing
TOP 100 Winback Program – IBM Power, Storage, and System Z
Procurement & Strategic Sourcing FPM ART GALLERY DESIGN SERVICES
Presentation transcript:

DE SREC Procurement Program Overview (877) x100 Call-in for this webinar is (917) PIN: # Audio also available on your computer

Webinar Program Basic Program Overview Sample Facility Application Questions and Answers – All questions will be asked through the chat feature – Questions may be asked at any time, answers will be provided at the end of the presentation

Basic Requirements Existing projects – Must have an “Accepted Completed Solar System Interconnection Application” dated Dec 1, 2010 or later. Proposed projects – Must commence operation within 12 months of the award date. All projects – Must not have received supplemental funding from a public source, other than grants associated with the Delaware Green Energy Program (“GEP”) or grants in lieu of the investment tax credit.

Timeline Solicitation opens – all tiers April 2nd Tier 1 & 2A close April 6 th or when filled Tier 2B & 3 close April 13th Results announced for all tiers April 23rd

Tiers TierSize (kW)Number of SRECs/year Percentage of Total SRECs 1<502, % 2a50 – 2502,0009.1% 2b250 – 5002,0009.1% 3500 – 2,0004, % 4*>2,00010,60048% *The procurement of SRECs for Tier 4. for the 2011 compliance year was satisfied in full with the purchase of SRECs from the Dover Sun Park Project. Accordingly, the process for procuring SRECs from Tier 4 projects is not included in the initial pilot SREC Procurement Pilot Program.

Tiers TierSize (kW)Number of SRECs/year Percentage of Total SRECs Systems less than 250kw can waive their right to an administratively set price and bid in Tier 2b, but can’t bid twice. 2b250 – 5002,0009.1% 3500 – 2,0004, % 4*>2,00010,60048% *The procurement of SRECs for Tier 4. for the 2011 compliance year was satisfied in full with the purchase of SRECs from the Dover Sun Park Project. Accordingly, the process for procuring SRECs from Tier 4 projects is not included in the initial pilot SREC Procurement Pilot Program.

Pricing TierSize (kW)Years 1-10Years <50$260/SREC Base, $235/SREC Alternative* $50 2a50 – 250$240/SREC Base, $175/SREC Alternative* $50 2b250 – 500Bid Price$ – 2,000Bid Price$50 *projects that received a GEP grant before December 10, 2010

Award Process - Tier 1 and 2A Not Filled by April 6 th ? Tier remains open from April 2 nd, 8:00 AM EST until filled, all bids accepted. Tier Filled On or Before April 6 th ? Tier remains open until April 6 th at 5:00 PM EST. All bids entered into lottery. Lottery Step 1 All DE equipment & labor projects randomly sorted. Start at top of random list until tier filled. Lottery Step 2 If space remains after step 1, all DE equipment OR DE labor randomly sorted. Start at top of random list until tier filled. Lottery Step 3 If space remains after step 2, remaining projects randomly sorted. Start at top of random list until tier filled.

Award Process - Tier 1 and 2A There is no competitive advantage to submitting Tier 1 and 2A applications at 8:01 on April 2 nd ! Submitting applications earlier in the week does give bidder more time to resolve any issues with bid or receipt of bid deposit.

Award Process – Tier 2B and 3 Bid Period Tier remains open from April 2 nd at 8:00 AM EST to April 13 th at 5:00 PM EST April 13th All bids sorted by price Highest Bid Over- subscribes? Highest bid given option to reduce quantity If they decline, move to next higher bid Tied Highest Bid? In case of bidding tie, all tied parties given 5 day period to reduce bid If reduced bids produce winner, auction closes Highest Bid Still Tied Projects sorted by DE equipment & labor, DE equipment OR labor, or neither Random lottery starting with DE equipment & labor and moving down until filled

Application Requirements Owner representative for all projects less than 100kw Bid deposit of $100/kw for projects not yet built - wire deposit, letter of credit, or bid bond. Performance credit support for all Tier 3 projects – Years 1-10, 5% of value of 1 st year SREC quantity – Years 11-20, 10% of value of year 10 SREC quantity