1. 2  Pantex Plant Mission & Background  Federal Energy Goals  PREP Vision  Contract & Wind System Attributes  Project Management  R&D  PREP –

Slides:



Advertisements
Similar presentations
Financial ESPC Roundtable ESPC through Huntsville.
Advertisements

Antitrust/Competition Commercial Damages Environmental Litigation and Regulation Forensic Economics Intellectual Property International Arbitration International.
GPA Renewable Energy Resource for Guam Power Authority
FIFTH ANNUAL FEDERAL ENERGY WORKSHOP & DEFENSE ENERGY PARTNERSHIP FORUM | PAGE 2 Peter Y. Flynn, September 16, 2014 Utilizing ESPC to Develop Renewable.
Finance Emerging Renewable Technologies David McAndrew Federal Energy Management Program.
2011 ADC WINTER FORUM | PAGE 1 Developing Renewable Energy Projects on DoD Land Mr. Alan D. King Assistant Secretary of the Army for Installations, Energy.
Kansas Renewable Energy and Energy Efficiency Conference Wind 2007 RFP Update John Grimwade - Sr. Director Strategic Planning and Development September.
Net Metering and Interconnection Stakeholder Discussion Net Metering and Interconnection Stakeholder Meeting September 21, 2012 Discussion of.
Integrated Assessment of Off-shore Wind A Research Partnership between: Grand Valley State University Michigan Alternative and Renewable Energy Center.
Idaho Power Idaho Society of Professional Engineers June 22, 2012.
Ontario Electricity Industry : Planning Ahead Amir Shalaby VP, Power System Planning Ontario Power Authority Presentation to Canadian Nuclear Society The.
SOLAR IMPACT ON FYI Kevin Meikle, Architect Airports Planning Manager 4995 E. Clinton Way Fresno, Ca (559)
Meeting the Goal: Progress Report Washington, DC June 30, x’25 National Summit 2010: Mission Achievable.
FIFTH ANNUAL FEDERAL ENERGY WORKSHOP & DEFENSE ENERGY PARTNERSHIP FORUM | PAGE 2 Bruce Hedman, Institute for Industrial Productivity September 16, 2014.
Renewable Energy Vermont Vermont Perspectives, Activities, and Plans September 21, 2005 J. Riley Allen Vermont Department of Public Service.
George Godding Director DMC Office of Market Oversight and Investigations Federal Energy Regulatory Commission USEA/USAID Energy Partnership Program Brasilia,
Energy Retreat Institute for Sustainability, Energy, and Environment May 8, 2014.
Greta’s Grand Valley Wind Farm Contributing to Ontario’s Energy Future March, 2012 Greta Energy Inc.
Practical Ways For Towns to Save Money With Clean Energy Projects Paul Michaud Murtha Cullina LLP April 30, 2014.
DOE OFFICE OF INDIAN ENERGY Renewable Energy Project Development and Finance Framework: The 5 Step Process 1.
DOE/NNSA Pantex Plant Superfund Site Site Background Camille Hueni, EPA Region 6.
Economic Analyses of FPL’s New Nuclear Projects: An Overview Dr. Steven Sim Senior Manager, Resource Assessment & Planning Florida Power & Light Company.
Practical Ways for Towns to Save Money with Clean Energy Projects Doreen Hamilton April 30, 2014.
Small Farm Profitability: Is Wind Energy the Answer? 1
DOE Interconnection Activities Presented by: Eric M
DESC Small Business Forum Newport, RI Installation Energy September 10, 2009.
Energy Policy Levers. 2 State as a Taxing Authority Income tax credits or deductions Income tax credits or deductions Residential Alternative Energy Tax.
Woodland District 50: Operations and Facilities Report Energy Update 2012 Summer Work Five-Year Facility Plan Service Maintenance Agreement Night Time.
1 Revised Jennifer M. Granholm, Governor Lisa Webb Sharpe, Director Wind Strategy.
1 Utility Ownership of Wind Power: Why it makes sense now American Wind Energy Association May 17, 2005 Eric Markell Senior Vice President Energy Resources.
Community Choice Energy In San Mateo County County CCE Advisory Committee May 28, 2015.
Distributed Generation Programs, Incentives and Interconnections Ian Loughran, P.Eng. DSM Program Leader Renewable Energy Programs
Introduction to Bonneville Power Administration
LOGO Ho Chi Minh - November Developments in Energy Sector And Target I. Power Development Plan (Master Plan VII) approved by Vietnam.
Discussion of Feed-in Tariff Pilot Programs September 18, 2013 Presentation to the Regulatory Flexibility Committee of the Indiana General Assembly 1.
Renewable Energy in New Jersey’s Clean Energy Program Scott Hunter Renewable Energy Program Administrator, Office of Clean Energy in the New Jersey Board.
Phoenix Convention Center Phoenix, Arizona General Services Administration Areawide Contracts for Use With Regulated Utility Companies Institutional ChangeDoing.
Town Of Douglas A Review of the Town’s Proposed Tax Incentive Financing (TIF) Agreement With American Pro Wind, LLC Presented To The Douglas Finance Committee.
Federal Energy Management Program Renewable Working Group Renewable Power Purchases at Federal Facilities By David McAndrew Federal Energy Management Program.
Creating A Greener Energy Future For the Commonwealth Procurement of Renewable Energy on Landfills January 19, 2010 Courtney Feeley Karp, Esq.
Phoenix Convention Center Phoenix, Arizona Solution Showcase GSA’s NDER Program: Doubling the Energy Savings from Financed Projects Kevin Vaughn Schneider.
Supply Opportunities in Canada’s Wind Energy Market Stephen Rach CanWEA Toronto, Ontario October 6, 2010.
Phoenix Convention Center Phoenix, Arizona ANDREA L. KINCAID DLA Energy Integrated Energy TrackIntegration of the Energy Industry.
Selecting Renewable Projects at Colorado Springs Utilities APPA Conference John Romero GM Acquisition, Engineering and Planning October, 2009.
Assistant Secretary of the Navy (Energy, Installations & Environment) 1 Department of the Navy Renewable Energy Program Office (REPO) Overview Monica DeAngelo.
Lisa Linowes 2010 Mid-America Regulatory Conference Consumer Forum June 6 - 9, 2010 Kansas City, Missouri Wind Energy: An Assessment.
Office of Electricity Transmission and Distribution September 2003 Marshall Reed U.S. Department of Energy.
Phoenix Convention Center Phoenix, Arizona ANDREA L. KINCAID DLA Energy Track 5 Project FinanceSession 6 Renewables Through Private Financing.
I n t e g r i t y - S e r v i c e - E x c e l l e n c e Headquarters U.S. Air Force Renewable Energy Challenges -an Air Force view 1 Ken Gray Energy Rates.
1 Distributive Generation Wind Landfill Solar Fuel CellMicro-Turbine.
The Energy Policy Act of 2005 and Its Revisions to PURPA November 11, 2005 Grace D. Soderberg Assistant General Counsel National Association of Regulatory.
Colorado Harvesting Energy Network Jonathan Moore Director, Renewable Energy Development
City of Palm Coast, Florida City Council Meeting October 2, 2012.
1 Distributed Renewable Generation Legislation as of 5/02/07  SB 483 by Fraser- Relating to the regulation of electric generation capacity ownership in.
| 1 I NTRO TO R ENEWABLE E NERGY P ROCUREMENT Boston Green Ribbon Commission Clean Power Working Group.
Biomass Cogeneration Facility Savannah River Site Aiken, SC
1 Ventilation Systems Capital Asset Projects Safety Significant Confinement Ventilation System (15-D-411) Exhaust Shaft (15-D-412) Ronald.
Institutional Support Vladimir Koritarov Argonne National Laboratory April 2016.
Wind Prospect Experience and Practicalities of Wind Energy International Cooperation Forum for Energy Service Companies (ESCO’s) - Opportunities in China.
How Can the Federal Electronics Challenge (FEC) Help You? Federal Environmental Symposium June 5, 2007 Cate Berard U.S. Environmental Protection Agency.
Solar Electricity Generation: Government Leading by Example in Solar Deployment Federal Environmental Symposium June 5, 2007 U.S. Department of Energy.
Transforming Renewable Energy at the U.S. Department of Energy OFEE Symposium East – June 2008 Anne Sprunt Crawley U.S. Department of Energy.
1 Guidance on Renewable Energy in Federal Facilities under EO and EPACT 05 June 5, 2007 Anne Sprunt Crawley Federal Energy Management Program Energy.
R ENEWABLE E NERGY IN T EXAS Jess Totten Public Utility Commission of Texas 1.
UTC STUDY OF DISTRIBUTED GENERATION AND RECOMMENDATIONS Presentation for the Washington Future Energy Conference October 19, 2011.
Rick Khan, Director Federal Energy Management Program Department of Energy FEMP: Leading and Partnering with Agencies to Design and Build High Performing,
Unclassified1 Competitive Acquisition of Renewable Energy & Renewable Energy Certificates Andrea L. Kincaid, Contracting Officer Electricity & Renewables.
Affordable Energy Production from Renewable Fuel
Wind Industry Market and Policy Overview
How Small Developers and EPC Contractors Can Add PPA Financing to their Arsenals John Langhus, VP Business Development Midwest Solar Expo 2019 New Energy.
Presentation transcript:

1

2

 Pantex Plant Mission & Background  Federal Energy Goals  PREP Vision  Contract & Wind System Attributes  Project Management  R&D  PREP – Phase II 3

 The Pantex mission is Securing America as the NNSA'S production integrator and provider of the nuclear deterrent to the Department of Defense. 4

5

6

1.Federal gov’t to consume 7.5% renewable electric energy beginning FY13. (Energy Policy Act of 2005). Increased to 20% by Half of annual renewable energy must come from “new” energy sources and agencies must implement renewable energy generation on federal property. (EO 13423) 3.Each agency shall increase renewable energy use, implement projects on agency property, and reduce greenhouse gas emissions. (EO 13514) 7

 Vision: Install wind energy system up to 80 MW nameplate capacity with Texas Tech University Public-Private Partnership. 8

 RFP: Design, install, operate 9.0 – 15 MW wind farm using FAA approved locations.  NNSA Firm Fixed Price ESPC Contract  Siemens Government Technologies, Inc. Contract signed May 10, ◦ $50.5M Contract Value ◦ 18 year term 9

 Siemens Government Technologies, Inc. ◦ 11.5 MW system  Five (5) 2.3 MW Siemens w/ 101 meter blades  Five (5) yr full system warranty  Five (5) yr maintenance w/ five (5) option years ◦ 47,000 MWH/yr production  Pantex Plant uses ~72,000 MWH/yr  ~65% of plant load ◦ System life is 25 years 10

 Expected Savings ◦ Yr(1):$1,768,907 ◦ 25 Yrs:$84.4M  5% energy escalation  Cost Benefit: $84.4M – $50.5M = $33.9M 11

 94,000 RECs/yr ◦ 47,000 RECs/yr produced ◦ Double counting eligible (EPACT 2005)  Pantex 7.5% Requirement = 5,400 RECs  Pantex 20% Requirement = 14,400 RECs  Surplus RECs spread to NNSA complex 12

13 MilestoneDate CD-0: Mission Need, ApprovedApril 2009 Qualifying Facility DesignationJune 2009 CD-1: Approve Alternative Selection and Cost Range, Denied April 2010 Energy Savings Performance Contract(ESPC) Acquisition Strategy Approved June 2011 Federal Aviation Administration(FAA) Approved Five (5) 426 ft. Locations April 2012 ESPC Request For Proposal Released September 2012 Contract AwardMay 2013 OperationalJuly 2014

14

15 PREP DevelopmentNEPAFAA Investment Grade Data Acquisition RFP Development RFP ReleaseSelectionImplementationInterconnectionPhysicalUtility TariffConstruction

OnePREP Team Champion NPO Production Office Design Engineering Idaho National Labs NREL System Engineering B&W Pantex Contracting Contracting Officer Utility Management Consultant Agency Attorney 16

 NEPA  Federal Aviation Administration Obstruction Evaluation  12 months of Investment Grade Data ◦ 60m Met Tower 17

 Acquisition Strategy  RFP Development  Bidder Selection ◦ PREP Evaluation Factors  Experience  System Capability  Understand Performance Modeling  Management Capability 18

 Construction  Physical Interconnection  Tariff Interconnection 19

20 System Impact Study Facility Study Install System Upgrades Power Backfeed

 Xcel Energy Electric Tariff(s) ◦ From: Large General Services ◦ To:  Large General Services  Transmission Standby Service  Purchase of Non-Firm Energy From Qualifying Facilities 21

 Data Collection and Analysis – All raw data collected as part of the manufacture/developers data collection systems associated to the wind farm will be made available to the TTU.  Optimization Research - Perform various operational test and performance evaluations to investigate improving system production.  New Technology Development - Perform additional studies, equipment installation/testing, etc. to further the development of the wind farm and power generation. 22

 Additional 35MW East of 2373  FAA VOR approach removal  Request For Information(FY13)  Regulatory Study(FY14)  Acquisition Strategy(FY14)  Acquire & Construct(FY16) 23

John M. Herrera PREP Contracting Officer Representative & Project Manager