1 Contractor Pre-qualification. 2 What Is Contractors PQ? Screening construction contractors according to a pre determined set of criteria in order to.

Slides:



Advertisements
Similar presentations
Office of Purchasing and Contracts Research Funded Procurement Outreach Training Level III Procurements $50,000 and Above.
Advertisements

Best Value Pre-selection and Procurement
Tendering Yuck!.
Pre qualified Contractors or Professional Contractors: Role of BPP in stopping quackery in the Water Industry Presented by Engr. Emeka Ezeh OFR Director-General,
GSA Public Buildings Service How to Submit a Proposal.
Evaluating Work: Job Evaluation
Request for Proposal - Best Value Generally RFP’s are created for large dollar technical purchases, services and consultants.  Consideration in addition.
Contents Introduction General Description of Tender Process Threshold Requirements Submission of Bids Evaluation Award Post-Award Actions Principles of.
Procurement in PPPs February 27, When do you start thinking about procurement? Preliminary Scoping & teaming Viability assessment Choice between.
Generation Business Line
Gene Shawcroft, P.E. Central Utah Water Conservancy District April 29-30, 2013.
Presentation for Thesis of Master Degree Done by Ali Abdullah Al Salman CEM – 520 Term Project (Paper Presentation) Assessments of Risk Management Perception&
New Point Based System For the Procurement of Works CDB 1.
CIVL202 Construction Engineering I
KING FAHD UNIVERSITY OF PETROLEUM & MINERALS DHAHRAN SAUDI ARABIA DEPARTMENT OF ARCHITECTURAL ENGINEERING ARE 520: Advanced Construction and Maintenance.
PROCEDURES FOR SELECTING THE CONTRACTOR
Operations and Supply Chain Strategies
Selection of Consultant Nazaneen I. Ali Sr. Procurement Specialist 1.
SURETY BONDS 101 The Basics of Bonding. Surety Bonds 4 A surety bond is an instrument under which one party guarantees to another that a third will perform.
Defn Jack Ninemeir defines purchasing as "the series of activities designed to obtain products of the right quality and quantity at the right price and.
Building a Better Bid The Nuts & Bolts Dave Leonard The World Bank.
© 2006 ITT Educational Services Inc. SE350 System Analysis for Software Engineers: Unit 3 Slide 1 Chapter 4 Identifying and Selecting Systems Development.
© 2005 by Prentice Hall Chapter 4 Identifying and Selecting Systems Development Projects Modern Systems Analysis and Design Fourth Edition Jeffrey A. Hoffer.
The Point Based System For Contractor Selection For Award Of Construction Works Accelerating Bhutan’s Socio-Economic Development- GNHC, MoWHS & MoF.
Chapter 4 Identifying and Selecting Systems Development Projects
Joint Venture in construction company in West Bank.
United Nations Procurement Division
VALUE FOR MONEY 1 OGC buying.solutions Procurement of Projects Presented by Andy Hamer Pre Accession Advisor, Finance Ministry.
CHAPTER 4 Employee Selection
Copyright © 2003 by The McGraw-Hill Companies, Inc. All rights reserved.
Introduction Procurement of Consultant Services (based on PPA 2004 and Best Practices) Presented by: NM Lema Macrh, 2013.
1 SEC Distribution Field Force Overview Distribution Contractors Day with Saudi Electricity Company October 28 th, 2015.
Elevating the Quality of Life in the District Contracting and Procurement Division Information Session 2 Request for Proposal November 5, 2015.
Benchmark An objective test or measurement that can be used to evaluate the speed, capacity, capabilities, or productivity of competing products.
At Lewis Field Glenn Research Center Industry Briefing Solicitation No. NNC04Z70010R Construction Services Contract June 15, 2004.
Brittany Giel University of Florida Ph.D. Candidate Center for Advanced Construction Information Modeling January 8, 2013 Measuring Success - Metrics.
How to do business with the Pharmaceutical Industry Contractor Pre-Qualification Presented by: Graciano Mestres Pfizer Pharmaceuticals LLC.
CONSTRUCTING WEST MIDLANDS Question & Answer Session 22 nd March 2011 LOTS 1-6.
Evaluation. What is important??? Cost Quality Delivery Supplier Expertise Financial Stability Coverage Product Offerings Do you intend to negotiate?
How to succeed in International Tenders Ing. Miloš TKÁČ MTC – Engineering / Consulting / Sales Južná trieda 93 – P.c. Strojár, Košice tel.: 055 / 6808.
Assessment of the Bidding Process in Construction Project ABDULLAH H. ABU ZANT. AYMAN K. ILAIWI. MOHAMMED FADEL. SODQI M. ALHNAINI. AN-NAJAH NATIONAL UNIVERSITY.
FIDIC Tendering Procedures
Construction Tender Process Tender steps between Client, Contractor and Subcontractor Dr A Kimmance.
Chapter 4 Identifying and Selecting Systems Development Projects
JOB EVALUATION MAGNETIC CONTACTORS 1/26/2018.
An Introduction to Procurement
Procurement & Strategic Sourcing
Contractor Review and Prequalification
Contract Formulation and Administration
City of Ottawa, NCHCA & CEO 2017 Education Series
Award Management Services
Qualification Criteria and Available Tender Capacity
Understanding The Benefits Of Surety Bonds
Call for competition process
(Additional materials)
Highways & Infrastructure Best Value Construction Procurement Presentation November, 2017.
Request for Proposal - Best Value
Decision Matrices Business Economics.
9/18/2018 Bids CONTRACTING Khamis…..
SEC Distribution Field Force Overview
Request for Proposal - Best Value
Chapter 4 Identifying and Selecting Systems Development Projects
Chapter 11 Sources of Capital
United Nations Procurement Division
Omnibus IV Contracting Strategy Michael D’Alessandro
Chapter 4 Identifying and Selecting Systems Development Projects
Some valuable tips about how to go about constructing a project
Factors Affecting Bid/No Bid Decision Making IN The West Bank
Provision of HR Services, UNOPS Nepal
Procurement of Works -1 Ghana Shyam Gautam.
Presentation transcript:

1 Contractor Pre-qualification

2 What Is Contractors PQ? Screening construction contractors according to a pre determined set of criteria in order to determine their competence or ability to participate in the project bid.

3 Awarding Authorities Should Verify That the Bidder Has: Adequate financial resources, experience, personnel resources, and equipment to perform the task. The ability to comply with the required performance and time schedule.

4 Benefits of PQ Avoiding overburdened of the contractor. Elimination limited financial sources contractors. Only the qualify will stay. Protecting the contactor. Speeding devaluation & awarding process. Moving from subjectivity to objectivity.

5 Tenders PQ

6 Contractor Data Sources: 1. Internal: Reports,documents,..Etc. 2. External: Questionnaire filled by the contractor. Additional sources (banks, suppliers,..Etc). Site visits to currently projects done by the contractor.

7 Typical Questionnaire Includes: Introduction: a brief description of the project. Organization: classification and company’s organizational chart. Financial resources: financial capability of the contractor. Physical resources: contractor manpower, equipment, …etc. Experience: contractor experience on similar projects.

8 Contractor PQ Process

9 PQ Elements 1 )LITTER TO CONTRACTORS (invitation) 2)PRE-QUALIFICATION FORM: A) Information for the contractor: i)Objective and scope of work ii)General information 1)Degree of eligibility 2)Formation of partnership or joint venture 3)Bonding capacity 4)Official language 5)Supply materials

10 PQ Elements Cont.. 6)Questionnaire submission 7)Beginning and duration of construction B) PQ questionnaire: i)Identification of the contractor ii)Contractor performance iii)Contractor’s equipment iv)Construction ability v)Completion ability vi)Client relationship C)Certification and waves

11 Contractor Rating Strategies: A) dimensional weighting strategy: Contractor Selection Criteria W E I G H T (%) X Contractor ABC YX*YY Y Experience in Completion of Project on Schedule Present Workload & Capability to Support Project Availability of first-Line Supervisors Total Score

12 Contractor Rating Strategies Cont.. B)two-step pre-qualification: Allow to eliminate unwanted contractors. Contractor to satisfy selected screening dimensions. If passes, use DWS with more specific criteria.

13 Paired Comparison Criteria Weighting:

14 Evaluation Matrix:

15 Model Philosophy: Uses DWS based on multiple-criterion decision-making. Approach assumptions: Impact for each criterion ( 1unsatisfactory to 10 excellent). Obtain numerical value from PQ questionnaires. Addition or deletion of decision parameters have no dependency of model ’ s parameters.

16 Model Philosophy Cont..

17 Model Calculation: a. Calculate the mean impact for each DF included in each CDF. b. Calculate the DF weight to each DF from equation: Where: wij = the weight of the DFj associated with the CDFi. DFMIij = the mean impact of the DFj associated with CDFi, zero (no impact) to four (very high impact).

18 Model Calculation Cont..

19 Model Calculation Cont..

Example:

Example Cont..

Result: Contractor A has the highest score followed by Contractor C then contractor B.

23 Model Advantages: Simple and understandable. Provides a systematic approach for all candidate evaluation. The calculated aggregate weighted score for each contractor provides a basis for comparison.