Summary of NEPA and SEPA Coastal Engineering and Land Use Issues in North Carolina Greenville, NC January 13, 2009 Sean M. Sullivan.

Slides:



Advertisements
Similar presentations
National Environmental Policy Act of 1969 (NEPA).
Advertisements

Ron Bass, J.D., AICP, Senior Regulatory Specialist Jones & Stokes Common NEPA Mistakes and How to Avoid Them January 17, 2008 Oregon Department of Transportation.
SAFETEA-LU Efficient Environmental Review Process (Section 6002) Kelly Dunlap.
Introduction to EIS/EA Managing the Environmental & Project Development Process Presented by the Ohio Dept. of Transportation.
1 CDBG and Environmental Review For Grant Administrators.
36 CFR 218.  Moves projects documented in an Environmental Assessment (EA)/Decision Notice (DN) or Environmental Impact Statement (EIS)/Record of Decision.
Agency Drafts Statement of Scope Governor Approves (2) No Agency Drafts: Special Report for rules impacting housing Fiscal Estimate.
Environmental Compliance Negotiating our way through the process…
National Pollutant Discharge Elimination System -NPDES Permit Process-
Bureau of Land Management Regulations Washington State Association of Counties Cooperating Agency & Coordination Training November 22, 2013 – Vancouver,
FOIA and NEPA Federal Highway Administration Environmental Conference June 2006.
Historical Background to NEPA Early 60’s – Congress starts to consider growing pollution problem Early 60’s – Congress starts to consider growing pollution.
NHPA, Section 106, and NEPA Highlights and Misconceptions.
The National Environmental Policy Act (NEPA)
Deciding How To Apply NEPA Environmental Assessments Findings of No Significant Impact Environmental Impact Statements.
Module 15 Environmental Considerations Civil Works Orientation Course - FY 11.
Negotiating the NEPA Maze: It Really Is Rocket Science Start.
Draft RMP/EIS. Objectives Write a draft land use plan and EIS. Issue a draft land use plan and EIS for public review.
Connecticut Department of Transportation Bureau of Policy & Planning.
L O N G B E A C H, C A. Ryk Dunkelberg Barnard Dunkelberg & Company Roles Of Sponsor, Consultant and FAA During NEPA Process L O N G B E.
CHAPTER 2 ENVIRONMENTAL DOCUMENTS AND PROCESSING.
HABITAT CONSERVATION PLANNING Charles J. Randel, 1 III, Howard O. Clark, Jr., 2 Darren P. Newman, 2 and Thomas P. Dixon 3 1 Randel Wildlife Consulting,
Page CDBG Recipients' Workshop Community Finance Division NEPA Environmental Procedures.
 Administrative law is created by administrative agencies which regulate many areas of our government, community, and businesses.  A significant cost.
© 2013 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part, except for use as permitted in a license.
1 Overview of National Environmental Policy Act (NEPA)  Objective: Clarify the roles of NEPA and Negotiated Rulemaking Clarify the roles of NEPA and Negotiated.
What If I Have to Go Beyond an IEE?. EA Training Course Tellus Institute 2 Environmental Assessments (EAs) & Programmatic Environmental Assessments (PEAs)
Building Strong! 1 US Army Corps of Engineers Regulatory Program Kimberly McLaughlin Program Manager Headquarters Operations and Regulatory Community of.
Agency Drafts Statement of Scope Governor Approves Statement of Scope (2) No Agency Drafts: Special Report for rules impacting housing
SUA Process Overview FAA JO
CHAPTER 3 SCOPING AND AGENCY COORDINATION. Scoping - the procedure for determining the appropriate level of study of a proposed project/activity - process.
Energy, Environmental Impacts, and Sustainable Development Presented by Cat Shrier, Ph.D., P.G. Water Resources Planner (403)
SAFETEA-LU Section 6002 “ Efficient Environmental Reviews for Project Decisionmaking”
Implementing the Regulatory Flexibility Act. 2 Background The Regulatory Flexibility Act (5 U.S.C. 601–612) requires Federal agencies to— –Consider the.
U N I T E D S T A T E S D E P A R T M E N T O F C O M M E R C E N A T I O N A L O C E A N I C A N D A T M O S P H E R I C A D M I N I S T R A T I O N State.
NEPA Environmental Procedure Pam Truitt, Grants Specialist  September 10, 2015.
1 CEQA and CEQA-Plus Presented by Cookie Hirn, Lisa Lee, and Michelle Jones Regional Programs Unit July 2008.
Dominguez-Escalante National Conservation Area Dominguez Canyon Wilderness Resource Management Plan Scoping Meetings August 30 and 31, 2010.
1 Implementing the Concepts Environment Pre-Conference Workshop TRB MPOs Present and Future Conference August 27, 2006 Michael Culp FHWA Office of Project.
1 CDBG and Environmental Review For Local Officials.
Administrative Law The Enactment of Rules and Regulations.
Streamlining NEPA for Reusable Launch Vehicles Federal Aviation Administration Associate Administrator for Commercial Space Transportation October 2004.
Cooperating Agency Status Presented by Horst Greczmiel Associate Director, NEPA Oversight Council on Environmental Quality Washington, DC September 14,
CHAPTER 4 ALTERNATIVES. --- “The driving impetus for conducting environmental impact studies is to comparatively present the effects of proposed alternatives.
NRC Environmental Reviews for Uranium Recovery Applicants and Licensees James Park (301)
Managing the Environmental & Project Development Process Presented by the Ohio Department of Transportation NEPA&CEQ.
LBNE Environmental Assessment NEPA Informational Meeting May 23, 2013 Rod Walton, LBNE NEPA Manager.
Rulemaking by APHIS. What is a rule and when must APHIS conduct rulemaking? Under U.S. law, a rule is any requirement of general applicability and future.
FTA Real Estate March 26, 2014 Christopher S. Van Wyk Director FTA Environmental Office.
1 1 CEQA Scoping Naomi Feger Planning TMDL Section Leader Region 2.
National Environmental Policy Act Environmental Engineer US Army Garrison.
By: Alyssa Kaiser and Celia Rozanski. Before the Act Prior to 1969, the USA had no clear environmental policy Prior to 1969, the USA had no clear environmental.
Peter Lukáč Ministry of Environment of the Slovak Republic Department of Environmental Assessment.
CEQA 101 CEQA City of Sacramento Community Development Dept. March 2016.
Integration of National Environmental Policy Act (NEPA) and National Historic Preservation Act (NHPA) NEPA and NHPA A Handbook for Integrating NEPA and.
CEQA 101  CA Legislature passed CEQA in 1970; signed by Governor Reagan  CEQA statutes are found in Public Resources Code sections et seq.  The.
Environmental Review for Grant Projects Montana Coal Board December 2014.
EIAScreening6(Gajaseni, 2007)1 II. Scoping. EIAScreening6(Gajaseni, 2007)2 Scoping Definition: is a process of interaction between the interested public,
Welcome to the Public Comment Hearing on the Proposed Regulatory Update to the California Environmental Quality Act AB 52, Gatto (2014) Heather Baugh Assistant.
Introduction to the California Environmental Quality Act (CEQA)
The Rulemaking Process
National Environmental Policy Act of 1969 (NEPA)
National Environmental Policy Act (NEPA)
National Environmental Policy Act of 1969 (NEPA)
Unit 6 NEPA.
National Environmental Policy Act of 1969 (NEPA)
Environmental Requirements and planning grants
The National Environmental Policy Act (NEPA)
NEPA Assignment Program Overview
Presentation transcript:

Summary of NEPA and SEPA Coastal Engineering and Land Use Issues in North Carolina Greenville, NC January 13, 2009 Sean M. Sullivan

Overview »Summary of the Acts »Applicability »What’s Required »The Process »Practical Considerations

Overview »Summary of the Acts »Applicability »What’s Required »The Process »Practical Considerations

Summary of the Acts »National Environmental Policy Act ›42 U.S.C. § 4321, et seq. ›Purpose – Ensure that federal agencies investigate and consider the environmental consequences of their actions. ›Environmental Impact Statement (“EIS”).

Summary of the Acts (cont’d) »North Carolina Environmental Policy Act (“SEPA”). ›N.C.G.S. § 113A-1, et seq. ›Purpose – Require state agencies to consider and report on the environmental consequences of their actions.

Summary of the Acts (cont’d) »Both statutes are procedural in nature. ›They force federal and state agencies to evaluate and consider the effects of their actions. ›Neither statute requires an agency to alter its plans based on the results of the analysis.

Summary of the Acts (cont’d) »Implementing Regulations – for both NEPA and SEPA, individual agencies have their own procedural regulations in addition to the general regulations. »Compliance with NEPA will satisfy SEPA as well.

Overview »Summary of the Acts »Applicability »What’s Required »The Process »Practical Considerations

Applicability »NEPA – a federal agency must prepare an EIS for any: ›“Major federal action significantly affecting the quality of the human environment.” (MFASAQHE). ›Can apply to: ›Internal policy decisions ›Rulemakings ›Permitting Decisions

Applicability (cont’d) »Determining whether NEPA Applies ›Rule – if the effects of an action will not rise to the level of a MFASAQHE, an EIS is not required. ›Procedure ›Some actions are designated as requiring an EIS by regulation; or ›An agency can perform an Environmental Assessment (“EA”) to determine if an EIS is necessary; or ›An agency can establish Categorical Exemptions from NEPA for certain actions.

Applicability (cont’d) »Three Criteria for SEPA to Apply: ›State Actions; ›That will significantly affect the quality of the human environment; and ›Involve either: ›Expenditures of public money; or ›Use of State Land

Applicability (cont’d) »Determining whether SEPA Applies ›Same basic format as for NEPA ›SEPA has Minimum Criteria rather than Categorical Exemptions. ›Minimum Criteria ›In order for an action to be exempt, it must satisfy both: ›General minimum criteria; and ›Specific minimum criteria.

Applicability (cont’d) »When in doubt, do an EA. ›For NEPA and SEPA. ›Goal - Determine whether to prepare an EIS. ›An EA analyzes the environmental effects of a project, but the question is the extent of the effects.

Applicability (cont’d) »Effects to consider in the EA: ›Direct effects – immediate consequences of the proposed action. ›Indirect effects – reasonably foreseeable effects of the proposed action. ›Cumulative effects – effect of the proposed action when combined with other existing or planned actions.

Applicability (cont’d) »Two Choices Based on Result of EA: ›Finding of No Significant Impact (“FONSI”). ›No EIS required. ›Proposed action requires an EIS.

Overview »Summary of the Acts »Applicability »What’s Required »The Process »Practical Considerations

What’s Required »The lawyer’s answer – It depends. »Two basic paradigms: ›If NEPA applies to the proposed action, follow the NEPA Paradigm. ›If NEPA does not apply to the proposed action, but SEPA does, follow the SEPA Paradigm.

What’s Required (cont’d) »The NEPA Paradigm ›Recall that if both NEPA and SEPA apply to an action, compliance with NEPA will satisfy SEPA as well. ›Caveat – If SEPA applies, you must submit your NEPA documents for distribution through the NC clearinghouse process. ›Consult the agency’s regulations to determine how to proceed (EIS, EA, or Categorical Exemption).

What’s Required (cont’d) »The SEPA Paradigm ›State agencies typically prepare an EA before doing an EIS. ›But, they have discretion to proceed directly to an EIS. ›State agencies document their review of the EA and/or EIS and their ultimate decision in a Record of Decision (“ROD”).

What’s Required (cont’d) »The Mitigation Concept ›The proponent can mitigate the effects of a project to the point that an EIS is not required and a FONSI is appropriate. ›Mitigation steps must be legally binding. ›Example – incorporation of mitigation requirements into a final permit.

What’s Required (cont’d) »The Mitigation Concept (cont’d) ›Examples of Mitigation ›Refraining from certain actions to limit the effects of a project. ›Repairing or rehabilitating the environment. ›Compensating for the effects through other actions.

What’s Required (cont’d) »Required Content of the EIS ›Purpose and need for the project; ›Description of the affected environment; ›Effects of the project (direct, indirect, cumulative); and ›Alternatives analysis (including no action).

Overview »Summary of the Acts »Applicability »What’s Required »The Process »Practical Considerations

The Process »NEPA Procedures ›For NEPA, the level of public interest in a project can affect the process. ›Some public notices are mandatory and some are discretionary. ›EA/FONSI – Public notice is discretionary.

The Process (cont’d) »NEPA Procedures (cont’d) ›For an EIS, public notice and comment on the draft EIS is mandatory. ›Timing Constraints ›Comment period on draft EIS must be at least 45 days. ›No final decision until at least 90 days have passed since publication of the notice of availability regarding the draft EIS. ›Notice of availability for final EIS must be published at least 30 days prior to agency’s final decision.

The Process (cont’d) »NEPA Procedures (cont’d) ›Judicial Review ›Done as part of judicial review of overall agency action. ›Standard – courts apply deferential “arbitrary and capricious” standard of review. ›Caveat – courts must ensure that the agency took a “hard look” at the consequences of the proposed project.

The Process (cont’d) »NEPA Procedures (cont’d) ›SEPA Clearinghouse Requirements ›If SEPA applies to your project as well as NEPA, you must distribute the NEPA documents through the clearinghouse process.

The Process (cont’d) »SEPA Procedures ›NC Department of Administration Clearinghouse Procedures ›EAs, FONSIs, draft EISs and final EISs must be distributed through this procedure. ›Affords other state agencies the opportunity to comment. ›Initiates a public comment period as well.

The Process (cont’d) »SEPA Procedures (cont’d) ›Judicial Review ›Compliance with SEPA is reviewed during review of overall agency action. ›Standard – courts apply deferential “arbitrary and capricious” standard of review. ›First step is to file a contested case with the Office of Administrative Hearings.

Overview »Summary of the Acts »Applicability »What’s Required »The Process »Practical Considerations

Practical Considerations »Scoping – Purpose and Need ›The questions you ask determine the answers that you get. »Other Consultation Statutes May Apply ›National Historic Preservation Act ›Can incorporate into NEPA review. ›Endangered Species Act ›May need consultations with US Fish and Wildlife Service. ›May affect availability of categorical exemptions.

Practical Considerations (cont’d) »Dot your “I’s” and cross your “T’s” ›NEPA compliance is a favorite for environmental groups opposed to a project. ›Ultimately, the statutes are procedural and compliance is within your control.

Contact Information Sean M. Sullivan Williams Mullen 3200 Beechleaf Court, Suite 500 Raleigh, NC (919)