S.MonteilPS/SPD COMMISSIONING1 OUTLINE 1)Overview of the system. 2)Discriminating errors. 3)Tricks. RUNNING PRS AND SPD – FIRST DRAFT TUTORIAL.

Slides:



Advertisements
Similar presentations
16JAN08CaloECSMeeting - Xvc1 Calo ECS meeting DCS and PS/SPD temperature monitoring Xavier Vilasis-Cardona.
Advertisements

Trigger Validation Board PVSS panels tutorial 1. TVB components 2 FPGA controls :  FPGA HCAL hadron trigger  FPGA EPPI electron, photon, pi0, Global.
Laboratoire de l’Accélérateur Linéaire (IN2P3-CNRS et Université Paris-Sud 11), Orsay, France Olivier Callot 21 September 2005 Calorimeter Configuration.
1 CALO DCS power supply status CALO meeting Anatoli Konoplyannikov [ITEP / LAPP] Outline  Introduction  Power supply description with hardware.
Yu. Guz 2015/04/211 CALO HV Updated version of the 2012 slides, ** See also Anatoli’s.
1 ECS CALO HV Control CALO Piquet Training Session Anatoli Konoplyannikov /ITEP/ Outline  ECS HV control of the ECAL and HCAL.  ECS HV control.
Chapter 17: Watching Your System BAI617. Chapter Topics Working With Event Viewer Performance Monitor Resource Monitor.
Calo Piquet Training Session - Xvc1 ECS Overview Piquet Training Session Cuvée 2012 Xavier Vilasis.
ECS for Front-End crates MARATON. 2 Introduction Front-End crates are powered by MARATON power supplies, located on the platform, at the back of each.
MDT PS DCS for ATLAS Eleni Mountricha
User guide for Muon shifter part 2 : control of LV, HV, TELL1 Preliminary version 9-July-08 (written by Michela) HV part updated by Oleg Maev 4-November-09.
Tools Menu and Other Concepts Alerts Event Log SLA Management Search Address Space Search Syslog Download NetIIS Standalone Application.
S.MonteilPS/SPD COMMISSIONING1 PS/SPD COSMICS STATUS COMMISSIONING MEETING – JUNE W2 Large cosmics runs have been taken last week : THE POSITIVE.
ECS for Front-End crates MARATON. 2 Introduction Front-End crates are powered by MARATON power supplies, located on the platform, at the back of each.
Controls EN-ICE Finite States Machines An introduction Marco Boccioli FSM model(s) of detector control 26 th April 2011.
1 Control Software (CAT) Introduction USB Interface implementation Calorimeter Electronics Upgrade Meeting Frédéric Machefert Wednesday 5 th May, 2010.
1 Outline Firmware upgrade of the HV_LED_DAC boards. HV Status Bits board. Status of the board integration into the LHCb TFC system. CALO HV system and.
Laurent Locatelli LHCb CERN Calo commissioning meeting 16th April 2008 Trigger Validation Board PVSS control status 1.
1 ECS CALO HV Control CALO Piquet Training Session Anatoli Konoplyannikov /ITEP/ Outline  ECS HV control of the ECAL/HCAL sub-detectors.  Introduction.
26JUN08Calo Piquet Training Session - Xvc1 DCS and DSS Xavier Vilasis.
PS FE Board Tests LHCb - LPC Group R. Bonnefoy, G. Bohner, C. Cârloganu, E. Conte, R. Cornat, E. Delage, J. Lecoq, M-L. Mercier, P. Perret, L. Royer Electronic.
Calo Piquet Training Session - Xvc1 DCS and DSS Cuvée 2015 – RUN2 Xavier Vilasís-Cardona.
L0 DAQ S.Brisbane. ECS DAQ Basics The ECS is the top level under which sits the DCS and DAQ DCS must be in READY state before trying to use the DAQ system.
PS VFE & PS/SPD FE Electronics Status and Plans 21 November 2007 LPC Clermont.
04ABR07Calo Commissioning Meeting - Xvc1 Power Supplies Xavier Vilasis-Cardona.
Running SPD OUTLINE VFE and CB overview Mapping CB panel: -Regulator board tab: how to switch ON/OFF the VFEs -Control tab: how to mask VFE -Test tab:
S.MonteilCaloPiquet1 August 2010 – A typical online Calo Piquet Analysis - Outline of the analysis (Fill 1264 – Run #77195) 1. Calorimeter 2DViews, inclusive.
1 The Muon Shifter October Forewords This pages are meant to initiate people who are not familiar with ECS (Experiment Control System), and Muon.
S.MonteilCOMMISSIONING1 PS/SPD ELECTRONICS OUTLINE 1)STATUS OF PS/SPD FE BOARDS PRODUCTION 2)PHASES OF PS/SPD COMMISSIONING 1)LEDs AND DETECTORS 2)TUBES.
Slide 1 / 14 PSFEB Status Report LHCb Clermont Production Test preview of the PreShower Front-End Boards February the 1 rst, 2007.
1 User guide for Muon shifter part 2 : control of LV, HV, TELL1 Preliminary version 9-July-08 (to be checked by Michela) I have simply put together the.
ECS and LS Update Xavier Vilasís-Cardona Calo Meeting - Xvc1.
DCS Instructions K. Grogg, M. Weinberg, M. Grothe 1/24/20161.
Muon Piquet Training V.0 W Baldini, E.Furfaro, O. Maev June 11-th 2015.
1 Calorimeters LED control LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Status of the calorimeters LV power supply and ECS control Status of.
Common test for L0 calorimeter electronics (2 nd campaign) 4 April 2007 Speaker : Eric Conte (LPC)
S.MonteilPRS timing1 November Clermont team - Calorimetry meeting Preshower timing / The cosmics and TED results / Collection of plots. 1. Overview.
S.MonteilPS/SPD COMMISSIONING1 OUTLINE 1)STATUS SUMMARY. 2)PLANS AND OPERATIONS FOR THE NEXT MONTH. 3)CONCLUSION. COMMISSIONING MEETING – NOVEMBER 2007.
1 Summary of Calorimeter LED monitoring, LV & MV power and HV electronics + ECS control Anatoli Konoplyannikov Outline  Software tool of the LED.
SPD VFE installation and commissioning (status and plans) I.Summary of VFE installation II.Stand alone VFE test: noise & offset III.Stand alone test: LED.
In the (rare) normal operation mode main actions for editing the settings of the muon system and for checking the configuration and the noise level of.
S.MonteilPS/SPD COMMISSIONING1 OUTLINE 1)PROGRESS REPORT. 2)PLANS. 3)CONCLUSION. COMMISSIONING MEETING – JUNE 2008.
1 Status of Validation Board, Selection Board and L0DU Patrick Robbe, LAL Orsay, 19 Dec 2006.
S.MonteilPS/SPD COMMISSIONING1 HW Maintenance – JANUARY Clermont team Outline: 2009: restart the system: few observations. Hw maintenance C-side:
1 ECS CALO HV Control CALO Piquet Training Session Anatoli Konoplyannikov /ITEP/ Outline  ECS HV control of the ECAL/HCAL sub-detectors.  Introduction.
Calorimeter global commissioning: progress and plans Patrick Robbe, LAL Orsay & CERN, 25 jun 2008.
1 ECS CALO LED Control System CALO Piquet Training Session Anatoli Konoplyannikov /ITEP/ Outline  Introduction  Calorimeter ECS LED monitoring.
1 LHCb CALO Anatoli Konoplyannikov Introduction Short recipe of the calorimeter Marathon crates control Step by step explanation Marathon power.
Piquet report Pascal, Yuri, Valentin, Tengiz, Miriam Calorimeter meeting 16 March 2011.
Piquet report (07/Aug/ /Aug/2012) D. Pinci.
Yu. Guz 14/03/20121 CALO HV ** See also Anatoli’s slides for the 2009 piquet training **
30/March/2009SPD commissioning activities1 SPD status (1)Electronics tests (2)Control/clock cables problem (3)Plans Calo commissioning activities meeting.
How to Fix Missing WMVCore.dll Error in Windows 10
Clara Gaspar, February 2007 LHCb’s Experiment Control System & Electronics Integration Step by Step.
20OCT2009Calo Piquet Training Session - Xvc1 ECS Overview Piquet Training Session Cuvée 2009 Xavier Vilasis.
27SEP2008Calo Running and Operation Monday Meeting - Xvc1 ECS Xavier Vilasis-Cardona.
Calorimeter Cosmics Patrick Robbe, LAL Orsay & CERN, 20 Feb 2008 Olivier, Stephane, Regis, Herve, Anatoly, Stephane, Valentin, Eric, Patrick.
1 L0Calo ECS. 2 Introduction L0Calo consists in several boards: –In the cavern: Front-End Boards, Trigger Validation Boards and SPD Multiplicity Boards.
Muon Shifter Start Manual – July 08 1 The (im)Perfect Muon Shifter.
23MAY07Xvc - Calo ECS Working Group1 Calo FSM hierarchy and structure Xvc.
1 Calorimeter LED & LV - HV control systems LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Outline Status of the calorimeters LV & MV power supplies.
09/02/20121 SPD Status Joan Mauricio La Salle (URL) / Universitat de Barcelona (UB) 14/04/2015.
Computer Science 210 Computer Organization
MiniDAQ2 Workshop Control System.
Computer Science 210 Computer Organization
Computer Science 210 Computer Organization
Pierluigi Paolucci & Giovanni Polese
Pierluigi Paolucci & Giovanni Polese
Tools for the Automation of large distributed control systems
Setting Up Your MountConnect Profile/ Uploading Your Job Correspondence/ Accessing Your 12Twenty Passport.
Presentation transcript:

S.MonteilPS/SPD COMMISSIONING1 OUTLINE 1)Overview of the system. 2)Discriminating errors. 3)Tricks. RUNNING PRS AND SPD – FIRST DRAFT TUTORIAL

S.MonteilPS/SPD COMMISSIONING2 1) RUNNING PRS AND SPD

S.MonteilPS/SPD COMMISSIONING3 1) RUNNING PRS AND SPD To operate PRS and SPD, you need to have: VFE power supply ON : INFDAI project. HV on the tubes ON : PRSHV projects (- see corresponding tutorial). but not only : LV and MV hardware have to be settled up. FE Electronics Crates ON : INFDAI project. Whenever an error occurs at the configuration of FE electronics, it is most likely related to one of the three preceding items. This is the first things to be checked.

S.MonteilPS/SPD COMMISSIONING4 PSFEB project improved with glue resets included. CROC project improved with specs master resets included. SPD CB project improved with checks of registers. Configuration time is an issue on C-side (more than one minute). Bottomline: it’s robust. 1) RUNNING PRS AND SPD

S.MonteilPS/SPD COMMISSIONING5 1) RUNNING PRS AND SPD The hierarchy of the projects: TOP LEVEL : PRS : CONTAINS PRSDAQC AND PRSDAQA.

S.MonteilPS/SPD COMMISSIONING6 1) RUNNING PRS AND SPD The hierarchy of the projects: SECOND LEVEL : PRSDAQX1 : CONTAINS FOUR CRATES PRS_X, PRS_LEDTSB, PRS_TELL1. For the time being, PRS_LEDTSB is configured independently.

S.MonteilPS/SPD COMMISSIONING7 1) RUNNING PRS AND SPD The hierarchy of the projects: THIRD LEVEL 1 : PRS_TELL1 (See Tell1 tutorial). The trick : if a Tell1 board goes into error, RECONFIGURE. If at the fourth reconfiguration, it still fails : CALL the experts.

S.MonteilPS/SPD COMMISSIONING8 1) RUNNING PRS AND SPD The hierarchy of the projects: THIRD LEVEL 1 : PRS_X : Contains 1 CROC, 14 (8) PSFEB, 2 SPDCB.

S.MonteilPS/SPD COMMISSIONING9 2) Discriminating errors The Shift Leader job is to configure all the relevant electronics at the start of the run: SCENARIO 1 : Everything goes fine (shall be the dominant state). SCENARIO 2 : PRS felt in ERROR (shall occur). The first thing to do is to enter the ECS hierarchy and diagnose which element is on ERROR. CASE 1 : ALL 1/ Check the crate power supply (see appendix 0.0). 2/ Check the SpecsMaster. Restart/Reset (see appendix 2). 3/ Call Expert.

S.MonteilPS/SPD COMMISSIONING10 2) Discriminating errors CASE 2 : SPDCB 1/ ERROR : Check the VFE power supply status. 2/ STUCK into CONFIGURING : GO to FAKE_READY and state somewhere that the board is not configured. 3/ Anything else : call the expert. CASE 3 : PSFEB 1/ Check the log of the project (see Appendix 0). 2/ If it is a unique Delay_Chip, you’ll have to change through the Hardware Tool all the bits and then reconfigure from top (see Appendix 2). 3/ If all delay_chips, you have to launch a CAT project (see Appendix 3). 4/ Any other problem requires an expert. CASE 3 : CROC 1/ Check the SpecsMaster: Restart/Reset (see Appendix 1). 2/ If it fails, call the expert.

S.MonteilPS/SPD COMMISSIONING11 3) APPENDIX : The How To tricks Appendix 0.0 : Checking the power supply status. INFDAI project form the Calo PVSS shortcuts. See ECS tutorial. Stuck today. No printscreen. Address: /group/calo/pvss/INFDAI_UI_DEN Suppose it is stuck (as it is right now), you have an alternative solution: Go to /group/calo/spd/snmp And check the html interfaces MonitorPrsxxx.

S.MonteilPS/SPD COMMISSIONING12 3) APPENDIX : The How To tricks Appendix 0 : Checking the Log Viewer Once you have diagnosed where the configuration error occured in the ECS hierarchy, START PVSS on the relevant machine (see Twiki). Start the console ( see ECS tutorial). Start the Log Viewer ( each of the 2 latter operations is single click). Recover the error, reconfigure and get the faulty datapoint.

S.MonteilPS/SPD COMMISSIONING13 3) APPENDIX : The How To tricks Appendix 1 : Reset the SpecsMaster through the SpecClient Shortcut: Select the PC Select the Specs Master of the corresponding crate LHCbTwiki - LHCbCalo - LHCbECS Click on Reset Master (Hard).

S.MonteilPS/SPD COMMISSIONING14 3) APPENDIX : The How To tricks Appendix 2 : Changing one register in the Hw Tool (DelayChip example). 1. Open the HW tool 2. Select PSFEB 3. Goto Hardware 4. Select PSFEBxx 5. Select DelayChip_xx 6. Then View Recipe 7. Change the number: FFFFFF then Reconfigure form main panel. 9. If it fails, call …

S.MonteilPS/SPD COMMISSIONING15 3) APPENDIX : The How To tricks Appendix 3 : Launching a CAT process (DelayChip example). 1. Open a command window 2. Cdir : C:/Applications/CAT_ _CAT/CATLPC 3. Setup_controlroom.bat 4. Launch the CAT for the relevant crate goPRSx.bat 5. In the application window, select the process Shake FEB delays. 6. Execute it with the upper button. 7. Reconfigure form main panel.