1 April 27, 2011 Southeast Tornado Event System Operator Conference September 11-13 and September 25-27, 2012 Memphis, TN Rocky Williamson, SOS Chair Operations.

Slides:



Advertisements
Similar presentations
Spinning Reserve from Load Consideration of a Trial at Xcel Energys Cabin Creek Station Presentation to CMOPS January 7, 2005 John Kueck ORNL Brendan Kirby.
Advertisements

NERC Footnote b / 12 – Load Loss
Hurricanes Katrina & Rita: A Tale of Two Hospitals.
1 PER-005 Update Impact on Operators System Operator Conference April and May 1-3, 2012 Columbia, SC Margaret Stambach Manager, Training Services.
1 Reliability Coordination (IRO Standards) 2011 System Operator Conferences #3 and #4 September & 20-22, 2011 Nashville/Franklin TN Rocky Williamson.
Goshen Area Bus Reconfiguration
2013 Summer Overview Jeffrey S McDonald Power System Operator CUEA San Diego, CA June 6, 2013.
2014 System Operator Conference 1 Protection System Misoperations: Why Should a System Operator Give a Hoot? April 17 & May 1, 2014 – Charlotte, NC September.
Major Emergency Management - the Clare experience Gerard Dollard Director of Services CFOA Annual Conference 2010.
164 TORNADOS IN 24 HOURS IMPACT 7 SOUTHEASTERN STATES ALABAMA HIT BY EF5 STORM DEATH TOLL REACHES 290 WEDNESDAY, APRIL 27- THURSDAY, APRIL 28, 2011 Walter.
Dealing with Catastrophic Storm Issues January 2009 SE Missouri Ice Storm Missouri PSC Storm Workshop Presented by Dave Wakeman Manager, Distribution Operating.
System Operator Conference NERC Standards Review for: Simulator Drill Orientation 2014 System Operator Conferences Charlotte NC & Franklin TN SERC/SOS.
NERC Lessons Learned Summary March NERC lessons learned published in March 2015 Two NERC lessons learned (LL) were published in March2015 LL
System Operator Conference Simulator Drill Orientation 2014 System Operator Conferences Charlotte NC & Franklin TN SERC/SOS Facilitator Team.
Sight Word Phrases Group 2. saw a cat at home again.
5/17/2000Summer Preparedness /17/2000Summer Preparedness SRP SUMMER PREPAREDNESS 2000 Presented to the Arizona Corporation Commission May.
Electrical Power Distribution in America % Coal 20.4% Nuclear 20.3% Natural Gas 6% Hydro Electric 3.4% Other
DOE Energy/Water Interdependency TTX Steve Lewis Georgia Power Company April 25, 2007 “Electricity Systems Overview”
Applying the Distribution System in Grid Restoration/NERC CIP-014 Risk Assessment Srijib Mukherjee, Ph.D., P.E. UC Synergetic.
11 September 2015Electricity Merit Badge Class Jamboree1 Electricity Merit Badge Class 3 – Electric Power We Use Alternating Current (AC) Safety.
Who is Southern Company ? Regulated Utilities - Southeast Georgia Power Alabama Power Mississippi Power Gulf Power Savannah Electric & Power Southern.
Hurricane Rita. 2 ERCOT Preparation ERCOT started alerts to QSEs and TOs on 9/21 Did a site failover of EMMS system Austin Taylor Procured satellite voice.
PAR CONFERENCE Homeland Defense A Provider’s Perspective Lessons from TMI Dennis Felty November 15, 2001.
APPA RELIABILITY STANDARDS & COMPLIANCE SYMPOSIUM Case Study: City Utilities of Springfield, MO January 11, 2007.
Lecture 21Electro Mechanical System1  A major disturbance on a system(called contingency) creates a state of emergency and immediate steps must be taken.
Introduction Task Process Roles Resources Evaluation Conclusion Credits.
System Operation Training and System Restoration at Grant County PUD
Unit 1: Introduction and Course Overview. Student Introductions Please present your:  Name.  Organization.  Greatest need from this workshop.  Experience.
Black Sea Regional Transmission Planning Project By Predrag Mikša EKC - Electricity Coordinating Center Istanbul, March 2011.
Second Grade Sight Words. also am another away.
The Importance of Long Term Recovery Committees 11  Whole Community Response, Recovery, Mitigation, Preparedness  April 2013 Putting the pieces back.
2008 Summer Operating Expected Conditions Bulk Power Operations Power Coordination Center Bulk Power Operations Power Coordination Center.
Overview of Southern Company Transmission
An Overview of the U.S. Electric Power Grid Generation Choices, Reliability, Challenges Tom Ferguson, P.E. Adjunct Instructor Dept. of Electrical Engineering.
Bill Lewis, Compliance Team Lead NERC Reliability Working Group May 16, 2013 Texas RE Update Talk with Texas RE April 25, 2013.
KEEPING SAFE IN A STORM. BIG STORMS CAN BE SCARY. STRONG WINDS ARE LOUD. POUNDING RAIN FALLS. STORMS CAN CAUSE HARM.
Exercises and Advanced Exercises FRCC 2008 PRESENTED BY Bob Burkard, P.E. Rocky Sease, P.E. Systems Operations Success,
ACC Summer Preparedness Hearing Tucson Electric Power & UNS Electric March 22, 2007 Ed Beck Superintendent Transmission & Distribution Planning.
Dolch Word List Directions: This is the Dolch words list. They are 220 words that occur frequently in reading. Your child should be able to recognize.
Crisis Management Planning. FYI… Today – section 6 due Today – section 6 due Exam Thursday Exam Thursday Multiple Choice (29 ?’s) Multiple Choice (29.
Steady State Analysis Of A Microgrid Connected To A Power System
Loss of EMS Events 2015 System Operator Seminar. Training Objectives 2 System Operators will be able to identify the ERO Event Analysis Process Category.
2006 TRANSMISSION CUSTOMER FORUM September 21, 2006 Andrew J. Dearman, III Executive Vice President & Chief Transmission Officer.
Loss of EMS Events 2015 System Operator Seminar. Training Objectives 2 System Operators will be able to identify the ERO Event Analysis Process Category.
Operating Topics Part 2 Mike Oatts May 9, 2008 Transmission Customer Forum Destin, Florida Part 2 Mike Oatts May 9, 2008 Transmission Customer Forum Destin,
2015 HURRICANE SEASON PREPARATIONS March 18, 2015.
2006 Hurricane Preparedness June 5, 2006 Sumter Electric Cooperative, Inc R. Ben Brickhouse: Director of Engineering & IT John J. LaSelva: Director of.
FRCC System Restoration 2016 FRCC System Operator Seminar.
Oncor Transmission Service Provider Kenneth A. Donohoo Director – System Planning, Distribution and Transmission Oncor Electric Delivery Co LLC
Restoration Concepts PEAK RC Training Classification: Confidential Version No.: 1.5 Date of Document: Document Owner/Author: B Pederson Classification:
Chelsea Loomis, Regional Electric Transmission Planning.
Hurricane Lindahl 2016 System Operator Seminar. Hurricane Watch 2 The National Hurricane Center in Miami has issued a hurricane watch for the Southern.
Dolch Word List Directions: This is the Dolch words list. They are 220 words that occur frequently in reading. Your child should be able to recognize.
©2003 PJM 1 Presentation to: Maryland Public Service Commission May 16, 2003.
Impact of Hurricane Ike on CenterPoint Energy’s Transmission System Paul Rocha Director, Transmission Planning Presented at October 2, 2008 ERCOT TAC Meeting.
Access Prior Knowledge Lesson 3: What causes severe weather? Lesson 4: How are weather forecasts made? Opening Activity Open Science textbook to page 238.
Blackstart Hugh Francis Southern Company Transmission Customer Forum September 22, 2006 Hugh Francis Southern Company Transmission Customer Forum September.
Fry Phrases Level 2.
NERC Lessons Learned Summary
Utility Needs and Smart Grid for Major Storm Events
Impact of Hurricane Ike on
Hurricane Rita.
“FRCC RESTORATION PLAN (BLACKOUT & BLACK START)” - TRAINING -
Ensuring Security of Supply in Estonian Transmission Grid
Determination of harmonic emission: problem of higher frequencies
Pacific Power Seismic Preparedness Update
TVA RC 2017 Summer Outlook TVA RC July 27, 2017.
WECC Annual Meeting 9/11/2018 Cameron Warren
WECC Annual Meeting 9/11/2018 Cameron Warren
Presentation transcript:

1 April 27, 2011 Southeast Tornado Event System Operator Conference September and September 25-27, 2012 Memphis, TN Rocky Williamson, SOS Chair Operations Training Manager Southern Company Services - Transmission

2012 System Operator Conference 2 Learning Objectives At the conclusion of this training session, you will be able to: Identify the RC’s four tools for implementing control actions in an emergency condition Evaluate the unique circumstances the April 2011 Tornado Event offered Recognize the importance of working with neighbors and planning for contingencies Describe the value of Blackstart plans and emergency drills

2012 System Operator Conference 3 Outline of Topics RC toolbox – control actions Magnitude of storms SOCO Storm Report SOCO Damage Report Impacts to interfaces, generation Restoration/ Restoration support Lessons learned from April Tornado Event

2012 System Operator Conference 4 PLAY: TVA VIDEO: STORM_4_27_2011

2012 System Operator Conference 5 RC Toolbox – Control Actions Redispatch generation Reconfigure transmission system Adjust interfaces Shed load

2012 System Operator Conference 6 Please stand if: You worked on April 27, 2011

2012 System Operator Conference 7 You worked on April 27, 2011 You worked on the Restoration Please stand if:

2012 System Operator Conference 8 You worked on April 27, 2011 You worked on the Restoration You were directly affected by storm damage Please stand if:

2012 System Operator Conference 9 You worked on April 27, 2011 You worked on the Restoration You were directly affected by storm damage You know someone who was affected by the storm Please stand if:

2012 System Operator Conference 10 Magnitude of Storm

2012 System Operator Conference 11 Tornadoes are Red

2012 System Operator Conference 12 SERC Southeastern Subregion

2012 System Operator Conference 13 If You Build It, “Mother Nature” Will Tear It Down Normal storm damage Magnitude of this storm system  Greatest number of tornadoes in a single event  More tornadoes hit Alabama on April 27, 2011 than any year recorded  Yes, I said any year recorded!

2012 System Operator Conference 14 SOCO Storm Report Start April 27 at 5:05 a.m. – 12:25 a.m.19 hours Tornadoes in SOCO69 Tornadoes in Alabama 62 Associated with this storm system211 There was a morning set of storms Around 16:00 a second burst of storms emerged Most of the damage occurred in two short-time bursts

2012 System Operator Conference 15 Damage Report DamageSOCO TVA Transmission structures Transmission lines out Substation major damage8 Substations out318 Customers out of power426,640850,000 Generation sites effected1312 Load lost MW1500

2012 System Operator Conference 16 Interface (Tie-Line) Impacts Tie-line - a circuit connecting two Balancing Authority (BA) areas There are 13 TVA/SOCO ties After the second wave of storms 4 reading with semi-normal readings 7 radial into or out of SOCO

2012 System Operator Conference 17 Generation Impacts Operating generation with very limited, or no, transmission TVA’s Browns Ferry Gorgas – Miller Smith Dam Carters – Rocky

2012 System Operator Conference 18 Lack of Transmission to Nuclear Plants TVA’s Browns Ferry Nuclear Plant 7 of kVlines lost 1 of 2161 kV lines lost Only Athens 161 was line left in service All three units forced off2500 MW This was done safely!

2012 System Operator Conference 19 Browns Ferry

2012 System Operator Conference 20 Lack of Transmission to Coal Plants Gorgas and Miller3600 MW radial 3 of 4500 kV Miller-Clay 8 7 of 8230 kV Gorgas-Miller 6 #1 tie 3 of 3161 kV 8 of 9115 kV Tuscaloosa radial Georgia also lost lines out of several plants

2012 System Operator Conference 21 Gorgas - Miller

2012 System Operator Conference 22 Redispatch generation Reconfigure transmission system Adjust interfaces Shed load RC Toolbox – Control Actions

2012 System Operator Conference 23 Lack of Transmission to Hydro Plants Smith Dam 78 MW 2 of 2161 kV lines lost 1 of 1115 kV lines lost No transmission left in service No wire - no water Blackstart capability did not help

2012 System Operator Conference 24 Smith Dam

2012 System Operator Conference 25 Smith Dam

2012 System Operator Conference 26 Redispatch generation Reconfigure transmission system Adjust interfaces Shed load RC Toolbox – Control Actions

2012 System Operator Conference 27 Carters and Rocky 15 tornados in Georgia 83,000 customers out 11 – 115 kV lines out 7 – 230 kV lines out Carter’s 500 MW and Rocky 1000 MW were restricted in generation and pumping until lines were restored

2012 System Operator Conference 28 Limited Transmission to Load Serving load with limited transmission to Tuscaloosa 3 of kV lines lost 5 of 6115 kV lines lost The Gorgas-Yacht Club 3 was still in service

2012 System Operator Conference 29 Tuscaloosa

2012 System Operator Conference 30 Redispatch generation Reconfigure transmission system Adjust interfaces Shed load RC Toolbox – Control Actions

2012 System Operator Conference 31

2012 System Operator Conference 32 Tuscaloosa Picking up load too fast Holding NUCOR Steel off line (300 MW arc furnace)

2012 System Operator Conference 33 Bottoming Out 21:00 Loss of load due to storm damage We put everything to bed that we could Georgia was hesitant to release normally cycled units Cat II and Cat III on many units Request fleet to sell/give away 500 MW Georgia finally released units At the point of issuing a directive

2012 System Operator Conference 34 SOCO 500 kV and 230 kV System

2012 System Operator Conference 35 Quiz

2012 System Operator Conference 36 Restoration Support

2012 System Operator Conference 37 Lessons Learned Practice drills need to be broadened Mutual assistance – great stuff when you need it Tools can lie to you! Use an “experience filter” Double-staff the control center, day and night Place operators with knowledge of the damaged area on that desk

2012 System Operator Conference 38 Summary Make contingency plans; they are a great help Black start and emergency drills pay off big Get help coming Timely and accurate damage reports, set priorities Learn and make changes Coordination with neighbors, during and after the storm was a great benefit Mutual assistance, don’t leave home without it!

2012 System Operator Conference 39 PLAY VIDEO: APRIL_FURY_APCO

2012 System Operator Conference 40 Questions?