Installation: the plan
Reality
Pressure dome: the problem
The Rack, Mark I
Scan Head, in place, finally
Pressure Vessel “Doghouse” Equipment Racks - Cable Run 6 144Z AMS Configuration
AMS Mosaic 3/1/13 7 Magna, UT Kennecott Smelter
Kennecott Stack 3/1/13 8 Kennecott Stack
West Valley City, UT 3/1/13 DRAFT9 RSAC
AirCell Issues Leaver Arm Measurements for Applinix Installed electronics into IPM box Integrate IPM and conduct ground tests Reconfigure AirCell for static IP and reset router Connect IPM to AirCell and AMS Test Ground Processing Software Connection
Wasatch Front 3/29/ ,5,3 7.6m
Wasatch Front 3/29/13
Utah Lake 3/29/13 Imagery will be evaluated by USGS for hot spring monitoring project
Questions