September 28, 2006-Cornell (Zisman/Mattison) Global Design Effort 1 DR Kicker R&D: Goals and Work Scope Michael S. Zisman and Tom Mattison.

Slides:



Advertisements
Similar presentations
LC-ABD2 Work Package 2: Damping Rings Andy Wolski University of Liverpool and the Cockcroft Institute 12 April 2007.
Advertisements

February 7, 2007-Beijing (Zisman-DR) Global Design Effort 1 Damping Ring EDR Plans Michael S. Zisman, Jie Gao, Susanna Guiducci, Andy Wolski DR Area System.
BILCW07 - Feb 2007 Global Design Effort 1 RDB S3: Damping Rings R&D Junji Urakawa for Andrzej Wolski (Cockcroft Institute), Susanna Guiducci (INFN-LNF),
Global Design Effort 1 Summary of Technical and Collaboration Related Issues for the ILC Damping Rings N. Walker (for the Project Managers) INFN Frascati.
SuperB and the ILC Damping Rings Andy Wolski University of Liverpool/Cockcroft Institute 27 April, 2006.
NLC - The Next Linear Collider Project Keith Jobe May 1999 Damping Ring Kicker Development.
Overview of ILC Plans D.Rubin April 17, D. Rubin2 ILC R&D Activities and Plans 1.Positron Source 2.Damping Ring 3.Low Emittance Transport - damping.
CLIC Kickers: Status and activities for 2013 in view of the budget discussions for 2013 CTC #65 M.J. Barnes CLIC Technical Committee, November M.J.
Stripline Kicker Project LBL LLNL SLAC KEK DESY. Damping Ring Injection / Extraction Kicker Magnet 1)The TDR Kicker: 1)0.6 mrad (.01Tm), 5GeV, 50 m β,
Towards a Coordinated R&D Plan for ILC Damping Rings Impedance Issues Andy Wolski University of Liverpool and the Cockcroft Institute 28 September, 2006.
STRIPLINE KICKER STATUS. PRESENTATION OUTLINE 1.Design of a stripline kicker for beam injection in DAFNE storage rings. 2.HV tests and RF measurements.
A fast RF kicker for the MEIC electron cooler Andrew Kimber Amy Sy 31 st March 2015 Thomas Jefferson National Accelerator Facility is managed by Jefferson.
ILC Damping Rings R&D Meeting: Cornell, September 2006 Andy Wolski University of Liverpool and the Cockcroft Institute 26 September, 2006.
KICKER LNF David Alesini LNF fast kickers study group* * D. Alesini, F. Marcellini P. Raimondi, S. Guiducci.
Plans for injection/extraction R&D S. Guiducci INFN-LNF KEK - ILCDR07, Dec 207.
1 Plans for KEK/ATF 1. Introduction 2. Related Instrumentations at ATF 3. Experimental Plans for Fast Kicker R&D at ATF Junji Urakawa (KEK) at ILC Damping.
Report on the Damping Ring Meeting at CERN, Nov , 2005 J. Gao IHEP, Beijing, China Nov. 24, 2005, ILC-Asia Meeting.
March 7, 2007 LET Issues (Cai/Kubo/Zisman) Global Design Effort 1 Low-Emittance Tuning Issues and Plans Yunhai Cai, Kiyoshi Kubo and Michael S. Zisman.
8/28/07RTML EDR KOM1 Cornell Plans for RTML EDR Work G. Dugan Cornell LEPP.
Status of Fast Pulser and Kicker Work at UIUC and Cornell Robert Meller Cornell University Laboratory for Elementary-Particle Physics.
Ultra-Fast Damping Ring Kicker Modulator Development at SLAC Status update for ILC2010 C. Burkhart, A. Krasnykh, R. Larsen, & T. Tang March 27, 2010.
ILC Damping Ring Kickers Presenter: Josef Frisch Dec 7, 2004.
Summary of WG1 K. Kubo, D. Schulte, P. Tenenbaum.
FAST KICKER STATUS Fabio Marcellini On behalf of LNF fast kickers study group* * D. Alesini, F. Marcellini P. Raimondi, S. Guiducci.
Operations, Test facilities, CF&S Tom Himel SLAC.
Project Management Mark Palmer Cornell Laboratory for Accelerator-Based Sciences and Education.
8 th Meeting of the ATF TB/SGC 11 June Hardware Status Fast Kicker – FID pulsers have had a reliability problem: this appears to have been solved.
ILC Program discussion M. Ross Damping Ring Injection / Extraction Kicker Magnet 1)The TDR Kicker: 1)0.6 mrad (.01Tm), 5GeV, 50 m β, 7e-4 stability,
Damping Ring S. Guiducci AAP Review Tsukuba 20 April 2009.
I PhysicsP I llinois George Gollin, Damping ring kickers, SLAC ILC-America, October Damping ring kickers George.
Global design effort DOE meeting 8/10/06 Global design effort Americas 1 FY07 DOE ILC Budget recommendations G. Dugan ILC-GDE/Cornell University GDE Americas.
Meeting of the European Global Design Effort Report from INFN non EU-funded R&D Carlo Pagani University of Milano and INFN DESY, 10 May 2006.
E-cloud studies at LNF T. Demma INFN-LNF. Plan of talk Introduction New feedback system to suppress horizontal coupled-bunch instability. Preliminary.
13 September 2006 Global Design Effort 1 ML (x.7) Goals and Scope of Work to end FY09 Nikolay Solyak Fermilab Peter Tenenbaum SLAC.
Status of ATF Fast Kicker Experiment
Bunch Separation with RF Deflectors D. Rubin,R.Helms Cornell University.
Global Design Effort: Controls & LLRF Americas Region Team WBS x.2 Global Systems Program Overview for FY08/09.
General remarks: I am impressed with the quantity and quality of the work presented here and the functioning of the organization. I thank ILC and FNAL.
Task Lists of ATF2 commissioning Toshiyuki Okugi ATF2 Project Meeting 12 / 17 / 2008.
ATF2: Summary of Scheduling Strategy Session Grahame Blair Feedback and Feedforward systems Fast Kicker for ILC bunch train structure Laser-wire Shintake.
ILC R&D at KEK Beam Control Technology –ATF –ATF2 Acceleration Technology –High-gradient Cavities L-band R&D Stand –Linac System  STF –Construction of.
Plan for Beam Extraction using strip-line kicker with pulse bump orbit Present extraction kicker system Strip-line kicker system for ILC Beam extraction.
1 Fast kicker study Machine Time 2011/10/18~10/29(2 weeks) TB meeting 2011/01/14 T.Naito.
Simulations - Beam dynamics in low emittance transport (LET: From the exit of Damping Ring) K. Kubo
Injection/extraction R&D Summary S. Guiducci (INFN), Thomas Mattison (UBC) KEK - ILCDR07, Dec 207.
Japan-US Collaboration /3/7 Japan-US Collaboration /3/7 Fast kicker development The beam extraction design from DR to the extraction line and.
Damping Ring Session Summary S. Guiducci TILC09 Tsukuba 21 April 2009.
Non-EC R&D KEK Junji Urakawa at INFN. Discussing issues : 1. Experimental confirmation for the threshold of Fast ion instability Need clear data.
UPDATE ON KICKERS LNF David Alesini for the LNF fast kickers study group* * D. Alesini, F. Marcellini P. Raimondi, S. Guiducci.
TBL experimental program Status and Results  Introduction  Status  Experimental program for 2010 and beyond  Outlook ACE, Steffen Döbert.
Global Design Effort ILC Damping Rings: R&D Plan and Organisation in the Technical Design Phase Andy Wolski University of Liverpool and the Cockcroft Institute,
1 Experiments with pulse supplies and strip-lines at ATF, Plans for fast extraction kicker for ATF2 1. Fast Kicker R&D at ATF 2. Instrumentation at ATF.
Damping Ring Injection and Extraction Damping Ring EDR Kickoff Meeting Daresbury UK 5-7 November 2007 Thomas Mattison University of British Columbia.
ILC R&D Activities at KEK Superconducting Linac Development Beam-handling Technology Development.
1 AS TAG Leaders Meeting Webex - Friday S. Guiducci, M. Palmer.
DR Kicker R&D: Goals and Work Scope
Oversea collaborators
Status and Plan of GDE Design Work (Including Road Map for RDR)
Fast Kicker R&D in the Americas Region
George Gollin University of Illinois at Urbana-Champaign and
Junji Urakawa (KEK) for ATF International Collaboration
Conclusions of LCWS08 & ILC08, Chicago, November ‘08
Bunch Separation with RF Deflectors
Damping Ring Kicker Tests at AØ
Strip-line Kicker R&D at KEK-ATF
ATF Fast Kicker R&D at LBNL ILCDR06, Cornell University
Fast Kicker R&D at ATF T.Naito(KEK) TILC09 18/April/ /11/27.
CLIC DR EXTRACTION KICKER DESIGN, MANUFACTURE AND EXPERIMENTAL PROGRAM
Fourier Series Pulse Compression Damping Ring Kicker
Pulser Tests at the A0PI Mark Palmer and Bob Meller Cornell University
Presentation transcript:

September 28, 2006-Cornell (Zisman/Mattison) Global Design Effort 1 DR Kicker R&D: Goals and Work Scope Michael S. Zisman and Tom Mattison

September 28, 2006-Cornell (Zisman/Mattison) Global Design Effort 2 Caveats This is the first pass, not the final story Proposed activities not (yet) based on funding realities The global DR R&D effort will be defined and assessed by the S3 task force All WPs except last 2 have “very high priority”

September 28, 2006-Cornell (Zisman/Mattison) Global Design Effort 3 R&D Goals Specify component performance parameters –rise time, fall time, tolerances can any be relaxed to make the system more robust or cheaper? –acceptable impedance, vacuum properties, ECI issues Demonstrate one or more technologies that meet specs –bench tests of pulser short-term, long term, abuse-tolerance verify burst mode operation –bench tests of kicker structure –bench tests of pulser+structure+load system –beam tests of pulser+kicker+load+controls system measure system pulse shape (can be single-pulse, should be high- resolution) verify beam interaction properties (ideally in realistic ring) –emittance preservation

September 28, 2006-Cornell (Zisman/Mattison) Global Design Effort 4 Institutions Involved U.S. –Cornell, FNAL, LBNL, LLNL, SLAC, UIUC Japan –KEK Europe –INFN-LNF It would be good to involve other groups in this “very high priority” effort

September 28, 2006-Cornell (Zisman/Mattison) Global Design Effort 5 Work Packages (1) Inductive Adder FET Pulser –Cook, Burkhart, Cassel, Krasnykh, Larson, Ross, Naito Plans: –FY07: Modulator prototype development –FY08: Modulator prototype testing; HA element design –FY09: High Availability testing Comments –beam testing planned in context of ATF2 program –need to improve intrinsic rise time before High Availability becomes the main issue

September 28, 2006-Cornell (Zisman/Mattison) Global Design Effort 6 Work Packages (2) Drift Step Recovery Diode Pulsers –Krasnykh, Burkhart, Gollin, Meller, Urakawa, De Santis, ?? Plans: –FY07 continued testing of commercial (FID GmbH) limited voltage and rep- rate devices (bench, beam) pulser development (SLAC + SBIR) –FY08 DSRD as pulse-sharpener for other pulsers Comments –existing “FID” tests seem to have been DSRD pulsers! –concerns about robustness –single-source issues SLAC+SBIR effort helps address that

September 28, 2006-Cornell (Zisman/Mattison) Global Design Effort 7 Work Packages (3) Collaborate with FID GmbH –?? Plans –FY07 determine switching technology used in what we have tested test pulsers with real FID used as final switching element understand proposal for high-voltage, high rep-rate pulser –switching technology –other technical issues being addressed –level of information sharing decide how to proceed –FY08 proceed

September 28, 2006-Cornell (Zisman/Mattison) Global Design Effort 8 Work Packages (4) Stripline structures Plans –FY07 EM simulations (field uniformity, matching, tapers, fins, etc) –De Santis, Krasnykh, LNF, ?? feedthrough development (matching, voltage, manufacturing) –Krasnykh, LNF, ?? structure fabrication –LNF for DAΦNE (already done for ATF2) structure bench tests –could be done with beam test structure –FY08 structure tests with beam –DAΦNE, ATF2

September 28, 2006-Cornell (Zisman/Mattison) Global Design Effort 9 Work Packages (4) cont’d Comments –systematic studies of kicker structure and feed- through design need to be expedited –need to look for trapped modes in structure with computer codes with wire measurements (LBNL?) develop damping methods for structure if needed

September 28, 2006-Cornell (Zisman/Mattison) Global Design Effort 10 Work Packages (5) Beam Tests at Fermilab A0 –Gollin, Meller, Edwards, ?? Plans: –FY07 continue tests with FID pulser: time & amplitude stability, reliability systematics of time measurements kicker measurement sensitivity to AØ beam stability –FY08 investigate possibility of tests with other pulser technologies investigate AØ reconfiguration: redundant measurements; two phase detectors; better BPMs; lower fringe field magnets –FY09 reconfigure AØ for measurements of realistic system

September 28, 2006-Cornell (Zisman/Mattison) Global Design Effort 11 Work Packages (6) Beam tests at ATF –Urakawa, DeSantis, Meller Plans: –FY07 improve instrumentation for kicker tests –bpms; laser wire emittance measurements; DAQ retest system with multiple bunches –plan to complete test program during 2007 may preclude tests of other candidate systems Comments –most realistic test under “combat” conditions

September 28, 2006-Cornell (Zisman/Mattison) Global Design Effort 12 Work Packages (7) Beam tests at DAΦNE –Alesini, Guiducci, Marcellini, Raimondi, DeSantis Plans: –FY07 Feedthru development, stripline fabrication, bench tests –FY08 Install and operate in DAΦNE production running –FY09 test with alternative pulser systems ?

September 28, 2006-Cornell (Zisman/Mattison) Global Design Effort 13 Work Packages (8) Examination of other pulser technologies –Mattison, ?? Plans: –FY07 bench-test ferrite shockline with (FET?) pulser explore other technologies to see if any have promise in terms of performance, cost, reliability, tech transfer –FY08 develop and bench test other systems if promising candidate identified –FY09 test with beam? Comments –ferrite shock lines, avalanche transistors, hard tube pulsers are candidate technologies identified to date

September 28, 2006-Cornell (Zisman/Mattison) Global Design Effort 14 Work Packages (9) Outside the box –Gollen, Meller, Willeke, Wolski, Rubin, ?? Possibilities –Fourier transform scheme –RF separator for kicker-septum region –off-axis injection with slow kickers for electrons –big slow bump and small fast kick for electron extraction

September 28, 2006-Cornell (Zisman/Mattison) Global Design Effort 15 Summary We have begun task of planning and prioritizing DR R&D kicker program for the TDR phase Still lots to do –develop priority list reconciled with RDB priorities –develop effort and M&S requirements much of this exists already at least partially –develop critical milestone list based on assumption that required resources will be provided indicate what key questions will be answered each year and why they are important Costs matter: should we focus on least expensive technology?