Spacerack Storage Centre (Australia) Pty. Ltd. A.C.N. 107165257 Distributors of Spacerack Storage Systems Selective Pallet Racking The principle behind.

Slides:



Advertisements
Similar presentations
Safety Absolutes Green Lake
Advertisements

Framing.
Work Improvement in Small Enterprises (WISE): good examples from Asia [CD-ROM] [Publications] Compilation of PowerPoint presentations on: 1) Work station.
The Ten Principles of Material Handling
Lightweight Forming System and Roofs for Concrete Floors.
Erecting steel structures Setting up or dismantling cranes or hoists
WAREHOUSING MANAGEMENT
WAREHOUSING MANAGEMENT
Safe use of Tools and Equipment at Height Guidance Richie Adams Egyptian Drilling Company.
 1  Outline  putaway  pallet storage and retrieval  case retrieval  project.
GRP Service Riser Systems PULTRUDED STRUCTURAL PROFILE SUPPORTS WITH GRP MOULDED ANTI SLIP GRATING FOR OPEN RISERS AND CUT OUTS FOR SERVICES.
NCSX Machine Platform FDR June 15, 2005 Erik D. Perry.
© Easy Guides Australia a work platform consisting of a work basket (platform), lifting mechanism and chassis that can raise and lower people and materials.
Subpart R Steel Erection
Concrete Pre Cast Panel By Peter Spence ID:
Stairways and Ladders 1926 Subpart X - Stairways and Ladders
ArcelorMittal Technotron s.r.o. Expanded Metal – Fliers and Framings November 2008.
OSHA Office of Training & Education
OSHAX.org - The Unofficial Guide to the OSHA1 Stairways and Ladders.
Stairways and Ladders.
1 Telecom Cabling Ladder safety. 2 OSHA Office of Training & Education ation Telecom Cabling Stairways and Ladders.
LADDER & STAIRWAY SAFETY
Safety for Working in High Places
Suntraders Company Ltd. / Anthony Kent Gibbons Industrial Park, Christ Church, Barbados BB17101 (246) Fax: (246)
NGfL CYMRU GCaD ACCESS EQUIPMENT.
Material Handling Material handling is the function of moving the right material to the right place in the right time, in the right amount, in sequence,
Appendices Subpart R Steel Erection
Introduction The Gamma Bracing System  Gamma bracing system is a light weight steel, structural truss bracing frame that fits INSIDE the timber studs.
IM MATERIAL HANDLING. Material Handling Material handling is the function of moving the right material to the right place in the right time, in the right.
1 Inventory Control: Part 4 – Physical Inventory.
2011 NPMA Conference Series III National Capital Area Conference Leaders in Asset Management National Capitol Area Conference Charles L. Robinson, Director.
2.5.5 Student Book © 2004 Propane Education & Research CouncilPage Coordinating Loading and Unloading of ASME Tanks Using Contractor- Operated.
Occupational Safety and Health Course for Healthcare Professionals.
Falls From Height. Identifying fall hazards Falls are a major cause of workplace fatalities and serious injuries. There are many jobs that require people.
Accident Prevention Manual for Business & Industry: Engineering & Technology 13th edition National Safety Council Compiled by Dr. S.D. Allen Iske, Associate.
COEN STEEL LEADING THE WAY IN GRATING SOLUTIONS FORGED WELDED GRATING | PRESSURE LOCKED GRATING | GRP | PERFORATED METAL PLANKS.
ILC TRANSPORT AND INSTALLATION Questions from last CES: Beam height explanation, Transport implications of sloping access tunnels proposed for access to.
The Unique Scaffold Trailer Pack From Molecular Scaffold Sales.
MH...CH LECT-021 SYSTEMS CONCEPT Adopting a materials handling systems from overall optimization point of view. Adopting a materials handling systems.
PRODUCTION MANAGEMENT SOFTWARE. WHICH DO YOU PREFER? 2.
Complete Storage System Provider Racking system Shelving system Ou Efos Resources No Kompleks Sri Sungai Nibong Jalan Sultan Azlan Shah
BB W Roof Purlins BB W Z Purlins BB W Eaves Beams BB W Side Rails MM ezzanine Flooring Systems SS teel Framing Systems OO ff Site Building.
Unit 3 Storage This unit is designed to give you an introduction to the concept of storage as it relates to the logistical handling of materials. Well-planned.
Warehouse Safety Is This You????.
Powered Industrial Trucks: Forklifts—Overhead Transparencies © 1998 Comprehensive Loss Management, Inc. 1 Powered Industrial Trucks.
OSHA Office of Training & Education
Material handling. Haynes defines “Material handling embraces the basic operations in connection with the movement of bulk, packaged and individual products.
Preventing Pallet Racking Systems From Collapsing
Constraints Space Load Capacity Costs Operating hours.
Ryan Thurston | Duncan McLennan
Staircase Civil Engineering Drawing Department of Civil Engineering
Storage and Warehousing Techniques
OH&S Plant Obligations make
Safe Rigging Practices
Warehouses Redesign to Al-Zalmout Distribution Co.
Warehousing - A Quick Overview
Things You Should Know About Cantilever Rack
What Types of Pallet Racks are Mostly Adopted by the Business?
Basic Factors you need to Consider Before Investing in Pallet Racking system.
Things to Keep in Mind While Installing Cantilever Racks.
Way to Setup the Racks in your Warehouse
Robin Holdsworth - City of Canning
GM Dealer Equipment Program
STRUCTURAL TIMBER FRAMING
Warehouse design in A.R. Alhijjawi and Sons Company
NATIONAL LEADER IN TESTING, INSPECTION AND CERTIFICATION
ACCESS EQUIPMENT.
Introduction The Gamma Bracing System
British Woodworking Federation
Introduction The Gamma Bracing System
Presentation transcript:

Spacerack Storage Centre (Australia) Pty. Ltd. A.C.N Distributors of Spacerack Storage Systems Selective Pallet Racking The principle behind all racking systems is to maximise the use of cubic capacity within a storage area.

There are many conditions to consider when designing your storage systems – Height limitations of the building. Lifting equipment & weights involved. Type and size of pallets or packaging. Inventory control & speed of operation. And many other aspects which mean the difference between an efficient and economical operation on one hand, or a costly drain on profits on the other. SPACERACK products are designed and manufactured to exceed the following Australian standards: AS Steel Storage Racking AS Cold-formed Steel Structures Code AS Steel Structures Code AS1170 – Structural Design Actions AS1657 – Fixed Platforms Internationally, SPACERACK can also meet the high standards of: Rack Manufactures Institute (USA) SEMA Code (United Kingdom) Federation Européenne de la Manutention (FEM) The success of any storage or pallet racking system lies in the full understanding of the business and its storage/retrieval problems, then translating that into a design that meets the customers needs and maximises use of available storage and space. With a Computer Assisted Design (CAD) facility, Spacerack ensures a speedy and accurate illustration of the proposed system layout and controlled manufacturing conditions deliver engineering excellence without compromise.

Standard Selective Racking Sizes This table shows the full length of racks from 1 to 20 bays in both 2600mm & 2750mm Clear Entry bays. The half bays are calculated using a single pallet beam of 1380mm. Standard Sizes of beams kept in stock are: 1380mm x 100mm x 50mm x 2.0mm (SWL 4551kg) 1380mm x 75mm 50mm x 2.0mm (SWL 3004kg) 2600mm x 100mm x 50mm x 2.0mm (SWL 2387kg) 2600mm x 75mm x 50mm x 2.0mm (SWL 1175kg) 2750mm x 100mm x 50mm x 2.0mm (SWL 2130kg) 2750mm x 75mm x 50mm x 2.0mm (SWL 1047kg) Many other sizes available on lead times of approx. 10 working days

Components 1. RHS Beam Section. 2. Std. Post(88mm) & 3mm Foot plate. 3. Std. Post & 5mm Bracket Foot plate. 4. BFS Post (118mm) 5. Column Guard – Corner post. 6. Column Guard – Angle type. 7. Column Guard – ‘Protect-it’ type. 8. End Barrier. 9. Particleboard Support. 10. Fork Clearance Bars. 11. Upright rack Dividers. 12. Mesh Decks. 13. Safe Working Load Sign. 14. Drive In Load Sign. 15. AirSpace Load Sign.

AirSpace Platforms Formally known as Raised Storage Areas, these platforms can be designed & built using either Selective Racking or Longspan Shelving as the base structure. As the platform is free standing (as apposed to Mezzanine floors where the structure is fixed to the walls) the need for Council approval is negated. Airspace platforms can be built over existing racking or shelving to maximize the cubic space available. All Spacerack AirSpace platforms conform with the Australian/New Zealand Standard for Fixed Platforms AS/NZS & Structural Design Actions – General Principles AS/NZS & Structural Design Actions – Permanent, imposed & other actions AS/NZS Designs can be either be open plan or shelving underneath, can be built over existing structures such as office/toilet blocks, can be an open space or have more Shelving/Racking on the platform floor. Platforms can incorporate specially designed Stairs, Ramps, Access gates together with Handrailing & Kickboards. Floors can be built using Plywood or Particleboard Tongue & Groove flooring fixed to Steel Purlins or Bar Grating. Large spans between uprights are accommodated up to 6.00 metres. Floor heights can range from 2.00 to 5.00 metres. Floor Ratings can range from 300kg/m2 to 1000kg/m2 using timber flooring and above 1000kg/m2 using Bar Grating. A great way to increase your Storage area without moving premises. Minimal disruption to your business during installation makes this the inexpensive & easy way to double your floor space.

865 Princes Highway, Springvale, Vic Telephone: (03) Fax: (03) Our Services Free Measure & Quotation We offer a free measure & quotation service, from one bay to a full warehouse. Our Sales team will make an appointment to visit your work site to measure & assess your requirements, to best utilize the space available and to help you make the right decision about the configuration & design of your storage systems. Installation All our Selective Racking installations comply with the Australian Standard AS 4084 – All relevant safety procedures are observed whilst installing. Safety Audits Keeping your Spacerack installation in good working condition is essential for safe operation & a long life. A Safety audit is a good way to keep your racking safe & complying with Australian Standards. A qualified Engineer can be booked to visit your work site to inspect, compile a report & make recommendations to improve/repair your racking. On completion of repairs/alterations a compliance certificate is issued. Relocate, Reconfigure or Upgrade Business can change. So can your storage requirements. We can offer to help you relocate to a new premises, redesign & reconfigure to suit your changing needs or upgrade your existing racking. Safety Products Protect your investment with our Safety products. Preventing accidents is a very difficult task. So to ensure safety in the work place why not consider protecting your racking from forklift & pallet impact damage with our range of protection devices.