LBNE Reconfiguration Jim Strait, LBNE Project Director Fermilab Community Advisory Board August 23, 2012.

Slides:



Advertisements
Similar presentations
Parks & Recreation Department
Advertisements

Industry Meeting with EPA ORD November 18, 2009.
Community Partners Meeting June 27, Agenda 1.Project Update (30 mins) 2.Input on Creating Community-School Partnerships (45 mins) 3.Q&A (15 mins)
S. UC Irvine August U.S. LArTPC Detector Activities Scott Menary The International Scoping Study Meeting of Neutrino Factory and Super-beam.
Towards a Future Long-Baseline Neutrino Experiment Bob Wilson Colorado State University CERN Prototype/Beam Test Meeting CERN, 20 October 2014.
NuMI Offaxis Costs and Whither Next Stanley Wojcicki Stanford University Cambridge Offaxis workshop January 12, 2004.
TIME LINE SCHEDULLE. TIME SCHEDULLE 2012 JanFebMarAprMayJunJulAugustSeptOct Prep. Meeting 1 ExCom Meeting Obtain Information TOR Drafting 1st Annouchment.
Long-Baseline Neutrino Experiment James Strait LBNE Project Director Public Information Meeting May 23, 2013 LBNE-doc-7321.
LBNE Status 1 Jim Strait, Fermilab LBNE Project Director 2 nd ESSnuSB Open Meeting May 2014 LBNE-doc-9102.
CERN LBNE Test Experiment. Plan view of Bat
LBNE Reconfiguration Workshop – April 2012 FD Assumptions and Cost Estimate 1 Bruce Baller.
LBNE Procurement Overview Elaine McCluskey, LBNE Project Engineer Director’s Review of Project Procurement Support 8-9 August 2012.
Progress with the Off-axis Experiment LoI and PAC Response Ongoing detectors R&D Simulation efforts Sites UCL meeting Next steps.
LISD Board of Trustees Construction Committee Meeting Tuesday, December 11, 2001.
NSDI Strategic Plan Overview NSDI Leaders Forum Meeting March 7, 2013.
American Neutrino Strategy: Consequences of P5 Report Jim Strait, LBNE Project Director NuFact August 2014.
Middle States Accreditation – update at Town Hall, 2/19/2014 Middle States Accreditation: Update at Town Hall Meeting February 19, 2014.
BEAUFORT COUNTY INSPECTION AND CODE ENFORCEMENT DEPARTMENT INTERNATIONAL ACCREDITATION SERVICE.
P5 and the HEP Program A. Seiden Fermilab June 2, 2003.
Executive Session Director’s CD-1 Review of the LBNE Project September 25, 2012 Jim Yeck.
Cost and Engineering Working Group Introduction Jim Strait Fermilab LBNE Project Manager Deputy Chair, Cost and Engineering Working Group LBNE Reconfiguration.
Fermilab Neutrino Program Jim Strait Neutrino Discussion at CERN 26 November 2013.
1 James White 11 March JLTP3 Update Final draft approved by four councils Publication March 2011 One Year Interim Delivery Plan 2011/12 Autumn.
Phase I Engineering and Environmental Studies Project Development Flowchart US Route 45; IL Route 132 to IL Route 173 and Millburn Bypass CSS
OPERATIONS STEERING COMMITTEE Communications Team Kick-Off Meeting
LAr1 Plans at FNAL Bruce Baller - Fermilab. Outline LAGUNA Meeting - Mar  LBNE LAr detector overview  Prototyping plan  1 kton prototype.
NSDI Strategic Plan Update National Geospatial Advisory Committee Meeting December 11, 2013.
News Y2K June 25, Summary of June 12 Face-to-Face Meeting.
This is an example text TIMELINE PROJECT PLANNING DecOctSepAugJulyJuneAprilMarchFebJanMayNov 12 Months Example text Go ahead and replace it with your own.
Introduction to the seminar ILC Detectors: Status and Prospects Akiya Miyamoto KEK IPNS 18 July
Lake Okeechobee Regulation Schedule
Planning & Community Development Department Lower Hastings Ranch Moratorium Extension City Council January 25, 2016.
NSDI Strategic Plan Update August NSDI Strategic Plan – Purpose/Scope Purpose: Develop a concise, updated strategic plan to guide the Federal government’s.
2 July 2002 S. Kahn BNL Homestake Long Baseline1 A Super-Neutrino Beam from BNL to Homestake Steve Kahn For the BNL-Homestake Collaboration Presented at.
Conventional Facilities and Siting Global Group Global Design Effort CFS EDR Kick-Off Mtg, FNAL Aug 22 – 24, CFS EDR FNAL Kick-Off Planning.
Market Operations Standing Committee March 5, 2003.
Standards Review Update. Standards Review Timeline ELA and Math –Last year, more than 130,000 reviews and more than 20,000 comments were collected on.
NSDI Strategic Plan Update FGDC Coordination Group Meeting November 19, 2013.
Educational Master Plan (EMP) Summer Timeline (Phase II) July 29, 2015 revised August 18, 2015 E. Kuo FH IR&P.
North Carolina High School Math Task Force Update Summer 2013.
Conventional Facilities for the Far Detector Options Assumptions and Cost Estimates T. Lundin April 25, 2012 LBNE Reconfiguration Workshop - 25, 26 - April-2012.
SBN Near Detector Building Conventional Facilities Update Steve Dixon LAr1-ND Collaboration Meeting 16 September 2014.
Science Requirements and Instrumentation for Future Neutrino Experiments Gina Rameika, Fermilab Instrumentation Frontier Community Planning January 9 –
The DUNE 35ton Prototype at Fermilab. DUNE FD ND 1300 km We have learned much about neutrinos in the last 70 years, but there is still much we don’t understand.
LBNE Reconfiguration Engineering/Cost Working Group Report Jim Strait Fermilab LBNE Project Manager Deputy Chair, Cost and Engineering Working Group Fermilab.
DUNE-UK Mark Thomson University of Cambridge DUNE-UK Meeting, UCL May 15, 2015.
“Megaton” Cerenkov Detector - Excavation Kenneth Lande, Univ. of Pennsylvania 4200 mwe Depth.
ICARUS-LBNE project A. Guglielmi 1.LBNE-ICARUS Padova meeting 2.SPS-C C. Rubbia presentation.
Long-Baseline Neutrino Experiment James Strait LBNE Project Director Public Information Meetings June 25-26, 2013 LBNE-doc-7321.
LBNE Project Scope, Cost, Schedule and International Involvement 1 Jim Strait, Fermilab LBNE Project Director P5 Meeting 3 November 2013.
To Create Bristol’s Comprehensive Plan
Beyond Brochureware: Making an Online Class Schedule Work for Students
Inspire Elementary School
USBE: Tracy Gooley and Tanya Semerad
Educational Information System Replacement Plan Overview
Student Assignment Review Advisory Committee
United Way of Benton & Lincoln Counties
2009 TIMELINE PROJECT PLANNING 12 Months Example text Jan Feb March
Strategic Planning Process
Strategic Planning Process
OPO Committee Fall 2018.
North Augusta High School – Phase 2A and 2B
Fermilab Proton Beams: Program Perspectives Greg Bock Fermilab Science and Engineering at Henderson-DUSEL Capstone Workshop Stony Brook May 5,
TGaf Nanjing Closing Report
2009 TIMELINE PROJECT PLANNING 12 Months Example text Jan Feb March
SACS Working Group Continual Commitment to Accreditation and Educational Improvement April 18, 2012.
Student Assignment Review Advisory Committee
Calendar Overview – Phase I – REVISED April 2019
Calendar Overview – Phase II – REVISED April 2019
26 Oct 2017 – May 2019 Well water level monitoring data
Presentation transcript:

LBNE Reconfiguration Jim Strait, LBNE Project Director Fermilab Community Advisory Board August 23, 2012

FCAB -- Aug 23,

Brinkman’s charge (March 19, 2012) Steering Committee + working groups formed (April 3, 2012) Workshop (April 25-26, 2012) Steering Committee Kickoff meeting (April 9, 2012) Interim Report (June 5, 2012) HEPAP meeting (August , 2012) Final Report (August 6, 2012) Crash Program to Reconfigure LBNE Community input Steering Committee Steering Committee face- to-face meeting (April 26, 2012) Steering Committee face- to-face meeting (May 22-23, 2012) DPF news letter to solicit community feedback on the interim report (July 3, 2012) Brinkman’s letter in response to the interim report (June 29, 2012) DPF announcement for workshop and community input to SC (April 15, 2012) 3 community input 12 steering committee teleconference meetings numerous working group meetings 12 steering committee teleconference meetings numerous working group meetings Input to the European Strategy Group (July 30, 2012)

Workshop (April 25-26, 2012) 4 More than 200 participants ~5 hours devoted to community voice

Open Process 5 directorate/lbne_reconfiguration All documentation on this web site

FCAB -- Aug 23,

J.Strait, FRA Visiting Committee Meeting, April 12-13, 2012 Sample with bullet points First Bullet Second Bullet –More –Yet more –Still more –Less important »Trivial New Neutrino Beam at Fermilab… Directed towards a distant detector Precision Near Detector on the Fermilab site 34 kton Liquid Argon TPC Far Detector at a depth of 4850 feet (4300 mwe) 7 Original Design

J.Strait, FRA Visiting Committee Meeting, April 12-13, 2012 Sample with bullet points First Bullet Second Bullet –More –Yet more –Still more –Less important »Trivial New Neutrino Beam at Fermilab… Directed towards a distant detector Precision Near Detector on the Fermilab site 34 kton Liquid Argon TPC Far Detector at a depth of 4850 feet (4300 mwe) 8 10 kton Liquid Argon TPC Far Detector just below the surface First phase of the reconfigured program We plan to eventually to build a Near Detector at Fermilab and an underground detector in South Dakota, either in a future phase or by obtaining resources from beyond the DOE.

Local Impact of Reconfiguration FCAB -- Aug 23, Smaller Hill X No On-Site Detector

LBNE Neutrino Beamline Hill height:was 70 feet now 58 feet FCAB -- Aug 23,

FCAB -- Aug 23, Looking East Northeast from West Side of Kirk Road Beamline hill now 12’ lower than shown here.

FCAB -- Aug 23, Looking East Northeast from West Side of Kirk Road

EAST SIDE OF KIRK ROAD LOOKING NORTH EAST Beamline hill now 12’ lower than shown here.

EAST SIDE OF KIRK ROAD LOOKING NORTH EAST

LBNE Project Life Cycle & Approvals Spring REVISED May Current LBNE Schedule, Aug 2012 Dec

Questions? Comments ? FCAB -- Aug 23,