Alachua County Board of County Commissioners NW 16 th AVENUE / NW 23 rd AVENUE FROM NW 57 th Terrace to NW 13 th Street.

Slides:



Advertisements
Similar presentations
Reston Metrorail Access Group (RMAG) Status Report Board of Supervisors Transportation Committee September 20, 2011.
Advertisements

Reston Metrorail Access Group (RMAG) Status Report Board of Supervisors Transportation Committee November 29, 2011.
Project Description and Needs Lincoln Way Widening Addition of a center-turn lane and safety improvements to the grade and horizontal alignment. Needs.
Alachua County Board of County Commissioners NW 16 th Avenue / NW 23 rd Avenue (NW 57 th Terrace to NW 13 th Street) Alachua County Public Works HDR Engineering.
Maryland Avenue and Arkwright Street Nick Fischer, EIT Ramsey County Jerry Auge, PE Project Manager Ramsey.
Maryland Avenue and Arkwright Street Jerry Auge, PE Project Manager Ramsey County April 2, 2013.
Maryland Avenue and Arkwright Street Jerry Auge, PE Project Manager Ramsey County June 25, 2013.
CR 236 Resurfacing from US 441 to I-75 30% Plans Alachua County Board of County Commissioners September 28, 2010.
City of High Springs - Traffic Study City of High Springs Traffic Study Sept. 16th, 2003 Public Meeting #2.
Titusville to Edgewater Bike Loop PD&E Study
District 2 System Preservation Projects for FY 15 and FY 16 Gregory B. Holsey - District Engineer Thomas S. Revelle - Assistant District Engineer – Project.
City Council Meeting Lisa A. Kuss City Administrator May 8, 2012.
County of Fairfax, Virginia Sully District Council Meeting November 19, 2014.
Borough of Madison Samson Avenue Reconstruction Engineering CY2012 Existing Conditions Underground Infrastructure Federal Aid SRTS Application Reconstruction.
US Highway 17 (Center Street) Sidewalk Feasibility Study Town of Pierson, Florida.
Dowell Road Widening From South of HG Truman Road To South of Bean Road Calvert County, Maryland.
Holden Heights Community Improvement Project Update Orange County Board of County Commissioners December 17, 2013.
District 2 System Preservation Projects for FY 14 and FY 15 Gregory B. Holsey - District Engineer Thomas S. Revelle - Assistant District Engineer – Project.
WTBA/ WisDOT Contractor /Engineer Conference January 21 and 22, 2009 Local Government Involvement on WisDOT Projects Craig J. Treadway, P.E., NE Region.
Maryland Avenue and Arkwright Street Jerry Auge, PE Project Manager Ramsey County
In association with: THOMAS ROAD STREETSCAPE 73 RD STREET TO HAYDEN ROAD PROJECT NO. T0606 City of Scottsdale.
August 7, 2013 Luke Lortie, EIT Jerry Auge, PE
VTA Light Rail System and Safety Enhancements MTC Railroad Crossing Seminar May, 21, 2008.
Virginia Street Bus RAPID Transit Extension Presentation to RTC July 17, 2015 Project Purpose Extend RAPID to UNR Improve pedestrian safety & access Create.
Borough of Madison Woodland Avenue Reconstruction Engineering CY2009 Existing Conditions Underground Infrastructure Municipal Aid Application Reconstruction.
US 1 COLLEGE PARK – SEGMENT 1 FROM COLLEGE AVE/REGENTS DRIVE TO MD 193 (UNIVERSITY BLVD) Presentation to College Park City Council August 5,
In this Presentation…. Project Overview Key Issues Elements of Design Funding and Schedule.
Alachua County Board of County Commissioners March 24, 2009 Main Street Milling & Resurfacing Project Project Update & Plan Approval.
Capital Improvement Program. During the Annual Strategic Action Plan (SAP) evaluation, long-term needs and priorities are identified by City Council Capital.
Borough of Madison Green Avenue Reconstruction Engineering CY2012 Existing Conditions Underground Infrastructure Municipal Aid Application Reconstruction.
SR 997 / KROME AVENUE Florida Department of Transportation April 27th, 2006 South Miami-Dade Watershed Study Advisory Committee.
SR 1 BLUFFTON Public Hearing September 25, INDOT Mission: INDOT will plan, build, maintain and operate a superior transportation system enhancing.
1 Tower Road Project Update. 2 The Project Team requests the Alachua County Commission: Authorize staff to: Proceed with re-evaluating four (4) key issues.
Phase 2: 30% Design Plans September 4 th, 2012.
N. Hancock Road Traffic Signals October 14 th, 2014 Presentation Prepared By Lake County Public Works Department.
Presentation Outline  Recommendation  Project Background  Public Involvement  Proposed Design  Citizen Comments/Questions  Summary and Recommendation.
MD 97 (Georgia Avenue) at Randolph Road Purpose Improve vehicular, bicyclists and pedestrian safety Improve Levels of Service Increase capacity Improve.
Oregon Transportation Commission October 14, 2015 OR 99 Rogue Valley Corridor Plan.
April 18, 2013 Luke Lortie, EIT Jerry Auge, PE
Outline  Board Direction  Tasks Completed  Recommendation.
Titusville to Edgewater Bike Loop PD&E Study FDOT Project Number: Volusia County, Florida FDOT Project Number: Brevard County,
What is a TSP? Provides City with guidance for operating and improving a multimodal transportation system Focuses on priority projects, policies, and programs.
Route 12B Safety Improvement Project New York State Department of Transportation Mark Silo, P.E. Thomas J. Madison, Jr. Regional DirectorCommissioner.
2010 Bicycle and Pedestrian Work Program Update.  Several top projects from 2008 Work Program have been completed.  Design is ongoing on other top projects.
July 13, 2010 Board of County Commission Transmittal Hearing.
COUNTY ROAD 517 Improvements from State Highway 172 to Howe Drive DECEMBER 16, 2015 At Tribal Multipurpose Facility.
156 th Street Design in Bennington Public Open House Meeting October 28, 2009 City of Bennington, NE.
1 MD 5 (Point Lookout Road) Leonardtown (Phase 1) Intersection Reconstruction At Abell and Moakley Streets Informational Meeting January 19, 2016.
ALACHUA COUNTY TRANSPORTATION PRIORITIES FOR FLORIDA DEPARTMENT OF TRANSPORTATION WORK PROGRAM Fiscal Year 2015 – 2019 Presentation to Board of County.
90% PLAN APPROVAL. Presentation Outline  Board Direction  90% Plan Modifications  Cost Estimates  Project Timeline  Recommendation.
Alachua County Board of County Commissioners NW 16 th Avenue / NW 23 rd Avenue (NW 57 th Terrace to NW 13 th Street) Alachua County Public Works.
East-West Corridor Connectivity Study – Study Recommendations November 17, 2009.
City of Belmont Pavement Reconstruction Project October 15, 2014.
Visit Our Website at: Click to edit Master title style.
PUBLIC IMPROVEMENT HEARING 2015 Street, Utility and Retaining Wall Improvements - Grandview Boulevard November 12, 2014 (continued to December 9, 2014)
Approve Humboldt Avenue Pedestrian and Bicycle Improvement Project Plans.
SIX YEAR TRANSPORTATION IMPROVEMENT PLAN (STIP) Public Hearing.
Transportation Program (Infrastructure) Presentation Board of Aldermen Work Session February 29, 2012.
S.R. 30A / U.S. 98 / Panama City Beach Parkway
District 3 Complete Streets Projects
Kerr Tar Project Update – June 2016
SW Gage Blvd - Street Repair Project
SE 12th Street Roadway Improvements February 8, 2005.
State Aid Standards Development
PUBLIC HEARING S.R. 30 (U.S. 98 Business/West Garden Street)
Protected Bicycle Lanes Finally Pedal Their Way to KC…
Walker Street Reconstruction Project 25% Design Public Hearing
I Street Bridge Replacement Project
Proposed I-710 Early Action Project City of Huntington Park Slauson Avenue Capacity Enhancement Improvements I-710 TAC Meeting August 2018.
Presentation transcript:

Alachua County Board of County Commissioners NW 16 th AVENUE / NW 23 rd AVENUE FROM NW 57 th Terrace to NW 13 th Street

PROJECT LOCATION NW 16 th Avenue / NW 23 rd Avenue (From NW 57 th Terrace to NW 13 th Street) HDR Engineering Gainesville NW 16 th Avenue / NW 23 rd Avenue

PRESENTATION OUTLINE NW 16 th Avenue / NW 23 rd Avenue HDR Engineering Gainesville  Present 60% Plans  Next steps  Questions & Comments

HDR Engineering Gainesville NW 16 th Avenue / NW 23 rd Avenue October 27, 2009Board of County Commissioners November 16, 2009Public Meeting December 1, 2009Bicycle/Pedestrian Advisory Board February 23, 2010Board of County Commissioners June 7, 2010BPAB & Gainesville Cycle Club October 12, 2010Board of County Commissioners December 15, 2010Joint City & County Workshop January 11, 2011Board of County Commissioners January 25, 2011Board of County Commissioners March 17, 2011City of Gainesville Commission July 12, 2011 Board of County Commissioners PUBLIC INVOLVEMENT TO DATE

HDR Engineering Gainesville NW 16 th Avenue / NW 23 rd Avenue July 12, 2011 BOCC Meeting 1.Approve proposed typical section 2.Direct staff to proceed with the development of 60% plans in regards to the NW 16 th Ave./NW 23 rd Ave. resurfacing project 3.Infill sidewalk to the curb, expand to 10 feet where practical and cost effective, ensuring a stable, smooth, and level surface the length of the corridor

HDR Engineering Gainesville NW 16 th Avenue / NW 23 rd Avenue PROJECT ELEMENTS 1.Rehabilitate the existing asphalt pavement by milling to the limerock base and resurfacing with 3 inches of new asphalt. 2.Upgrade all existing pedestrian components to satisfy ADA requirements as required by Federal Law. 3.Improve existing pedestrian accommodation by widening existing sidewalks as much as practical and feasible. 4.Improve pedestrian and bicycle accommodation by widening existing sidewalks and remarking the roadway on NW 16 th Boulevard and NW 16 th Avenue to provide a wider outside lane and designating the lane as a shared lane for both bicycles and vehicles.

HDR Engineering Gainesville NW 16 th Avenue / NW 23 rd Avenue PROJECT ELEMENTS 4.Improve safety by extending the existing 5 lane section from NW 55 th St. west to NW 57 th Terrace, closing two existing median openings and converting one existing median opening to a directional opening. 5.Reconfigure the north and south legs of the NW 55 th St. intersection to provide a dedicated left turn lane and a through lane in each direction to improve capacity and safety. 6.Rehabilitate two sections of leaning retaining wall on NW 16 th Avenue by lowering the wall height and placing a new layer of concrete on the wall face. Total Estimated Project Cost = $7,136,200* *Includes 10% contingency

HDR Engineering Gainesville NW 16 th Avenue / NW 23 rd Avenue PROPOSED TYPICAL SECTION NW 23 rd Avenue

HDR Engineering Gainesville NW 16 th Avenue / NW 23 rd Avenue PROPOSED TYPICAL SECTION NW 16 th Blvd.

HDR Engineering Gainesville NW 16 th Avenue / NW 23 rd Avenue PROPOSED TYPICAL SECTION NW 16 th Ave.

HDR Engineering Gainesville NW 16 th Avenue / NW 23 rd Avenue SIDEWALK IMPROVEMENTS Infill sidewalk to the curb

HDR Engineering Gainesville NW 16 th Avenue / NW 23 rd Avenue SIDEWALK IMPROVEMENTS Expand to 10 feet where practical and cost effective 10 ‘ Wide Sidewalk

HDR Engineering Gainesville NW 16 th Avenue / NW 23 rd Avenue SAFETY IMPROVEMENTS 1.Extend 5 lane section on NW 23 rd Ave. from NW 55 th St. to NW 57 th TerraceExtend 5 lane section on NW 23 rd Ave. from NW 55 th St. to NW 57 th Terrace 2.Close existing median opening just east of NW 43 rd St. and convert existing opening at the Publix/Fresh Market driveways to a directional opening permitting only left turns to the drivewaysClose existing median opening just east of NW 43 rd St. and convert existing opening at the Publix/Fresh Market driveways to a directional opening permitting only left turns to the driveways 3.Close existing median opening just west of NW 13 th St.Close existing median opening just west of NW 13 th St. 4.Reconfigure the NW 55 th St. intersection to improve capacity and safety.Reconfigure the NW 55 th St. intersection to improve capacity and safety.

LOOKING AHEAD NW 16 th Avenue / NW 23 rd Avenue HDR Engineering Gainesville  Finalize Plans for Bidding – February 2013

RECOMMENDATIONS NW 16 th Avenue / NW 23 rd Avenue HDR Engineering Gainesville  Approve 60% Plans  Direct staff to proceed with development of 100% plans and advertise project for bids

Alachua County Board of County Commissioners THANK YOU Any Questions?

HDR Engineering Gainesville NW 16 th Avenue / NW 23 rd Avenue return NW 58 th Blvd NW 57 th Terrace NW 55 th St NW 55 th Terrace Northwest Baptist Church

HDR Engineering Gainesville NW 16 th Avenue / NW 23 rd Avenue return

HDR Engineering Gainesville NW 16 th Avenue / NW 23 rd Avenue return NW 13 th St Citgo Georgetown Apts. Starbucks Georgetown Apts. Villa Ravine Apts. Jodi Messler School of Dance Holy TrinityGesalt Center Close Opening

HDR Engineering Gainesville NW 16 th Avenue / NW 23 rd Avenue return NW 55 th St NW 55 th Terrace Northwest Baptist Church

HDR Engineering Gainesville NW 16 th Avenue / NW 23 rd Avenue Sidewalk Improvements 1.The existing 2.5 foot wide grass strip between the curb and the existing sidewalk will be filled with new concrete sidewalk for a total concrete width of 7.5 feet. The outer 6 inches will be beveled to the top of the existing curb to provide a smooth connection resulting in a minimum useable sidewalk width of 7 feet. 2.Existing sidewalk that is badly cracked or broken will be completely replaced. 3.A 10 foot wide sidewalk (9.5 feet useable width) will be provided on the north side of NW 23 rd Avenue from NW 57 th Terrace to NW 43 rd Street. 4.A 10 foot wide sidewalk (9.5 feet useable width) will be provided on the south side of NW 16 th Boulevard from NW 43 rd Street to NW 34 th Street.