February 11,12 2010DCal Technical Meeting 1 DCal Funding and Start up in the US.

Slides:



Advertisements
Similar presentations
Alice EMCAL meeting, July EMCAL jet trigger status Olivier BOURRION LPSC, Grenoble.
Advertisements

January 6. January 7 January 8 January 9 January 10.
Electron Model Components and Costing C. Johnstone Summary talk, C. Johnstone FFAG04 Oct 12-16, 2004 KEK, Tsukuba, Japan.
1 Astronomy and Astrophysics Advisory Committee Astrophysics Division FY2008 Budget February 8, 2007 Rick Howard Astrophysics Division Director (acting)
TURBO PROPS Capacity: 6 – 8 People Speed: mph Range: 1,500 – 2,000 sm Rate: $1,200 – 1,500/hr.
Submission doc.: IEEE / 0431 r0 March 2015 Dmitry Cherniavsky, SiBEAM, Inc.Slide 1 Shared MIMO Architecture for ay. Date: Authors:
NWPP MC Initiative WECC Update March 25th, 2015 Kathy Anderson
David H. Dowell Injector RF Design November 3, LCLS Injector RF Gun: Design, Fabrication & Tuning Plans D. H. Dowell,
DCal Meeting
ALICE EMCal Physics and Functional Requirements Overview.
Cynthia HadjidakisTerzo Convegno sulla Fisica di ALICE Detection of photons and electrons in EMCAL Photons, Electrons and  0 at large p T Identification.
Software Developer By: Charlie Edwards Period 6 th Mrs. Truong.
The Youth Music Programme Application and Assessment Process 2012.
12 Dec 2005 J. Schukraft1 ALICE USA ALICE position towards US participation EU participation in emcal Requirements Formal steps & schedule.
Univ. of Tsukuba & JSPS T. Horaguchi Jan for the ALICE Analysis Workshop 2010/1/21 ALICE Analysis Hirosima Univ. 1.
03/27/'07T. ISGC20071 Computing GRID for ALICE in Japan Hiroshima University Takuma Horaguchi for the ALICE Collaboration
Team Member(s) Your name. 25 January SOLD: BUY: Copy of stock pdf.
‘2+1’ correlation – Tagging of Back to Back Jets GREESHMA K M IIT Bombay ALICE-India Meet 27 th & 28 th April
Bryan High School January 23,  31 vocational/technical programs  Job placement services  Internship/Mentorship, Early Job Placement, Summer Work.
May 11, Astronomy and Astrophysics Advisory Committee Astrophysics Division and Update May 11, 2006 Rick Howard Astrophysics Division Director (Acting)
October 2010CERN-Korea J. Schukraft1 ALICE Status 8 th CERN-Korea meeting Collaboration News Korean participation General ALICE status report on Wednesday.
Simulation tools for Upgrades NLO pQCD (W. Vogelsang) CTEQ6M5, DSS FF 200 GeV |  |
Residential Single Family and Manufactured Home Heat Pump Water Heaters Christian Douglass Regional Technical Forum 4/14/2015.
Refrigerator Decommissioning: Measure Status Update Regional Technical Forum October 16, 2013.
BSc Final Year Projects in Computing Computer Science, Creative Computing, Games Programming, Business Computing Dr Rodger Kibble.
Statewide Transportation Improvement Program: Proposed Enhance Process for STIP Oregon Transportation Commission Meeting Presented by: Jerri.
ALICE high p T workshop, LBNL, April 7, 2009 (T. Chujo) J-Cal Construction Plan Tatsuya Chujo University of Tsukuba (for the ALICE J-Cal Project) 1.
15-16 Oct 2005 Alice-USA meetingAleksei Pavlinov GEANT EMCAL geometry for ALICE current status Aleksei Pavlinov WSU.
Latest Developments With Respect To Redevelopment Successor Agencies Department of Finance Local Government Unit.
Dorset County Council SEACS Project – Work Package 3 (Schools) Update November 2011 – March 2012 Meetings with 10 schools to discuss Energy Awareness Campaigns.
Santa Cruz Meeting August 12 th 2008 Layout options & Schedule Issues David Lissauer 8/12/2008 1David Lissuaer, Santa Cruz Meeting.
EMCal Status ALICE Technical Board November 20, 2008 News Schedule.
VVS Prototype Construction at Fermilab Erik Ramberg 26 February,2002 Design issues for VVS Details of VVS prototype design Schedule and Budget Testing.
Putting the Pieces Together OTC Fall Meeting November 2-3, 2005 Planning to Meet the SIP Submittal Deadlines.
System Maintenance Modifications or corrections made to an information system after it has been released to its customers Changing an information system.
first results from EMCal test beam
CDCM Annual Review 02 February | Energy Networks Association - DCMF Date: 1 March 2012 Venue: Institute of Physics Time: 10:00 – 15:00.
Overview of HINS Operations and Radiation Shielding Considerations in the Meson Detector Building Bob Webber August 16, 2006.
ALICE EMCAL CATANIA FACILITY The assembly Lab Assembly Team Catania Team is composed: 1 Ricercatore Armando Palmeri 1 Assegnista Tecnologo Francesco.
Update on the North Carolina Transmission Planning Collaborative January 30, 2007 For the North Carolina Utilities Commission and the North Carolina Public.
1 Welcome to ODOT Practical Design Tier 1 Training (Tab 1)
SCU 3-Lab Review Meeting, Dec. 16, 2014 SCU Presentations Today Intro. & Performance Motivations (P. Emma, SLAC, 20+5) Conceptual Cryostat Design: Option-A.
Archivists' Toolkit - All Hands Meeting Design Team Progress Use Case template design, development, and review - Use Cases proposed and reviewed.
10 May 2006Paul Dauncey1 ALICE EMCAL Technical Proposal: First Discussion Paul Dauncey, Michel Gonin, Junji Haba.
Bedford County Budget Work Session February 4, 2013.
Technical Board Summary Alan Bross MICE CM17 CERN February 25, 2007.
Transmission Advisory Group NCTPC Process Update Rich Wodyka September 7, 2006.
SPHENIX Mid-rapidity extensions: Additional Tracking system and pre-shower Y. Akiba (RIKEN/RBRC) sPHENIX workfest July 29,
Scheduling Terminology and Concepts. Objective Outline the training strategy for Scheduling in MyEdBC Introduce the Build view and the layout Provide.
DCal-ALICE integration and installation plan and status A. Tauro.
PR70007 – MarkeTrak Ph2 ERCOT Marketrak Task Force February 7, 2008.
Camera PDR/CD1 Planning 19 September 2008
News about the WA104 Programme
GEM Upgrade Projects: Schedule
ALICE upgrade plans Paolo Giubellino LHCC Upgrades
Jet reconstruction in ALICE using the EMCal
Writing the Four Part Learning Objective
Domestic Season
February 12 – 19, 2018.
First physics from the ALICE electromagnetic calorimeters
C75 LLRF Cost and Schedule
Balancing the Operating Budget Ward Forum Presentation
Bryan Adams High School
eSRA in Cognos – An Overview
Process Description Tools
Jet Measurements with the EMCal of ALICE
2012 WSC / JSTC Meetings SIA in USA
Thing / Person:____________________ Dates:_________________
Status of SF Model Dipole Contract with TAMU
VESI Technical Standards Harmonisation Technical Standards Working Group 19 July 2019(Final)
Presentation transcript:

February 11, DCal Technical Meeting 1 DCal Funding and Start up in the US

February 11, DCal Technical Meeting 2 Super Module Installation Test Near the 90 degree position Funding US Participation in DCal: Latest, Highly Technical Feedback: US DOE says participation in DCal at the level of 3SM is “No Brainer”* US Idiom Dictionary: “No Brainer” = 1.A decision that can be made without serious thought 2.Something that is obvious

February 11, DCal Technical Meeting 3 ALICE - EMCal The DOE has confirmed that they prefer to reconfigure the two 1/3 EMCal SMs as the first US DCal SM => One DCal SM already funded by US part of EMCal project

February 11, DCal Technical Meeting 4 Super Module Installation Test Near the 90 degree position Assuming material availability DCal Production Start Date is approximately March 26 th.

February 11, DCal Technical Meeting 5 Super Module Installation Test Near the 90 degree position Funding Full proposal to DOE due February 26 th Cost and Schedule Finalized New Simulation Studies: pi_zero + Jet model studies with Qpythia => geometric bias Jet + Jet di-jet energy balance studies with Qpythia => path length in-medium

February 11, DCal Technical Meeting 6 Super Module Installation Test Near the 90 degree position

February 11, DCal Technical Meeting 7 Super Module Installation Test Near the 90 degree position EMCal Parameters