The State of Rail in Illinois Midwest High Speed Rail Association April 12, 2014.

Slides:



Advertisements
Similar presentations
Piedmont Improvement Program NC Society of Engineers
Advertisements

May 9 th, The Marshall. Mission Statement To develop a regional consensus for capacity investments to secure higher speed rail for the 8 million residents.
The travel solution for our time 1 High-Speed Rail at Amtrak Frank Vacca, Chief Engineer June 24, 2011.
STATE OF NEW YORK Andrew M. Cuomo Governor New York State DOT Joan McDonald Commissioner Presentation by NYSDOT to the Transportation Border Working Group.
OHIO & LAKE ERIE REGIONAL RAIL CLEVELAND HUB STUDY Ohio Rail Development Commission TMACOG Annual Transportation Summit September 29, 2003.
Update of Downtown Rail Improvements DFWI & Chamber Stakeholders February 26, 2014 Alonzo Liñán, PE, PTOE City of Fort Worth.
INTERCITY PASSENGER RAIL NORTHEAST UPDATE AASHTO – FEBRUARY 29,
Overview CMAA May 29, What is Metro Regional Rail >Manage more than 165 miles of R/W in L.A. County >Develop capital improvement projects and.
Overview ACEC July 16, What is Metro Regional Rail >Manage more than 165 miles of R/W in L.A. County >Develop capital improvement projects and.
I-95 Corridor Coalition December 14, 2001 I-95 Corridor Coalition Mid-Atlantic Rail Operations Study — An Integrated Strategy to Eliminate Choke Points.
Passenger Rail – Plan & Opportunities Engineer Contractor Conference Middleton, WI January 21, 2010.
Freight Action Strategy for the Everett-Seattle-Tacoma Corridor February 2003.
The 2011 Rail Conference: Moving Freight and Passengers in the 21 st Century Seaports and Freight Rail Eric D. Johnson Executive Director Washington Public.
WELCOME ! 2011 Indiana State Rail Plan. Why is INDOT Completing a State Rail Plan? Provide guidance for future freight, passenger rail planning, investments,
Passenger Rail Development Activities AASHTO Annual Meeting October 18, 2013 Serge Phillips, MnDOT Federal Relations Manager.
High Speed Rail on the Horizon State Public Transportation Partnerships Conference Westin Hotel, Seattle, WA August 3 - 5, 2010 Paula Hammond Secretary.
High Speed Passenger Rail for Indiana August 21, 2012.
VIRGINIA RAILWAY EXPRESS SYSTEM PLAN 2040
ASSOCIATION OF AMERICAN RAILROADS Chicago Area Rail Infrastructure 16,000 acres, twice the area of O’Hare 78 yards, including 21 intermodal (rail-truck)
IDOT Division of Public and Intermodal Transportation
M IAMI F ORT L AUDERDALE W EST P ALM B EACH O RLANDO Addresses Florida’s demand for express, intercity rail travel. Is designed to serve tourists, business.

Midwest High Speed Rail Case StudySeptember 29th, 2004 Andy Inserra, Kristin Thompson, T.J. Thurlow, Natalie Villwock.
Southeast Michigan Council of Governments. Ann Arbor –Detroit Regional Rail Project Update April 27, 2010.
Bus Rapid Transit: Chicago’s New Route to Opportunity Josh Ellis, BRT Project Manager Metropolitan Planning Council.
Krum Amtrak Stop Status September 21, 2010 Mayor Terri Wilson Krum, TX.
Northern Lights Express High Speed Rail: MN APA Conference September 2011.
“High Speed Rail Implementation - An Update on Passenger Rail Planning Activities in Minnesota.” presented by: Minnesota Department of Transportation March.
1 THE FREIGHT RAIL INFRASTRUCTURE CHALLENGE 2009 AASHTO SCORT Conference – Oklahoma City, OK September 20 – 23, 2009.
Trains are better for our environment than other modes of travel.
Intercity Rail Background/ Statewide Freight and Passenger Rail Plan Update Met Council TAC Meeting November 5, 2008.
Passenger Rail Planning Activities in Minnesota presented by: Minnesota Department of Transportation March 15, 2011.
May 25, 2010 Wisconsin High Speed Intercity Passenger Rail From vision to reality MADISON COMMUNITY MEETING John Oimoen, High Speed Passenger Rail Program.
State of Rail in Texas STATE OF RAIL IN TEXAS Erik Steavens Rail Division Director, TxDOT.
Transportation Program Status Orange County Transportation OCBC Infrastructure Committee Meeting April 14, 2009 Kia Mortazavi, OCTA, Executive Director,
Talking Freight Promoting Economic Revitalization through Enhanced Freight Transportation Eric G. Madden Deputy Secretary for Aviation and Rail Freight.
The Crescent Corridor Intermodal Freight Project Improving Lives and Livelihoods IN & AROUND DC Washington, DC December 16,
1 SOUTH FLORIDA EAST COAST CORRIDOR TRANSIT ANALYSIS STUDY Municipal Meetings September 2006.
Roosevelt Road: State to Columbus Public Meeting September 22, 2015.
A Proposed I-5 Loop Design Option Riverfront For People Portland, Oregon January 16, 2004 Riverfront For People Portland, Oregon January 16, 2004.
Michigan Accelerated Rail Service Passenger & Freight Director Kirk T. Steudle, P.E. Michigan Department of Transportation Faster, Better, Cheaper, Safer,
T.H. 23 / SOUTH SARATOGA STREET REDUCED CONFLICT INTERSECTION AND PEDESTRIAN OVERPASS PROJECT PROJECT HEARING June 10, 2014 City Council Presenters Glenn.
The Burnham Transportation Plan of Chicago: 100 Years Later CTS-IGERT Weekly Seminar April 23, 2009 Joseph DiJohn Urban Transportation Center.
Overview Presentation Fall 2015 Gainesville-Haymarket Extension Study.
Amtrak Gov’t Affairs October 19, 2007 Amtrak Key Facts Summary November 12, 2007.
US 36 Commuting Solutions Northwest Rail Westminster Segment/Eagle P3 Oct. 14, 2014.
Metropolitan Council 1 Twin Cities Region Transportation Policy Plan Nacho Diaz Metropolitan Council Evaluating Economic and Community Impacts of Transit.
Chicago – St. Louis High Speed Rail Program July 9, 2015
City of Joliet - Sustainability City of Joliet Sustainability Initiatives American Planning Association National Conference April 16, 2013.
Commuter Rail Studies Summary of MAG High Capacity Transit Study June 2003 Commuter Rail Summary.
1 Eagle P3 Project Update FasTracks Monitoring Committee September 1, 2015.
VA-NC Interstate High Speed Rail Compact Current Projects and Initiatives March 21, 2016 Paul C. Worley, Rail Director.
VA/NC Compact Passenger Rail Update Kevin Page Chief Operating Officer Rail and Public Transportation January 9, 2012.
Virginia Rail Program Update Virginia-North Carolina High Speed Rail Compact Commission Meeting March 21, 2016 Jennifer Mitchell Agency Director.
2014 Annual Program Evaluation (APE) Status Update April 1, 2014.
Program to improve Passenger rail – Amtrak and commuter
FAST Phase I is a $500 million investment to:
Indiana Report October 6, 2016.
Los Angeles – San Diego – San Luis Obispo Rail Corridor Update
Eagle P3 Project Update RTD Board of Directors Sept. 2, 2014.
Michigan Update Michigan Association of Rail Passengers
HSR Crossing Safety Update Elliot A
Highway 14 – Owatonna to Dodge Center District 6 Update
ASSOCIATION OF AMERICAN RAILROADS. ASSOCIATION OF AMERICAN RAILROADS.
ASSOCIATION OF AMERICAN RAILROADS. ASSOCIATION OF AMERICAN RAILROADS.
AASHTO Rail Resource Center Webinar Series
2016 SCORT Annual Meeting Federal Grant Opportunities
VIRGINIA RAILWAY EXPRESS
2014 Annual Program Evaluation (APE) Status Update
Chicago to Council Bluffs-Omaha
Presentation transcript:

The State of Rail in Illinois Midwest High Speed Rail Association April 12, 2014

Topics Chicago-St. Louis progress report – Chicago-St. Louis – Joliet Station – Chicago-Rockford – Chicago-Moline Locomotive and Railcar Procurement Other Studies 220 report CREATE Update Q&A

Midwest Regional Rail Initiative

The First Corridor: Chicago-St. Louis $1.3 billion in federal grants More than $400 million in state matching funds Overall trip time reduction to 4h 25 minutes by end of 2017 Corridor to be equipped with new locomotives and railcars beginning in 2016

Chicago-St. Louis Work Update Class VI rail and concrete ties installed between just south of Joliet to south of Alton Dwight-Pontiac 15-mile segment now operating at 110 mph 110 territory to expand in two phases: End of ’15 and end of ‘17 (30-minute travel time reductions corresponding with each completion date) Work in to concentrate on: – 13 new sidings to add capacity – Installation of positive train control – Improvements at more than 200 grade crossings

Joliet Station Project $50 million project funded by Illinois, City of Joliet, and BNSF Will move Metra Rock Island Joliet stop to east of intersections with UP and BNSF New parking lot completed New Rock Island platform now in construction Amtrak and Metra Heritage Corridor trains to be served by center platform New station building to be adjacent to new Rock Island platform Passengers no longer will need to cross live tracks to board Existing historic station building will be maintained as event space Completion slated for late 2015

Bringing Passenger Trains Back Chicago-Rockford-Dubuque – Protracted negotiations with CN Railway led state to decision to move to “northern” route on UP – Initial 59 mph, 1 daily round-trip service to begin by end of ‘15 – Service to be upgraded in ‘16 – State will continue to pursue completing route from Rockford to Dubuque on CN – $223 million for Chicago-Rockford to be funded entirely by state Chicago-Moline – Construction on BNSF segment between Chicago and Wyanet to be completed in 2014 – State recently increased its investment from $45 to $78 million, further leveraging $177 million federal grant – New Moline station now in design; received Tiger grant – Segment between Wyanet and Moline owned by Iowa Interstate Railroad; negotiations on final upgrade scope and budget to be finished in upcoming weeks, permitting construction to begin this year – Route will run on all new locomotives and railcars

Rolling Stock Update Railcars – Bi-level cars being built by Nippon-Sharyo – Now in final design – Pilot cars coming in spring‘16 – Monthly deliveries to start late in ’16 – Goal is to equip as many corridors as possible in Midwest with new equipment Locomotives – IDOT led procurement – Awarded to Siemens – 21 locomotives coming – First deliveries in ‘17

Other Studies Underway Chicago-St. Louis Tier 2 studies: – Chicago-Joliet: On Rock Island Corridor – South of Springfield: UP/NS Flyover – Granite City-St. Louis: Includes new or rehabilitated crossing over Missisippi River – Once complete, these studies will put state in position to compete for design/construction funding Quad Cities-Danville feasibility study Additional Chicago-Champaign round-trips St. Charles Air Line and second connection at Grand Crossing (part of CrossRail plan)

If we build it… Will they come? Consider this: – In 2007, additional state investment in more daily round-trips— with no other improvements—led to phenomenal growth over the last seven years Chicago-St. Louis: Up 225% Chicago-Carbondale: Up 154% Chicago-Quincy: Up 95% And Chicago-Milwaukee, with NO CHANGE in schedule, up 42% – Total ridership on state-supported trains: Up from 948,000 to more than 1.8 million Now imagine ridership gains with much faster travel times, reliable service, and new equipment And of course, we just installed WiFi on ALL Midwest trains

220 MPH Program Part of Governor Quinn’s vision for Illinois University of Illinois study completed in 2013 Depending on level of investment, $23-$50 billion cost 8-15 million annual riders projected Key hurdle – funding the up-front capital cost State strategy – Complete CHI-STL 110 mph upgrades – Finish new corridors – Provide superior service on new equipment – Goal is for public’s embrace of improved train service to lead to demand for federal and state governments to take the “next step” toward true HSR

CREATE – Update

CREATE Partners

25 road/rail grade separations 6 passenger/freight rail grade separations 36 railroad projects to improve rail infrastructure and upgrade technologies Viaduct improvement program Grade crossing safety enhancements Rail operations and visibility improvements CREATE Program

5. Memphis 243,000 railcars BNSF, CSXT, CN, NS, UP 4. Kansas City 478,000 railcars BNSF, CPRS, KCS, NS, UP 3. New Orleans 602,000 railcars BNSF, CN, CSXT, KCS, NS, UP 2. St. Louis 645,000 railcars BNSF, CSXT, CN,KCS, NS, UP Source – U.S. DOT Freight Analysis Framework 3, 2010; includes freight originating and terminating at gateways – does not include through-freight 1. Chicago 1,343,000 railcars BNSF, CN, CPRS, CSXT, NS, UP East-West Freight Rail Gateways Ranked by Loaded Railcars per year, 2010

Project Status Project Status Completed Projects 20 Under Construction9 Final Design6 Environmental Review13 Remaining Projects22 TOTAL70

CREATE Program, Overall Project Status Summary Revised: 29-Nov-2012

CREATE and 110 MPH Program Modeling efforts did not include 110 program, but… CREATE “preserves the footprint” for 110 Some projects improve existing AMTRAK service on 110 corridors Some projects improve crossing routes Example: CREATE will permit 30 Metra Southwest Service trains/day to move to LaSalle St Station, freeing up Union Station slots for HSIPR usage

Another Example of CREATE Project Supporting 110 MPH Program Chicago - Detroit P1 – “Englewood Flyover” at right Main bridge spans complete Bridge will “fly” Metra Rock Island District commuter rail over Norfolk- Southern main line that also hosts Amtrak Michigan service Also helps Amtrak’s other Eastern routes Construction began in 2012 Expected substantial completion in October 2014 Add P1 mockup

RECENTLY COMPLETED

GS7, Belmont Road, Downers Grove Eliminated the at-grade crossing of the BNSF tracks at Belmont Road (County Route 2) by constructing an underpass for motor vehicles. Metra Commuter Rail and Amtrak also operate on these tracks. Belmont Road now consists of two lanes of traffic in either direction, with a tunnel for pedestrians on the west side of Belmont Road Eliminated at-grade crossing of BNSF tracks at Belmont Rd. – road underpass Built a tunnel for pedestrians Eliminated road/rail conflict

UNDER CONSTRUCTION

GS15a: 130 th and Torrence, Chicago Eliminate the at-grade crossings of the two Norfolk Southern main tracks with 130th Street and Torrence Ave. Existing bridge carrying two NICTD South Shore Line commuter rail tracks over NS tracks and Torrence Ave. re-built Eliminate conflict between railroad and access to Ford Plant Will eliminate road-rail conflicts

GS15a: 130 th and Torrence, Chicago NICTD Norfolk Southern 130 th St Brainard Ave Torrence Ave

GS15a: 130 th and Torrence, Chicago

KEEPING CREATE MOVING

CREATE Funding 2012 Single Largest Funding Advancement in CREATE History $211 M from Gov. Quinn’s IL Jobs Now Capital Program $155 M from the CREATE Partner Railroads $10.4 M in Federal TIGER IV funding Will design/construct GS6 at 25 th Avenue in Bellwood/Maywood Upgrade 11 City Viaducts Will allow all railway infrastructure components of CREATE’s Belt, Western Avenue, and East-West Corridors to be completed  with the exception of the mega-project at 75 th St. in Chicago to reconfigure Belt Junction

Questions? Joe Shacter – Director of Public and Intermodal Transportation