NSTX-U Collaboration Status and Plans for: University of California at Davis N.C. Luhmann, Jr., R. Barchfeld, C.W. Domier, C.M. Muscatello, M. Sohrabi.

Slides:



Advertisements
Similar presentations
PPPL,NFRI Study of Error Field and 3D Plasma Response in KSTAR J.-K. Park 1, Y. M. Jeon 2, In collaboration with J. E. Menard 1, K. Kim 1, J. H. Kim 2,
Advertisements

Potential Upgrades to the NBI System for NSTX-Upgrade SPG, TS NSTX Supported by Culham Sci Ctr U St. Andrews York U Chubu U Fukui U Hiroshima U Hyogo U.
Fast-Ion-D-Alpha and Solid-State NPA Diagnostics for NSTX-U NSTX-U Supported by Culham Sci Ctr York U Chubu U Fukui U Hiroshima U Hyogo U Kyoto U Kyushu.
Study of tearing mode stability in the presence of external perturbed fields Experimental validation of MARS-K/Q and RDCON codes Z.R. Wang 1, J.-K. Park.
NSTX-U Team Meeting Stefan Gerhardt Contributions from B. Stratton, R. Kaita, A. Diallo, and J. Hosea and the NSTX Research Team August 2014 Team Meeting.
NSTX-U T&T TSG Contributions to FY15 JRT NSTX-U Supported by Culham Sci Ctr York U Chubu U Fukui U Hiroshima U Hyogo U Kyoto U Kyushu U Kyushu Tokai U.
Team Meeting April 25, 2014 NSTX-U Construction Progress NSTX-U Supported by Culham Sci Ctr York U Chubu U Fukui U Hiroshima U Hyogo U Kyoto U Kyushu U.
Operations Notes Updates Since Last Team Meeting Stefan Gerhardt NSTX Team Meeting B318 January 3 rd, 2013 NSTX-U Supported by Culham Sci Ctr York U Chubu.
Particle control task force early run discussion R. Maingi, J. Canik Particle Control Task Force Meeting PPPL LSB B318 January 20, 2015 NSTX-U Supported.
NSTX-U Collaboration Status and Plans for: ORNL Boundary Physics and RF Research J.M. Canik, J.B.O. Caughman, J.-W. Ahn, S.J. Diem, T.K. Gray, D.L. Green,
Machine Installation and Construction Management Erik D. Perry Princeton Plasma Physics Laboratory NSTX Upgrade Project Office of Science Review LSB B318.
NSTX NSTX Team Meeting Jan. 3, 2013 NSTX Team Meeting Jan. 3, 2013 Culham Sci Ctr U St. Andrews York U Chubu U Fukui U Hiroshima U Hyogo U Kyoto U Kyushu.
NSTX Team Meeting May 28, 2008 Supported by Office of Science College W&M Colorado Sch Mines Columbia U Comp-X General Atomics INEL Johns Hopkins U LANL.
Quality Assurance Readiness for Operations Review Judy Malsbury, Head of QA Princeton Plasma Physics Laboratory NSTX Upgrade LSB B318 December 9-11, 2014.
NSTX-U Diagnostic Installations S.P. Gerhardt, B. Stratton, R. Kaita With help from A. von Halle, E. Perry, F. Jones NSTX-U Supported by Culham Sci Ctr.
Sustainment and Control Chapter Status Stefan Gerhardt 12/5/12 NSTX-U Supported by Culham Sci Ctr York U Chubu U Fukui U Hiroshima U Hyogo U Kyoto U Kyushu.
NSTX-U Program Update J. Menard For the NSTX-U Research Team NSTX-U Team Meeting PPPL – B318 June 5, 2015 NSTX-U Supported by Culham Sci Ctr York U Chubu.
ISTP (and other…) Update Stefan Gerhardt NSTX-U Monday Physics Meeting Feb. 20, 2015 B318 NSTX-U Supported by Culham Sci Ctr York U Chubu U Fukui U Hiroshima.
XP1518: RWM PID control optimization based on theory and experiment S. A. Sabbagh, J.W. Berkery, J.M Bialek Y.S. Park, (et al…) Department of Applied Physics,
EP-TSG session Meeting agenda et al. M. Podestà NSTX-U Research Forum 2015 EP-TSG session PPPL, Room B252 02/24/2015 NSTX-U Supported by Culham Sci Ctr.
Non-axisymmetric Control Coil Upgrade and related ideas NSTX Supported by V1.0 Culham Sci Ctr U St. Andrews York U Chubu U Fukui U Hiroshima U Hyogo U.
NSTX-U Collaboration Status and Plans for: Turbulence & Instability Studies - U. Wisconsin G. McKee, D. Smith, R. Fonck University of Wisconsin-Madison.
Current status of high k scattering system J. Kim 1, Y. Ren 2, K-C. Lee 3 and R. Kaita 2 1) POSTECH 2) PPPL 3) UC Davis NSTX Monday Physics Meeting LSB-318,
Supported by Office of Science NSTX S.M. Kaye for PPPL, U. Wisc., JHU, UCLA, UC Davis Groups NSTX-C-Mod Pedestal Workshop PPPL 7 Sept NSTX Capabilities.
NSTX-U Collaboration Status and Plans for: Charged Fusion Product Diagnostic FIU Werner U. Boeglin Ramona Perez, Alexander Netepenko, FIU D.S. Darrow PPPL.
1 Update on Run Schedule R. Raman NSTX Team Meeting PPPL, Princeton, NJ, 08 February, 2006 Work supported by DOE contract numbers DE-FG02-99ER54519 AM08,
RF Operations: Commissioning the RF systems and antenna conditioning J. Hosea et al. NSTX-U Supported by Culham Sci Ctr York U Chubu U Fukui U Hiroshima.
NSTX Supported by Culham Sci Ctr U St. Andrews York U Chubu U Fukui U Hiroshima U Hyogo U Kyoto U Kyushu U Kyushu Tokai U NIFS Niigata U U Tokyo JAEA Hebrew.
Radiative divertor with impurity seeding in NSTX V. A. Soukhanovskii (LLNL) Acknowledgements: NSTX Team NSTX Results Review Princeton, NJ Wednesday, 1.
NSTX Team Meeting July 21,, 2011 NSTX TF Update NSTX Team Meeting July 21, 2011 NSTX Supported by Culham Sci Ctr U St. Andrews York U Chubu U Fukui U Hiroshima.
NSTX Effects of NTSX Upgrades on DiagnosticsFebruary 8, NSTX Supported by College W&M Colorado Sch Mines Columbia U CompX General Atomics INEL Johns.
Prototype Multi-Energy Soft X-ray Diagnostic for EAST Kevin Tritz Johns Hopkins University NSTX-U Monday Physics Meeting PPPL, Princeton, NJ June 25 th,
Direct measurement of plasma response using Nyquist Contour Z.R. Wang 1, J.-K. Park 1, M. J. Lanctot 2, J. E. Menard 1,Y.Q. Liu 3, R. Nazikian 1 1 Princeton.
NSTX-U Program Update J. Menard NSTX-U Team Meeting B318 May 7, 2013 NSTX-U Supported by Culham Sci Ctr York U Chubu U Fukui U Hiroshima U Hyogo U Kyoto.
NSTX-U Supported by Culham Sci Ctr York U Chubu U Fukui U Hiroshima U Hyogo U Kyoto U Kyushu U Kyushu Tokai U NIFS Niigata U U Tokyo JAEA Inst for Nucl.
ASC SPG NSTX-U Supported by Culham Sci Ctr York U Chubu U Fukui U Hiroshima U Hyogo U Kyoto U Kyushu U Kyushu Tokai U NIFS Niigata U U Tokyo JAEA Inst.
ASC Five Year Plan Chapter Status Stefan Gerhardt NSTX-U Supported by Culham Sci Ctr York U Chubu U Fukui U Hiroshima U Hyogo U Kyoto U Kyushu U Kyushu.
Wave Heating and Current Drive TSG: XMP for Recomissioning the HHFW System R.J. Perkins, J. C. Hosea Theory & Modeling: N. Bertelli NSTX-U Supported by.
NSTX Upgrade Project – Final Design Review June , NSTX Supported by College W&M Colorado Sch Mines Columbia U CompX General Atomics INEL.
NSTX-U Construction Erik Perry Princeton Plasma Physics Laboratory NSTX Upgrade Readiness to Operate Review LSB B318 December 9-11, 2014 NSTX-U Supported.
M&P TSG Prioritization for FY2015 and campaign startup M.A. Jaworski, C.H. Skinner, R. Kaita NSTX-U Science and Topical Science Group organizational meeting.
NSTX-U Collaboration Status and Plans for: X Science LLC Ricky Maqueda NSTX-U Collaborator Research Plan Meetings PPPL – LSB B318 April / May 2014 NSTX-U.
NSTX Upgrade Project – Final Design Review June , NSTX Supported by Vacuum Pumping, Gauging and RGA Systems W. Blanchard Princeton Plasma.
Safety Jerry Levine Princeton Plasma Physics Laboratory NSTX Upgrade Project Office of Science Review LSB B318 May 2 - 3, 2012 NSTX-U Supported by Culham.
Macroscopic Stability TSG Pre-forum Meeting #1 J.W. Berkery Department of Applied Physics, Columbia University, New York, NY NSTX-U Supported by Culham.
NSTX Team Meeting February 7, 2007 Supported by Office of Science College W&M Colorado Sch Mines Columbia U Comp-X General Atomics INEL Johns Hopkins U.
EP-TSG: draft plans for commissioning & first research phases of NSTX-U operation M. Podestà, D. Liu, N. Gorelenkov, N. Crocker for the NSTX-U EP-TSG Pre-Forum.
Supported by Office of Science NSTX H. Yuh (Nova Photonics) and the NSTX Group, PPPL Presented by S. Kaye 4 th T&C ITPA Meeting Culham Lab, UK March.
Development and characterization of intermediate- δ discharge with lithium coatings XP-919 Josh Kallman XP Review - ASC Feb 2, 2009 NSTX Supported by College.
NSTX-U Collaboration Plans for UCLA PI: Neal A. Crocker Co-PI: Prof. Troy Carter Grad. Student (planned 2 nd year onward) PPPL Research Contacts and Collaborators:
NSTX-U Collaboration Status and Plans for: Local Helicity Injection - U. Wisconsin R.J. Fonck,B. T. Lewicki, A. J. Redd University of Wisconsin-Madison.
Wave Heating and Current Drive TSG: XMP/XPs for the 2015 NSXT-U Campaign RF-TSG R.J. Perkins, J. C. Hosea Theory & Modeling: N. Bertelli Univ. Rep: P.
NSTX Team Meeting December 21, 2009 College W&M Colorado Sch Mines Columbia U Comp-X General Atomics INEL Johns Hopkins U LANL LLNL Lodestar MIT Nova Photonics.
Effect of 3-D fields on edge power/particle fluxes between and during ELMs (XP1026) A. Loarte, J-W. Ahn, J. M. Canik, R. Maingi, and J.-K. Park and the.
NSTX-Upgrade Magnetics And Related Diagnostics SPG NSTX Supported by Culham Sci Ctr U St. Andrews York U Chubu U Fukui U Hiroshima U Hyogo U Kyoto U Kyushu.
NSTX NSTX Team Meeting May 7, 2013 NSTX Team Meeting May 7, 2013 Culham Sci Ctr U St. Andrews York U Chubu U Fukui U Hiroshima U Hyogo U Kyoto U Kyushu.
First results of fast IR camera diagnostic J-W. Ahn and R. Maingi ORNL NSTX Monday Physics Meeting LSB-318, PPPL June 22, 2009 NSTX Supported by College.
NSTX-U Disruption PAM Working Group – Controlled Shutdown XP Discussion S. A. Sabbagh and R. Raman Department of Applied Physics, Columbia University,
Upgrades to PCS Hardware (Incomplete) KE, DAG, SPG, EK, DM, PS NSTX Supported by Culham Sci Ctr U St. Andrews York U Chubu U Fukui U Hiroshima U Hyogo.
Presently Planned Vacuum-Side Diagnostics for the NSTX-Upgrade Center Column NSTX Supported by Culham Sci Ctr U St. Andrews York U Chubu U Fukui U Hiroshima.
Preliminary Results from XP1020 RFA Measurements J.W. Berkery Department of Applied Physics, Columbia University, New York, NY, USA NSTX Monday Physics.
NSTX NSTX Team Meeting –Masa Ono August 15, 2014 NSTX-U Team Meeting August 15, 2014 Culham Sci Ctr U St. Andrews York U Chubu U Fukui U Hiroshima U Hyogo.
NSTX-U Collaboration Status and Plans for: M.I.T. Plasma Science and Fusion Center Abhay K. Ram, Paul Bonoli, and John Wright NSTX-U Collaborator Research.
Monitoring impact of the LLD Adam McLean, ORNL T. Gray, R. Maingi Lithium, TSG group preliminary research forum PPPL, B252 Nov. 23, 2009 NSTX Supported.
Research Operations Update Stefan Gerhardt NSTX-U Team Meeting B-318 December 4 th, 2014 NSTX-U Supported by Culham Sci Ctr York U Chubu U Fukui U Hiroshima.
Comments on HC Measurements for NSTX- Upgrade SPG CS Upgrade Meeting 11/2/11 NSTX Supported by Culham Sci Ctr U St. Andrews York U Chubu U Fukui U Hiroshima.
J-W. Ahn 1 K.F. Gan 2, F. Scotti 3, R. Maingi 1, J.M. Canik 1, T.K. Gray 1, J.D. Lore 1, A.G. McLean 4, A.L. Roquemore 3, V.A. Soukhanovskii 4 and the.
Neutron diagnostic calibration transfer XMP D. Darrow and the NSTX Research Team XMP & XP review meeting Control Room Annex June 11, 2015 NSTX-U Supported.
Profiles Variations in NSTX-U and their Potential Impact on Equilibrium and Stability Magnetoboss 12/6/2013 NSTX-U Supported by Culham Sci Ctr York U Chubu.
NSTX NSTX Upgrade Project – Final Design ReviewJune 22-24, NSTX Supported by College W&M Colorado Sch Mines Columbia U CompX General Atomics INEL.
Presentation transcript:

NSTX-U Collaboration Status and Plans for: University of California at Davis N.C. Luhmann, Jr., R. Barchfeld, C.W. Domier, C.M. Muscatello, M. Sohrabi NSTX-U Collaborator Research Plan Meetings April 25, 2014 NSTX-U Supported by Culham Sci Ctr York U Chubu U Fukui U Hiroshima U Hyogo U Kyoto U Kyushu U Kyushu Tokai U NIFS Niigata U U Tokyo JAEA Inst for Nucl Res, Kiev Ioffe Inst TRINITI Chonbuk Natl U NFRI KAIST POSTECH Seoul Natl U ASIPP CIEMAT FOM Inst DIFFER ENEA, Frascati CEA, Cadarache IPP, Jülich IPP, Garching ASCR, Czech Rep Coll of Wm & Mary Columbia U CompX General Atomics FIU INL Johns Hopkins U LANL LLNL Lodestar MIT Lehigh U Nova Photonics ORNL PPPL Princeton U Purdue U SNL Think Tank, Inc. UC Davis UC Irvine UCLA UCSD U Colorado U Illinois U Maryland U Rochester U Tennessee U Tulsa U Washington U Wisconsin X Science LLC FIReTIP High k θ

NSTX-U NSTX-U Collaboration Status and Plans - April / May 2014 Research plans and needs for this year (FY2014) in preparation for NSTX-U operations in FY2015 Reconfigure FIReTIP system –FIReTIP chord #1 (with two additional chords planned) to employ entrance window on Bay G, with internal retroreflector on Bay B Will provide core plasma density monitoring, and density calibration of Thomson scattering system Design new optics layout; needs to coexist with other diagnostics on Bay G –CO 2 and FIR lasers to be relocated to “cage” area outside test cell Dielectric-coated waveguides (2) plumbed through radiation wall to couple FIR beams to Bay G launch optics Develop high power, high k θ source –Optimize CO 2 -pumped FIR laser performance at 693 GHz, to be launched into Bay G as high k θ probe source Will coexist with the reconfigured FIReTIP system on a 3-level optical table in NSTX cage outside test cell Corrugated waveguides remachined at UC Davis for low loss at 693 GHz, and plumbed through radiation wall to couple FIR beam to Bay G launch optics 2

NSTX-U NSTX-U Collaboration Status and Plans - April / May 2014 Research Plans for FY2015 Commission and operate FIReTIP system –Collect first data with redesigned system and verify data integrity of FIReTIP chord #1 –Install heterodyne HeNe laser interferometer for real-time vibration compensation –Develop and test prototype real-time feedback control electronics Fabricate and characterize high k θ optics and receivers –Fabricate 4x1 pixel array receivers FIR subharmonic mixer arrays fabricated jointly by UC Davis in collaboration with researchers at Hübner GmbH –Design and fabricate launch and imaging optics Translatable optics and multi-element receiver provides access to both k θ and k r wavenumbers in the NSTX core –Characterize and optimize system performance at UC Davis 3

NSTX-U NSTX-U Collaboration Status and Plans - April / May 2014 Research Plans for FY2016 Forward Install real-time feedback control electronics on FIReTIP –Feedback control software to be developed by PPPL Install and commission high k θ system –Install high power FIR laser source in NSTX cage area –Install source optics and steering mirrors on Bay G –Install imaging optics and receiver electronics on Bay L –Collect first data with redesigned system and commission system Develop Microwave Imaging Reflectometer (MIR) system –Design and modeling carried out under Diagnostics program –Current contract funding ends on Feb. 28, 2016; fabrication of imaging hardware and electronics to take place in FY2016 (assuming successful renewal by DoE), with installation in FY2017 4

NSTX-U NSTX-U Collaboration Status and Plans - April / May 2014 Microwave imaging reflectometry (MIR) to provide 2D images of density fluctuations in NSTX-U Envisage 12 (poloidal) x 8 (radial) system to make localized measurements of low-k density fluctuations over a wide extent of the NSTX-U plasma MIR optics to share the same large aperture (34 cm x 13 cm) window employed by the high k θ scattering system Preliminary optics design underway and operating frequency range under discussion 5 t0t0 +2 µs +4 µs +6 µs +8 µs+10 µs +12 µs +14 µs Mapping to DIII-D cross-section 12x4 system implemented on DIII-D (to be upgraded to 12x8 and eventually to 12x16) Example from DIII-D: type-I ELM precursor Rich spectrum of inter-ELM modes Time-lapse images show vertical rotation of encircled 58 kHz mode through viewing window ELM

NSTX-U NSTX-U Collaboration Status and Plans - April / May 2014 Ideas to enhance participation in NSTX-U research/program by U.S. Universities, early-career researchers, and students Offer low cost housing options for graduate students working on NSTX-U –Possibility to allow graduate students outside of Princeton University to have access to Princeton University graduate housing? Offer introductory seminar(s) on NSTX-U –Would improve the learning curve for inexperienced graduate students and assimilate them into the facility quicker 6

NSTX-U NSTX-U Collaboration Status and Plans - April / May 2014 Highest-priority incremental measurement capability (For diagnostic solicitation grantees funded for ) New FIReTIP Mixers –FIReTIP was designed and operated with the 2.54 THz corner-cube mixers from the TFTR MIRI system because of funding constraints –Additional funds would allow these whisker-contacted mixers to be replaced with modern waveguide mixers Will increase signal levels by dB, yielding significantly increased S/N ratios and enhanced density fluctuation sensitivity and provide increased reliability due to their robustness Additional high k θ receiver array –Initial high-k θ system (to be installed and commissioned in FY2016) to consist of one 4-element poloidal array –Additional funds would permit fabrication of a second 4-element array, permitting simultaneous 2-D imaging (2 radial x 4 poloidal channels) Second array to be installed together with the first array in FY2016 7