Maryland State Highway Administration Office of Structures Maryland State Highway Administration Office of Structures West Nursery Road over MD 295 (Baltimore-

Slides:



Advertisements
Similar presentations
Replacement of the Queens Approach Bronx-Whitestone Bridge
Advertisements

Gordons Corner Road Over US Route 9 Mahesh Patel, P.E. George Afful, P.E. Gregory Bitsko, P.E.
New York State Department of Transportation Region 11 Reconstruction of Jamaica Avenue Bridge over I-678 Van Wyck Expressway The Roll-in/Roll Out Method.
Work Zone Impact Strategies Module 6. TMP Overview3 Identification of TMP Strategies Should be based on: type of work zone traffic conditions anticipated.
Bob Grubbs Lead Bridge Engineer ODOT Region 3, Tech Center Lessons Learned FAST 14, Boston MA FHWA Highways for Life Showcase.
SR Lititz Pike Bridge Replacement Note: Dates indicated in this presentation are estimated based on the contractors current schedule and does.
Project Description and Needs Lincoln Way Widening Addition of a center-turn lane and safety improvements to the grade and horizontal alignment. Needs.
Executive Summary Introduction In 1988, by virtue of State Statute , the Nebraska State Legislature first assigned the Nebraska Department.
1 Designated Historic Landmark Opened to Traffic in 1883 Construction is Scheduled Overnight Construction Limited Weekend Construction.
Delmar Boulevard bridge replacement over Interstate 170.
Maryland Avenue and Arkwright Street Jerry Auge, PE Project Manager Ramsey County June 25, 2013.
DDI Traffic Informational Session Town of Cornelius Lake Norman Chamber of Commerce June 11, 2014.
State Project No /195 Rehabilitation of Bridge Nos and I-84 over Marion Ave Southington, Connecticut Rehabilitation of Bridge Nos.
Bridge over BNSF Railroad 7 km East of Windham - East Bridge Replacement Project Using Accelerated Bridge Construction.
Project Construction Update August 30, 2011 I-5 North Stockton Freeway Widening and Pavement Reconstruction Project Between Dr. Martin Luther King Jr.
75 Express Lanes Segment D Construction From South of Sheridan Street to North of Griffin Road Presentation to Ivanhoe Community August 27, 2014.
TRAILS AS TRANSPORTATION Design & Construction Michael J. Kubek, P.E. Ohio Department of Transportation, District 12 Production Administrator.
Utah’s Use of CMGC & Project Delivery
Bridge No over the Spokane River at State Line (looking south) 1 of 19.
S.R. 256 Road Reconstruction Project From City of Austin to S.R. 203 Thursday, February 6, 2014 Austin Elementary School 6:00 p.m.
State of Florida Department of Transportation SR 7 (US 441) Value Engineering Study September 24-28, 2001 Segment III - From North of Hollywood Blvd to.
SR-528 (Beach Line)/ SR-3 (Courtenay Blvd) Emergency Bridge Repair January 21, 2011.
Route 28 South of I-66 Corridor Safety and Operations Study Technical Committee Meeting #2 June 25,
I-65 Added Travel Lanes Project in Tippecanoe County
Region One Bridge Design – Robert Jose Tovar “If I have seen further it is by standing upon the shoulders of giants” – Isaac Newton.
Detours – Selection and Design Highways & Engineering Conference March 2, 2006.
Bridge Rehabilitation W Interstate 290 over CSX Railroad and 4 City Streets I-290 Viaduct Reconstruction.
ABC/PBES COSTS by Mary Lou Ralls, P.E., Principal Ralls Newman, LLC (formerly Texas State Bridge Engineer)
MaSSENA LATERAL BRIDGE SLIDE CASE STUDY
4 TH STREET BRIDGE Pueblo, Colorado December 2006 Project Overview.
Public Information Meeting Rehabilitation of Bridge No Flat Rock Hill Road over I-95 Old Lyme, Connecticut Rehabilitation of Bridge No Flat.
Office of Highway Safety Bridge Inspections Dan Walsh.
Determining Innovative Contracting Methods to Reduce User Costs Stuart Thompson Utah Technology Transfer Center.
US 1 COLLEGE PARK – SEGMENT 1 FROM COLLEGE AVE/REGENTS DRIVE TO MD 193 (UNIVERSITY BLVD) Presentation to College Park City Council August 5,
Page 1 MINISTRY OF TRANSPORTATION Cyrville Road Bridge Replacement at Highway 417 (Ottawa Queensway) Detail Design Study Group Work Project
Enosburg BRO 1448(40) Bridge 48 on TH 2 Over the Tyler Branch Alternatives Presentation.
U.S. 24 over Tippecanoe River Bridge Replacement
Capital Improvement Program. During the Annual Strategic Action Plan (SAP) evaluation, long-term needs and priorities are identified by City Council Capital.
Current Construction Projects Major Projects Pinellas County.
October 8, 2008 Spokane, WA Doug Walters, P.E. King County DOT
St Johnsbury BF 7000(20) Bridge 6 on VT Route 2B over the Lamoille Valley Rail Trail Presenter: John Byatt, PE Consultant Project Manager.
STATE ROUTE 1 ALAMITOS BAY BRIDGE IMPROVEMENT PROJECT SCOPING MEETING AUGUST 5, :00 p.m.Open House 6:30 p.m.Presentation 7:00 p.m.Public Comment.
Office of Traffic, Safety and Technology Module 4 Work Zone Applications Traffic Control Plan Development Course.
Standardizing Transportation Project Submittals to DNR Team Jim Doperalski WDNR Mike Halsted WDNR Janet Smith WisDOT Troy Stapelmann WisDOT Standard Submittal.
FULL FREEWAY CLOSURES RECENT SUCCESS STORIES IN KENTUCKY.
Data Palooza Workshop May 9, 2013 Rabinder Bains, FHWA – Office of Policy and Government Affairs.
Tom Norton, Executive Director Colorado Department of Transportation American Association of State Highway and Transportation Officials September 9, 2003.
Enosburg BRO 1448(40) Bridge 48 on TH 2 Over the Tyler Branch Public Information Meeting.
MD 97 (Georgia Avenue) at Randolph Road Purpose Improve vehicular, bicyclists and pedestrian safety Improve Levels of Service Increase capacity Improve.
1 Rehabilitation of 188 th Street over Grand Central Parkway PIN: X Contract #: D Deck Replacement October 2015.
Bristol BF 021-1(33) Regional Concerns Meeting VT Route 116 – Bridge #12 over Baldwin Creek April 27, 2015.
Washington Thoroughfare Study Proposed Improvement of Washington Street Hainesville Road to Lake Street Lake County Hainesville Road Lake Street Washington.
Design Criteria CTC 440. Objectives Know what “design criteria” means Determine design criteria for various types of facilities.
H t t p : / / o p s. f h w a. d o t. g o v / w z / w o r k z o n e. h t m Slide 1 QuickZone — A Work Zone Delay Estimation and Analysis Tool Matthew H.
Utah Research Benefits Value of Research Taskforce July 29, 2015 Cameron Kergaye Utah Department of Transportation.
VT 100 over the Mad River Bridge Replacement July 13, 2015.
Route 1 Olden Avenue & Mulberry Street Hyperbuild Project.
1 MD 5 (Point Lookout Road) Leonardtown (Phase 1) Intersection Reconstruction At Abell and Moakley Streets Informational Meeting January 19, 2016.
Delmar Boulevard bridge replacement over Interstate 170.
Grand Valley Metropolitan Council March 3, 2016 Erick Kind Region Engineer MDOT-Grand Region.
U.S. ROUTE 202 – SECTION 300 IMPROVEMENT PROJECT East Whiteland Township – Tredyffrin Township Chester County TMACC Information Session January 24, 2011.
Maintenance and Temporary Traffic Control
Technical Issues Design Status Due Diligence Materials Tony DeVito, Project Director Jan. 28, 2016 I-70 East Project.
Integrity - Competence - Service Hogan Road/Exit 187 Proposed Improvements Public Informational Meeting June 9, 2016.
GEORGE WASHINGTON HIGHWAY WIDENING PROJECT E.V. WILLIAMS, INC.
Molly Kline, Project Manager
US26: Cornelius Pass Rd -185th Ave
I-69 Southwest/I-610 West Loop Interchange Reconstruction
Contract 60X10 Informational Meeting Weber I-55
S.R. 26 Road Rehabilitation in Clinton County
Presentation transcript:

Maryland State Highway Administration Office of Structures Maryland State Highway Administration Office of Structures West Nursery Road over MD 295 (Baltimore- Washington Parkway) Superstructure Replacement Project utilizing SPMTs

Maryland State Highway Administration Office of Structures Maryland State Highway Administration Office of Structures Project Location Baltimore/Washington Metropolitan Area

Maryland State Highway Administration Office of Structures Maryland State Highway Administration Office of Structures Project Location

Maryland State Highway Administration Office of Structures Maryland State Highway Administration Office of Structures Existing Bridge Elevations Bridge No (NB) Bridge No (SB)

Maryland State Highway Administration Office of Structures Maryland State Highway Administration Office of Structures Existing Bridge Condition Extensive Patches in Bridge Deck Sidewalk and Deck Deterioration

Maryland State Highway Administration Office of Structures Maryland State Highway Administration Office of Structures Existing Bridge Condition Cracking in Underside of Bridge Deck

Maryland State Highway Administration Office of Structures Maryland State Highway Administration Office of Structures Design Parameters / Site Conditions Superstructure Replacement Long Term Detour Not Allowed 2 of 4 lanes must be maintained on West Nursery Rd. Large median existed between MD 295 NB and SB lanes (79’, 87’ including shoulders) Vertical underclearance extremely low (15’-9”)

Maryland State Highway Administration Office of Structures Maryland State Highway Administration Office of Structures Decision Analysis Musts 2 of 4 lanes maintained at all times Able to carry HL-93 live loads Maintain existing vertical under clearance (15’-9”)

Maryland State Highway Administration Office of Structures Maryland State Highway Administration Office of Structures 8 Alternatives were Initially Evaluated Deck Replacement / Superstructure Replacement / Complete Replacement Widening / No Widening Single Stage / Two Stage Construction Sequence

Maryland State Highway Administration Office of Structures Maryland State Highway Administration Office of Structures Decision Analysis Matrix

Maryland State Highway Administration Office of Structures Maryland State Highway Administration Office of Structures Selected Initial Alternative: Total Superstructure Replacement Matching Existing Bridge Geometry One phase construction utilizing temporary bridge 12 month estimated duration of construction Reduces lane capacity by 50% for duration of project Requires construction of temporary roadway, reconfiguration of ramps Requires right of way

Maryland State Highway Administration Office of Structures Maryland State Highway Administration Office of Structures Proposed Typical Section

Maryland State Highway Administration Office of Structures Maryland State Highway Administration Office of Structures Satellite View of Location

Maryland State Highway Administration Office of Structures Maryland State Highway Administration Office of Structures Bridge Pilaster

Maryland State Highway Administration Office of Structures Maryland State Highway Administration Office of Structures Rehabilitation Cost Comparison Temporary Bridge Estimated cost of temporary bridge = $800,000Estimated cost of temporary bridge = $800,000 Reconfigure rampsReconfigure ramps Temporary approach roadwayTemporary approach roadway Right-of-wayRight-of-way Demo over trafficDemo over traffic Reduced Traffic lanesReduced Traffic lanes Total cost = $800, SPMTs Bid Prices SPMTs = $450,000SPMTs = $450,000 Grade Median = $5,700Grade Median = $5,700 Rebuild Shoulders = $120,000Rebuild Shoulders = $120,000 Temporary Towers = $290,000Temporary Towers = $290,000 Total Cost = $865,700

Maryland State Highway Administration Office of Structures Maryland State Highway Administration Office of Structures Road User Costs Total cost of reducing West Nursery Road from 4 lanes to 2 lanes = $2000 per day Reduced lanes for approximately 7 of 12 months = 7 x 30 x $2000 = $420,000

Maryland State Highway Administration Office of Structures Maryland State Highway Administration Office of Structures Public Outreach Mass mailing of project brochure Public outreach meeting Community liaison met individually with major businesses in corridor Presented at BWI business partnership

Maryland State Highway Administration Office of Structures Maryland State Highway Administration Office of Structures MD 295 Detour Plan

Maryland State Highway Administration Office of Structures Maryland State Highway Administration Office of Structures West Nursery Road Detour Plan

Maryland State Highway Administration Office of Structures Maryland State Highway Administration Office of Structures B r i d g e S t a g i n g A r e a Sequence of Construction

Maryland State Highway Administration Office of Structures Maryland State Highway Administration Office of Structures Design Process Details →Design, Bid, Build Process →Bridge moving company had to be one that was preapproved →Extensive coordination with moving company throughout the design process and with Utah DOT →Moves will take place on two consecutive weekends →Roadway Rentals

Maryland State Highway Administration Office of Structures Maryland State Highway Administration Office of Structures Roadway Rentals A traffic study was performed and determined that the following closure time for West Nursry Road and detour of MD 295 were acceptable: MD 295 Friday 11 pm to Saturday 6 am Saturday 11 pm to Sunday 8 am West Nursery Road Friday 10 pm to Sunday 8 am

Maryland State Highway Administration Office of Structures Maryland State Highway Administration Office of Structures Roadway Rentals During Designated Period Roadway Rentals Outside Designated Period

Maryland State Highway Administration Office of Structures Maryland State Highway Administration Office of Structures Established Bid Item

Maryland State Highway Administration Office of Structures Maryland State Highway Administration Office of Structures Example During weekend no. 1 when moving the existing bridge over MD 295 SB into the median, MD 295 SB is opened at 9 AM Saturday instead of 6 AM. All other time constraints in weekend no. 1 are met. During weekend no. 2 when moving the new bridge over MD 295 NB into place, West Nursery Road is opened at 6 am Sunday instead of 8 am. All other time constaints in weekend no. 2 are met.

Maryland State Highway Administration Office of Structures Maryland State Highway Administration Office of Structures Example

Maryland State Highway Administration Office of Structures Maryland State Highway Administration Office of Structures Current Status

Maryland State Highway Administration Office of Structures Maryland State Highway Administration Office of Structures Current Status

Maryland State Highway Administration Office of Structures Maryland State Highway Administration Office of Structures Current Status See live construction on the web: →Projects and studies →SHA Projects Page →Anne Arundel County →West Nursery Road