Peter Chochula CERN-ALICE ALICE DCS Workshop, CERN September 16, 2002 DCS – Frontend Monitoring and Control.

Slides:



Advertisements
Similar presentations
ALICE DCS Workshop Day 10th September The Cooling and Ventilation Control System D. Blanc, Process Control Team and Project Leader CERN ST/CV-Design.
Advertisements

The Detector Control System – FERO related issues
Sezione di Bari September 16, 2002D. Elia - DCS workshop / ALICE week 1 SPD PS system and Controls Domenico Elia, INFN-Bari.
Peter Chochula CERN-ALICE ALICE DCS Workshop, CERN September 16, 2002 DCS – Frontend Monitoring and Control.
TPC-RO DCS set-up PVSS main(s) Iseg OPC server HV Iseg crates (3)LV Wiener crates (22) CAN bus Interface to FEE -temp.mon -I &V mon. Wiener OPC server.
TPC DETECTOR SEGMENTATION OF THE READOUT PLANE LATERAL VIEW OF THE TPC
Peter Chochula, January 31, 2006  Motivation for this meeting: Get together experts from different fields See what do we know See what is missing See.
HEP2005, Lisboa July 05 Roberto Campagnolo - CERN 1 HEP2005 International Europhysics Conference on High Energy Physics ( Lisboa-Portugal,
1 ALICE Detector Control System (DCS) TDR 28 January 2004 L.Jirdén On behalf of ALICE Controls Coordination (ACC): A.Augustinus, P.Chochula, G. De Cataldo,
Supervision of Production Computers in ALICE Peter Chochula for the ALICE DCS team.
Test Systems Software / FEE Controls Peter Chochula.
Workshop Goals MICE Controls and Monitoring Workshop September 25, 2006 A. Bross.
Jorge Mercado - I3HP Topical Workshop - St. Andrews The ALICE Transition Radiation Detector (TRD) Read-Out Electronics J. Mercado Physikalisches.
1 FEE Installation & Commissioning TPC Meeting, 21 April 2006 L. Musa.
Control and Monitoring of Front-end and Readout Electronics in ALICE Peter Chochula.
Sensor/Actuator Manager Candidates CPAC/NeSSI Workshop May 5, 2005, Seattle,WA by Softing North America Ken Hoover.
Jochen Thäder – Kirchhoff Institute of Physics - University of Heidelberg 1 HLT for TPC commissioning - Setup - - Status - - Experience -
UNIVERSITY OF BERGEN DEPARTMENT OF PHYSICS 1 UiB DR 2003 High Level API for the TPC-FEE control and configuration.
RCU Status 1.RCU hardware 2.Firmware/Software 3.Test setups HiB, UiB, UiO.
The Detector Safety System for LHC Experiments Stefan Lüders ― CERN EP/SFT & IT/CO CHEP03 ― UC San Diego ― March 27 th, 2003.
3 June 2003U. Frankenfeld1 TPC Detector Control System Status.
LHC Gas Control System Stefan Haider EP-TA1-GS ALICE DCS workshop, S.Haider2 Outline Introduction and working philosophyIntroduction and working.
Normal text - click to edit RCU – DCS system in ALICE RCU design, prototyping and test results (TPC & PHOS) Johan Alme.
DCS Detector Control System Hardware Dirk Gottschalk Volker Kiworra Volker Lindenstruth Vojtech Petracek Marc Stockmeier Heinz Tilsner Chair of Computer.
Towards a Detector Control System for the ATLAS Pixeldetector Susanne Kersten, University of Wuppertal Pixel2002, Carmel September 2002 Overview of the.
1 Status & Plans DCS WS L.Jirdén. 2 DCS Planning FINAL INST COM- MISS BEAM OP PRE- INST DET DCS URD ENG. SOLUTIONS PROTOTYPE SUBSYSTEM.
1 ALICE Control System ready for LHC operation ICALEPCS 16 Oct 2007 L.Jirdén On behalf of the ALICE Controls Team CERN Geneva.
The High-Level Trigger of the ALICE Experiment Heinz Tilsner Kirchhoff-Institut für Physik Universität Heidelberg International Europhysics Conference.
Update on Database Issues Peter Chochula DCS Workshop, June 21, 2004 Colmar.
SALTRO TPC readout system Presented by Ulf Mjörnmark Lund University 1.
André Augustinus 10 September 2001 DCS Architecture Issues Food for thoughts and discussion.
1 Responsibilities & Planning DCS WS L.Jirdén.
Workshop on the Use of Ethernet as a Fieldbus CERN, 28 September 2001 Use of Ethernet in the control systems of the cooling and ventilation infrastructure.
André Augustinus 17 June 2002 Technology Overview What is out there to fulfil our requirements? (with thanks to Tarek)
108 Mar 2007L. Musa TPC Commissioning ALICE Technical Forum, CERN, 8 th March 2007 L. Musa Outline Pre-commissioning above ground (2006) Preparing for.
P. Chochula ALICE Week Colmar, June 21, 2004 Status of FED developments.
Bernardo Mota (CERN PH/ED) 17/05/04ALICE TPC Meeting Progress on the RCU Prototyping Bernardo Mota CERN PH/ED Overview Architecture Trigger and Clock Distribution.
André Augustinus 10 March 2003 DCS Workshop Detector Controls Layout Introduction.
Management of the LHCb DAQ Network Guoming Liu * †, Niko Neufeld * * CERN, Switzerland † University of Ferrara, Italy.
Status report on the development of a readout system based on the SALTRO-16 chip Leif Jönsson Lund University LCTPC Collaboration Meeting
Overview of DAQ at CERN experiments E.Radicioni, INFN MICE Daq and Controls Workshop.
F.Carena, CERN/ALICE The ALICE Experiment Control System F. Carena / CERN-PH.
PHOS APD Bias Control Goal: To develop software for the PHOS APD bias control that uses the agreed ALICE standards for detctor control and coniguration.
Alice DCS workshop S.Popescu ISEG Crate controller + HV modules ISEG HV modules 12 Can bus PVSS OPC Client 1 Generic OPC Client Iseg OPC.
Management of the LHCb Online Network Based on SCADA System Guoming Liu * †, Niko Neufeld † * University of Ferrara, Italy † CERN, Geneva, Switzerland.
DCS Workshop, CERN MARCH ACORDE (Alice Cosmic ray detector) 60 scintillator modules (120 HV channels) Each module will have two scintillator counters.
DCS overview - L.Jirdén1 ALICE ECS/DCS – project overview strategy and status L.Jirden u Organization u DCS system overview u Implementation.
Dcs meeting, CERN, Mar 13  14, HV Control box HV Box from Athens Kai Schweda, University of Heidelberg P. Mantzaridis, A. Markouizos, P. Mitseas,
ARCHITECTURE. PRR November x 32 PADs Up to 26 or 3 x 17 MANU BOARD. PATCH BUS Translator Board. FEE DETECTOR Up to 100 PATCH BUS per detector. MANU.
Management of the LHCb DAQ Network Guoming Liu *†, Niko Neufeld * * CERN, Switzerland † University of Ferrara, Italy.
Status of Integration of Busy Box and D-RORC Csaba Soós ALICE week 3 July 2007.
JBMCambridge Workshop 6th to 7th January DAQ-DCS Communication.
R.Divià, CERN/ALICE 1 ALICE off-line week, CERN, 9 September 2002 DAQ-HLT software interface.
CONFIGURATION OF FERO IN ALICE Peter Chochula 7 th DCS Workshop, June 16, 2003.
Summary of TPC/TRD/DCS/ECS/DAQ meeting on FERO configuration CERN,January 31 st 2006 Peter Chochula.
André Augustinus 17 June 2002 Detector URD summaries or, what we understand from your URD.
Marc R. StockmeierDCS-meeting, CERN DCS status ● DCS overview ● Implementation ● Examples – DCS board.
COMPASS DAQ Upgrade I.Konorov, A.Mann, S.Paul TU Munich M.Finger, V.Jary, T.Liska Technical University Prague April PANDA DAQ/FEE WS Игорь.
The ALICE TPC Readout Control Unit 10th Workshop on Electronics for LHC and future Experiments 13 – 17 September 2004, BOSTON, USA Carmen González Gutierrez.
Scalable Readout System Data Acquisition using LabVIEW Riccardo de Asmundis INFN Napoli [Certified LabVIEW Developer]
Peter Chochula Calibration Workshop, February 23, 2005
LHC experiments Requirements and Concepts ALICE
Status of the Front-End Electronics and DCS for PHOS and TPC
PCI BASED READ-OUT RECEIVER CARD IN THE ALICE DAQ SYSTEM
TPC Detector Control System
TPC Electronics Meeting, 13/01/05 Carmen González Gutiérrez
TPC Electronics Meeting - DDL related Software -
Presentation transcript:

Peter Chochula CERN-ALICE ALICE DCS Workshop, CERN September 16, 2002 DCS – Frontend Monitoring and Control

Peter Chochula CERN-ALICE ALICE DCS Workshop, CERN September 16, 2002 FEE Architectures in Alice DETECTOR Control (setup of DCS Parameters…) Monitoring (Temp, I, V, Status…) DCS Supervisory Layer A/D Conversion (e.g. PLC…) Detector-DCS “Shared” architecture Detector “private” architecture Standard Software Interface DCS “private” architecture HARDWARE INTERFACE PRIVATE LINK FIELDBUSETHERNET… PRIVATE LINK FIELDBUSETHERNET…

Peter Chochula CERN-ALICE ALICE DCS Workshop, CERN September 16, 2002 Example: TRD FEE Design Readout chamber MCM ADCs (Temp, I,V) MCM Ethernet (TCPIP) DCS ADC (Humidity, I,V) Control Workstation DCS Voltage Regulators Both Control and Monitoring based on TCP/IP Ethernet Connection

Peter Chochula CERN-ALICE ALICE DCS Workshop, CERN September 16, 2002 Example: FEE in TPC Readout Chamber FEC DCS Network Profibus (Ethernet…) RCU Both Control and Monitoring based on Fieldbus

Peter Chochula CERN-ALICE ALICE DCS Workshop, CERN September 16, 2002 Configuration via DDL initiated by DAQ DAQ initiates FEE setup (by sending a command) Acknowledge DAQ starts polling the status Not Ready Ready Control CPU recognizes the request Control CPU informs the DCS DAQ DDL Local Control DCS + FEE FEE Ready DCS releases the equipment and confirms the request Control CPU informs the DCS FEE Configuration

Peter Chochula CERN-ALICE ALICE DCS Workshop, CERN September 16, 2002 Why do we need involve ECS in configuration? A.DCS may need to ask for reconfiguration in some cases (e.g. voltage regulator failure) B.It should be possible to reconfigure FEE without the presence of DAQ (recovery from power cut)

Peter Chochula CERN-ALICE ALICE DCS Workshop, CERN September 16, 2002 A. Configuration via DDL initiated by DCS DAQ DDL Local Control DCS + FEE FEE Configuration ECS DCS DAQ DCS asks for reconfiguration of FEE ECS routes the request to DAQ Ready

Peter Chochula CERN-ALICE ALICE DCS Workshop, CERN September 16, 2002 B. Configuration without DAQ DAQ DDL Local Control DCS + FEE FEE Configuration ECS DCS DAQ DCS asks for reconfiguration of FEE Ready ECS routes the request to local control CPU