High Resolution Corrosion/Erosion Monitoring Rohrback Cosasco Systems, Inc.

Slides:



Advertisements
Similar presentations
Presented By Tom Spenceley & Jerry Bauer
Advertisements

ER & LPR Monitoring Systems
Drew Hevle. NACE Houston Section Principal Corrosion Engineer
Strategic Corrosion Monitoring in Topside Applications Tom Swihart GE Measurement & Control Solutions.
Subsea Production Assurance A new generation of Smart Qualified Subsea Flow Assurance Integrity Monitoring Tools.
RCS Corrosion Management Solutions An Introduction to COSASCO ®
Objective of the session.
You Can Measure the Benefits… Solid Applied Technologies Sewer Level Monitoring.
Gathering Oil From the Fields
INCREASING PLANT RELIABILITY & INTEGRITY MANAGEMENT USING CFD & CORROSION SIMULATION Regan Pooran, P.Eng. VP-SPEC TECHNOLOGIES INC. VP - SPEC Technologies.
1 Engine Protector Safe Rider Vehicle Technologies (Pty) Ltd PO Box 11376, Rynfield South Africa Tel./ fax Cell:
ISO Wellhead Integrity
The Need for an Integrated View of Water Quality Modeling and Monitoring Bruce Kiselica USEPA, Region 2 Second Workshop on Advanced Technologies in Real.
Remotely monitor and control a DCS (Distributed Control system) system of a miniature Oil platform through a 2D representation model Presented by - Himendra.
Automated Machining Manufacturing Processes. Outline Machining Centers Equipment Tool Changers Centering and Clamping Selection of Equipment Selection.
Book 2: Chapter 6 Line Pipe and Fittings.
Rohrback Cosasco Systems, Inc.
Overview Presentation MKT-CODE-P-001E. Introduction Single Channel Codec designed to increase the flexibility of NetVu Connected analogue/IP CCTV networks.
Thermographic Testing Vibrotech Reliability Services Limited.
Corrosion/Erosion PROCESS OUT OF CONTROL.
Fuel Oil Systems Fuel Oil Systems consist of: Storage Tanks Pumps
Case Study Portable Wireless Network for Emergency Response.
Vibration Monitoring & Machine Protection Systems Copyright 1999, Frank Howard, STI Vibration Monitoring, Inc. League City, Texas USA Reciprocating.
SCADA and Telemetry Presented By:.
Petroleum Engineering 406 Floating Drilling
1 HPHT Equipment Development Process Presented by Jim Raney Based on the work from 6HP.
John Rhoads Ranette Halverson Nelson L. Passos Department of Physics Department of Computer Science Midwestern State University Computerized Analysis of.
NFPA 31 Standard for the installation of Oil- Burning Equipment
Drilling Operations History Drake’s Well was the first commercial oil well drilled in 1859 in Pennsylvania. Cable Tool Drilling technique was used to drill.
INTEQ Answers While Drilling SM John Shields Director of Software Baker Atlas/INTEQ Houston, TX.
Advancements in WD1 Data Collection Methods Presented by: Robert Keller Date: May 12 th, 2015.
Decontamination of filed equipment used in environmental site characterization and ground-water monitoring projects University of Arkansas 11/13/2006 By.
Need to enhance your network?
Part 3.3 Production Safety. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Understand safety.
Relationship Between in-situ Information and ex-situ Metrology in Metal Etch Processes Jill Card, An Cao, Wai Chan, Bill Martin, Yi-Min Lai IBEX Process.
STORED - PRODUCT INSECTS: “INTEGRATED PEST MANAGEMENT – A RESEARCHER’S VIEW” David Weaver DEPARTMENT OF ENTOMOLOGY MONTANA STATE UNIVERSITY BOZEMAN, MT.
Flow Assurance Integrity Monitoring FAIM™ a “Game Changing” Technology Presented By Elizabeth Breakey.
Building Automated Analysis Systems for the future 34 th Annual EPRI Steam Generator Workshop July 20-22, 2015 – Portland, OR 1 © Zetec Inc. All rights.
Copyright © The McGraw-Hill Companies, Inc. Permission required for reproduction or display. PowerPoint to accompany Krar Gill Smid Technology of Machine.
Poly Flo Piping System “The Double Wall Advantage” PolyFlo Double Containment Double Wall Integrity with Single Minded Purpose!
Samsung Heavy Industries Presenter: 정하림 박성규 김록한. 1.Introduction SHI & FPSO 2.Major process 3.Manufacturing process Contents.
Piping and Valves Unit 8. Today’s Agenda Purpose of piping and valves Material of construction and service Pipe fittings Piping and valve connections.
Corr Science Presented By Tom Spenceley & Jerry Bauer.
11 CLUSTERING AND AVAILABILITY Chapter 11. Chapter 11: CLUSTERING AND AVAILABILITY2 OVERVIEW  Describe the clustering capabilities of Microsoft Windows.
PHASE 7 FACILITIES ENGINEERING
Lynsay Bensman 06 October 2009 Errors in Sampling/Monitoring in an Internal Corrosion Program NACE Eastern Area Conference.
Rich Dewar Product Line Manager Itron. 2 THE DATTUS III METER / ’s1950’s1930’s1900’s DATTUS III.
Purpose Probe construction Field and laboratory measurements Data processing, applicational example Conclusions, outlook A NEW METHOD TO DETERMINE in.
INFORMATION ABOUT SOKOL Sokol Manufacturing company was established in 2006 and right from the start our priority business area was design and manufacture.
Tank Contents Measurement & Control Providing tank contents measurement solutions since 1945.
Vacation Rental Software Vacation Rental Property Software Help Vacation Property Managers Get a Vacation Rental Software with 10% Discount ! Buy Vacation.
Introduction to Well Completions
Copyright © 2010 Rockwell Automation, Inc. All rights reserved. Machine Condition Monitoring on ControlNet RSLogix5000 support for XM ®
Earthing in an electrical network ensures your safety.
4/28/2017 Stress Corrosion Cracking Assessment in Pipeline Mohammed Abu Four October 11, 2010.
Air condition installation
Potential Risks, Limitations, And Failure Mechanisms Arising From Fastener Design, Manufacture, Material, And Coating Selection Prepared for the National.
Natural Gas Production Chapter 4 Hydrate Formation
Presented By Tom Spenceley & Jerry Bauer
Copyright SwissFlow B.V.
Presented By Tom Spenceley & Jerry Bauer
Subsea 100 Global Services Products Presentation
Erosion Management Strategy for High Risk Assets
Overfill Prevention Technology and Maintenance
Parts Wellhead All casing strings, except for liners, are suspended from a wellhead. On a land well or offshore platform the wellhead is just below.
Finally. Inspect every tube.
Caisson Repairs IMG Offshore provide a full Caisson Rehabilitation Service. Whatever the problem: Through Wall Perforation Wall loss through Corrosion.
Corrosion Part 3 Corrosion Protection Methods
Anti-Seize 1100 A lead Free, high temperature, non melting Anti-Seize Compound for Industrial and Mining applications. Reinforced with fine copper powder.
About Us Scanster is one of the leading IT security software company. Our Software's are well integrated system that simplify computer security management.
Presentation transcript:

High Resolution Corrosion/Erosion Monitoring Rohrback Cosasco Systems, Inc.

Project  Field: Major Offshore Development  Five remote wellhead platforms, a floating production, storage and offloading (FPSO) vessel, and riser utility platform (RUP)  Production: 190,000 bpd of oil and 510,000 bpd total fluids

Background  Problem: Corrosion and Erosion caused by corrosive factors (i.e chemical) and erosive factors (i.e. sand) in oil and produced liquids  Solution: Continuous, on-line corrosion/erosion monitoring system including transmitters, probes, coupons, access & retrieval equipment, communication equipment, corrosion server and software

System Configuration  Online System consists of 142 monitoring points –A combination of 95 Quicksand™ and Microcor ® Transmitters with corrosion probes/biological probes –47 Coupons (weight-loss) monitoring points, including coupon holders  Cosasco ® Access System containing RSL Retrievers, access fitting assemblies, and service valve kits.  ICMS3™, data retrieval and management system, corrosion server and software

With Quicksand Transmitters in exactly the same configuration as a Microcor Transmitter, a comprehensive corrosion/erosion monitoring solution is established.

Advantages of Continuous, On-line Corrosion/Erosion System  High resolution monitoring  Rapid response  Immediate alerts to process upsets  Real-time data  A single cable can connect up to 32 transmitters with a single cable run  Integrated corrosion/erosion system measures rates from both corrosive and erosive factors  Delivery of information enables corrosion/erosion rates to be integrated and used as process parameters

Sand Erosion  The probability of sand erosion has increased with advances in horizontal well drilling  Velocities can exceed over 100 ft/sec causing an increase in the occurrence of sand erosion  Sand at high velocities produces a “sandpaper” effect, scraping away layers of protective coatings and metal

 Elbows and bends are more vulnerable  Former methods of erosion monitoring (i.e. coupons, ultrasonics) were inadequate because of the lack of distinction between erosion and erosion-corrosion

Quicksand™  High sensitivity transmitters and sand probes for real time monitoring  Seamlessly integrates with Microcor online and data-logging system  Two probe types  Cylindrical – suitable for severe flow or high temperature applications  Angled – exposed to the flow at a 45° angle

 S4500 Probe  Rugged, all welded cylindrical element  Specially designed element support shield, suitable for severe flow or high temperature applications  S4700 Probe  45° element simulates change in direction in pipe  Maximum temperature is 400°F  Recommended for flow rates less than 25 ft/sec

Quicksand™ offers real time detection of sand erosion Erosion Rate (MPY) Detection Time (Minutes) Detection Time Vs. Erosion Rate

Actual Data Showing a Corrosion Upset

How the Quicksand System Works A sand probe is positioned middle-of-the-line where velocity of flowing sand is greatest

Summary  RCS provides a comprehensive erosion/corrosion monitoring system using the latest technology  Advantages of Erosion/Corrosion Monitoring System  Real time data and immediate alerts to process upsets so that proper action can be taken to prevent further damage  Measures rates from both erosive and corrosive factors  Rugged design allows for use in severe flow and high temperature environments  Rapid detection of low erosion/corrosion in systems with little or no corrosion allowance  Saves you money by saving you time