Environmental Legislation in Pakistan – Compliance Perspectives Ibad ur Rehman Deputy Director (Projects) Cleaner Production Institute.

Slides:



Advertisements
Similar presentations
Recommendations of the Initial Environmental Assessment (IEE) According to the SIEE, the project is identified as a category of B under the ADB environmental.
Advertisements

ENTITIES FOR A UN SYSTEM EVALUATION FRAMEWORK 17th MEETING OF SENIOR FELLOWSHIP OFFICERS OF THE UNITED NATIONS SYSTEM AND HOST COUNTRY AGENCIES BY DAVIDE.
Stormwater Management Initiative Update. ODOTs Goal Develop a streamlined stormwater runoff treatment program to: Develop a streamlined stormwater runoff.
Training Workshop for Financial Intermediaries and Implementing Agencies Kiev, May 2011 Ruxandra Floroiu Senior Environmental Engineer, ECA Region, World.
INTRODUCTION TO ISO Joan Kithika. OUTLINE DEFINITIONS WHY ENVIRONMENTAL MANAGEMENT? LEGAL OVERVIEW HOW TO MANAGE THE ENVIRONMENT-AN ENVIRONMENTAL.
Presentation by Cambodian Participants Phuket, Thailand February 2012 Health Impact Assessment Royal Government of Cambodia.
The BC Oil & Gas Commission Proactively Participating in Project Decision Making Processes James O’Hanley Deputy Commissioner.
Scoping in the EIA process Proposal Identification Screening
BULGARIAN COMPETENT AUTHORITIES IN THE FIELD OF IPPC Kalin Iliev Ministry of Environment and Water Bulgaria.
ISO General Awareness Training
ENVIRONMENTAL MANAGEMENT PLAN
Office of Inspector General (OIG) Internal Audit
Building a Compliance Risk Monitoring Program HCCA Compliance Institute New OrleansApril 19, 2005 Lois Dehls Cornell, Esq. Assistant Vice President, Deputy.
Environmental Impact Assessment Prepared by: Miss Syazwani Mahmad Puzi School of Bioprocess Engineering UniMAP.
FUNDED BY THE EUROPEAN COMMISSION S ustainable and C leaner Production in the Manufacturing I ndustries of Pak istan SCI-Pak Mar Feb 2012.
What If I Must Go Beyond a Preliminary Assessment? (the example of a USAID EA under Reg. 216) [DATE][SPEAKERS NAMES]
Environmental Impact Assessment (EIA): Overview
Approaches for forest certification System versus performance ? Presentation prepared by Pierre Hauselmann for the WWF / WB Alliance Capacity building.
Workshop, 12/3/2004 Banska Bystrica – SLOVAC REPUBLIC “INTEGRATED LICENCE PROCEDURE (Greek case)” Katerina Iakovidou-Anastasiadou Hellenic Ministry for.
Basics of OHSAS Occupational Health & Safety Management System
Organization and Implementation of a National Regulatory Program for the Control of Radiation Sources Staffing and Training.
Stormwater Management Initiative Update. ODOT’s Goal Develop a streamlined stormwater runoff treatment program to: Develop a streamlined stormwater runoff.
NCSX Management Overview Hutch Neilson, NCSX Project Manager NCSX Conceptual Design Review Princeton, NJ May 23, 2002.
What is Necessary to Ensure Natural Justice in EIA Decision-making? Angus Morrison-Saunders Senior Lecturer in Environmental Assessment School of Environmental.
UNEP Training Resource ManualTopic 1 Slide 1 Aims and objectives of EIA F modify and improve design F ensure efficient resource use F enhance social aspects.
CHAPTER 1 FOUNDATION. 1.1 National Environmental Policy Act (NEPA) “An act to establish a national policy for the environment, to provide for the establishment.
Energy, Environmental Impacts, and Sustainable Development Presented by Cat Shrier, Ph.D., P.G. Water Resources Planner (403)
Public participation of EIA in R.O.C. Hsiao-Tien Wu, Wei-Chein Sun & Tung-Wang Chang Environmental Protection Administration Executive Yuan R.O.C.
Stakeholder consultations Kyiv May 13, Why stakeholder consultations? To help improve project design and implementation To inform people about changes.
Gulana Hajiyeva Environmental Specialist World Bank Moscow Safeguards Training, May 30 – June 1, 2012.
EIA in Pakistan Brief background and History of the National EIA system. It started with the promulgation of Pakistan Environmental Protection Ordinance.
UNEP Training Resource ManualTopic 2 Slide 1 The EIA process The EIA process comprises:  screening - to decide if and at what level EIA should be applied.
-Honesty-Cooperation-Responsibility-Respect  Established in 2003 by the Ministry of Economy.  Non – profit public institution.  Managing and administrating.
State of implementation of the decision III/6f regarding Ukraine (MOP 2, June, , 2008, Riga, Latvia)
Clean Development Mechanism Cell, Ministry of Environment, Government of Pakistan Pakistan National Operational Strategy for Clean Development Mechanism.
Conducting Clinical Risk Assessments And Implementing Compliance Practices Jane L. Stratton Chiron Corporation VP/Associate General Counsel Chief Compliance.
Environmental Management Plan (EMP) Required for: Full EIA based on Palestinian EIA Policy Category A projects based on World Bank Policy.
EIAReview11.07(Gajaseni, 2007)1 Reviewing. 2 Reviewing is the process of EIA report assessment produced during EIA process is concerned with assessing.
Implementation and follow up Critically important but relatively neglected stages of EIA process Surveillance, monitoring, auditing, evaluation and other.
Mitigation and Impact management
ISO DOCUMENTATION. ISO Environmental Management Systems2 Lesson Learning Goals At the end of this lesson you should be able to:  Name.
SEA in the Czech Republic Prague, 24 September 2008.
Environmental Assessment in British Columbia Forum of Federations Conference September 14, 2009.
GOVERNMENT OF PAKISTAN MINISTRY OF ENVIRONMENT PRESENTATION TO ENVIRONMENTAL INITIATIVES AND UNFCCC IMPLEMENTATION IN PAKISTAN.
NRC Environmental Reviews for Uranium Recovery Applicants and Licensees James Park (301)
1 Waste Discharge Authorization Application - British Columbia WG6 Application Process WG Document Review presented by Helga Harlander October x, 2008.
ENVIRONMENTAL COMPLIANCE STRATEGIES’ ROLE AND IMPACT, ALTERNATIVES AVAILABLE TO SELF POLICE, OR MONITOR COMPLIANCE.
Hydro One Community Liaison Committee Minister’s Conditions Meeting #2 August 19, 2014 Solina Hall.
Checking and Corrective Action EPA Regions 9 & 10 and The Federal Network for Sustainability 2005.
Achievements in IPPC Directive Implementation: problems and constraints Albania Ministry of Environment 3 rd BERCEN Exchange Programme for the Environmental.
National Environmental Assessment Requirements and Relation to World Bank Policies Relevance to Central Asia Gulana Hajiyeva WB Safeguards Training Workshop.
DAY 2 Session I to IV ENVIRONMENTAL AUDITING. Session recap In the previous sessions we discussed : Introduction to Environmental issues Environmental.
Role of State Pollution Control Boards in Compliance and monitoring of conditions of Environmental Clearance Item No. 9.0.
Internal Audit Section. Authorized in Section , Florida Statutes Section , Florida Statutes (F.S.), authorizes the Inspector General to review.
ISO Session 3 Environmental Management and Ethics in Management.
EIAScreening6(Gajaseni, 2007)1 II. Scoping. EIAScreening6(Gajaseni, 2007)2 Scoping Definition: is a process of interaction between the interested public,
AUDIT STAFF TRAINING WORKSHOP 13 TH – 14 TH NOVEMBER 2014, HILTON HOTEL NAIROBI AUDIT PLANNING 1.
Required Documentation: Determination and Overview (EPTM Chapter 3)
EIA approval process, Management plan and Monitoring
Stakeholder consultations
OFFICE OF THE AUDITOR GENERAL, NEPAL
PLANNING THE INTERNAL AUDIT (8 - 10%)
National Environmental Policy Act (NEPA)
Relationship between World Bank and Romanian EA requirements
EIA- Concept and Practice
Key Value Indicators (KVIs)
Project Management Group
Environmental Impact Assessment EIA
Roles and Responsibilities
Stakeholder Engagement
Presentation transcript:

Environmental Legislation in Pakistan – Compliance Perspectives Ibad ur Rehman Deputy Director (Projects) Cleaner Production Institute

What we will NOT talk about History of environmental legislation in Pakistan Development process of environmental legislation Statutory details contained in the ext of PEPA 1997 Roles & responsibilities of regulatory institutions 2

What we WILL talk about Compliance mechanism for non-environmental professionals Types of compliances required Some recommendations Some limitations 3

Environmental Concerns raised by EPAs No enrolments under SMART program No environmental reports submitted No monitoring report submitted Organizations’ commitment for environment is not visible No reports submitted to Associations by member units 4

Regulatory Compliance – I Environmental Impact Assessment (EIA) Initial Environmental Examination (IEE) Environmental Statement / Environmental Audit 5

Projects requiring EIA  Projects likely to cause adverse environmental impacts  Projects in Environmental Sensitive Areas may require EIA  Listed on schedule A of Pakistan Environmental Assessment Procedures 6

Projects requiring IEE  Projects with uncertain effects on the environment  Not located in Environmental Sensitive Areas  Listed on schedule B 7

Scope of Environmental Report Description of the Proposed Project Description of the Environment Legislative and Regulatory Considerations Determine the Potential Impacts of the Proposed Project Analysis of Alternatives to the Proposed Project Mitigation and Management of Negative Impacts Development of a Monitoring Plan Assistance in Inter-Agency Coordination and Public/NGO Participation 8 Cont…

Recommendations EPA should include concept of Cleaner Production and Energy Efficiency in the scope of environmental report Proponents should also consider the above, specially for EA, for cost benefit Proponents’ responsibility is limited to submission of report and responding to queries. Follow-up for NOC is NOT required. 9

Regulatory Compliance – II Regular monitoring of emissions Compliance with NEQS Preparation of Environmental Management Plans 10

Categorization of Industries In accordance with the international standards and practices the industries have been categorized as follows:  Category A.  Category B.  Category C. 11

Self Monitoring & Reporting Under Normal Plant Condition Category Reporting Frequency Liquid EffluentGaseous Emissions AMonthly BQuarterly CBiannually (Six Monthly) - 12

IIndustries in Category A would be required to maintain a record of times during which start-up and upset conditions occur. TTotal time for start-up and upset conditions would be reported on a periodic basis. Recording and Reporting of Plant Start-up and Upset Schedules 13

Scope of Monitoring Assignment Develop sampling plan Conduct sampling Engage an EPA approved laboratory for environmental testing Evaluate test results based on professional experience Prepare environmental monitoring report for onward submission to EPA, having sections on monitoring results, technical discussion on results, and mitigation measures (if any). 14

NEQS Compliance - Limitations Space limitation specially for WWTP Huge Capital expenditure involved Technical limitations specially in some cases of air emissions Technical basis of NEQS Individual ETP vs CETP 15

WHAT IF OUR EFFLUENT OR EMISSIONS DO NOT MEET NEQS??? 16

Scope of Environmental Management Plan Identification of Environmental Improvement Options Prioritization of Environmental Improvement Options Action Planning Report Formulation and Submission to EPA 17

Implications in Case of Non- Compliance  Pollution Charges  Environmental Protection Order  Environmental Tribunal 18

19