ISIS Electrical Engineering Group

Slides:



Advertisements
Similar presentations
AC DRIVES There are two type of AC motor Drives :
Advertisements

Chapter 12 Transformers. Chapter 12 Transformers.
Proton Driver Magnet Power Supply System Cezary Jach BD/EE Support April 19, 2000.
ECE 4411 Dynamic Braking of Induction Motors Slow down a machine by converting kinetic energy stored in the rotating mass to heat energy in the rotor and/or.
AC Machine.
Dry type transformers Zaragoza Traction application
Lecture 20-1 Alternating Current (AC) = Electric current that changes direction periodically ac generator is a device which creates an ac emf/current.
F.Brinker, DESY, July 17 st 2008 Injection to Doris and Petra Fitting the detector in the IP-region Radiation issues Beam optic, Target cell Polarisation.
Copyright © 2009 Pearson Education, Inc. Lecture 10 – AC Circuits.
Transformer.
Development of new power supplies for J-PARC MR upgrade Yoshi Kurimoto (KEK) for J-PARC accelerator group.
Chapter 19 Charging Systems.
Inductors. Inductance Electrons in motion create electromagnetic fields – Recall from previous section that electrons in motion also create an electrostatic.
Sergey Antipov, University of Chicago Fermilab Mentor: Sergei Nagaitsev Injection to IOTA ring.
Chapter 22 Alternating-Current Circuits and Machines.
Options for a 50Hz, 10 MW, Short Pulse Spallation Neutron Source G H Rees, ASTeC, CCLRC, RAL, UK.
Chapter 2 Transformers.
Transformers Mechanical and Electrical Systems SKAA 2032
FOWLER CHAPTER 12 LECTURE 12 TRANSFORMERS. TRANSFORMERS CHAPTER 12 TRANSFORMERS ARE MULTIPLE WINDING INDUCTORS. WORK ON THE PRINCIPLE OF MUTUAL INDUCTANCE.
Chapter 33 Alternating Current Circuits CHAPTER OUTLINE 33.1 AC Sources 33.2 Resistors in an AC Circuit 33.3 Inductors in an AC Circuit 33.4 Capacitors.
Front End Test Stand Klystron Commissioning Alan Letchford UKNF Plenary Meeting 22 nd April 2009.
Unit 5 An Introduction to Mechanical Engineering: Part One Electrical and Electronic Systems 5.2 – key points Kirchhoff postulated that in any circuit.
Industrial Electrical Engineering and Automation Structures of the Energy flow system Mechatronics 2007.
1.6 Real Single-Phase Transformer.
CAT-KEK-Sokendai School on Spallation Neutron Sources 1 Rapid Cycling Synchrotron (I) CAT-KEK-Sokendai School on Spallation Neutron Sources K. Endo (KEK)
Eric Prebys USPAS, Knoxville, TN, Jan , 2014.
3 GeV,1.2 MW, Booster for Proton Driver G H Rees, RAL.
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
1 Status of EMMA Shinji Machida CCLRC/RAL/ASTeC 23 April, ffag/machida_ ppt & pdf.
Related poster [1] TPAG022: Slow Wave Electrode Structures for the ESS 2.5 MeV Chopper – Michael A. Clarke-Gayther Status Funding bids have been prepared.
FAIR PROJECT COST BOOK. FAIR cost 1.2 mld euro 1. Civil construction and infrastructure 322Meuro 2. Accelerator systems 592 Meuro 3. Experimental facilities.
Copyright © 2009 Pearson Education, Inc. Chapter 33 Inductance, Electromagnetic Oscillations, and AC Circuits Part II.
Electric Machine Introduction
EET 221 Synchronous Machines Rafiqi.
Slide 1Fig 33-CO, p Slide 2Fig 33-1, p the basic principle of the ac generator is a direct consequence of Faraday’s law of induction. When.
Chinese Academy of Sciences Institute of High Energy Physics Accelerator Center Power Supply Group Status of BEPCII and CSNS Power Supply System Qi Xin.
Imperial College London 1 6. Injection into and ejection from circular machines PREACCELERATOR ACCUMULATORRING PARTICLESOURCE INJECTION 1 EJECTION INJECTION.
INDUCTION MOTOR.
Bunch Separation with RF Deflectors D. Rubin,R.Helms Cornell University.
Plan for Beam Extraction using strip-line kicker with pulse bump orbit Present extraction kicker system Strip-line kicker system for ILC Beam extraction.
1 Fast kicker study Machine Time 2011/10/18~10/29(2 weeks) TB meeting 2011/01/14 T.Naito.
The Introduction to CSNS Accelerators Oct. 5, 2010 Sheng Wang AP group, Accelerator Centre,IHEP, CAS.
BASIC ELECTRICAL TECHNOLOGY DET 211/3
EET 423 POWER ELECTRONICS -2
Uninterruptible Power Supply Improves Reliability at The Australian Synchrotron Sean Murphy – ARW 2013 Melbourne.
Halliday/Resnick/Walker Fundamentals of Physics 8th edition
Transformers and Impedance. Review Two types of current: –ac –dc Two fundamental principles: –Moving electrons create magnetic fields –Moving or changing.
ICFA mini-Workshop on Beam Commissioning for High Intensity Accelerators Yasuhiro Watanabe (J-PARC / JAEA) Tracking between bending and quadrupole families.
POPS: Power for PS A novel 60 MW Pulsed Power System based on Capacitive Energy Storage Jean-Paul Burnet June 2010.
Construction and working of TRANSFORMERs
Copyright © 2009 Pearson Education, Inc. Chapter 29 Electromagnetic Induction and Faraday’s Law.
Hafizism february 2007 EMT462 Electrical System Technology LECTURE V mohd hafiz ismail level II jejawi.
Baseline Injection/Extraction Configuration Aimin Xiao and Louis Emery, September 12th 2006.
Auto Transformer Current Flow. Principles of Auto Transformers H X H0/X0.
TPS pulse magnet measurement
LINAC4 ADVISORY COMMITTEE
Inductance, Electromagnetic Oscillations, and AC Circuits
Resistance Impedance Energy Storage Resistor R Ohms Reactance Z Ohms
Electric Machine Induction Motor
Electric Machine Introduction
Development of new power supplies for J-PARC MR upgrade
Electromechanical Systems
FCC-hh injection group 7
Electromechanical Systems
Klystron Power Supplies for ILC
Energy Conversion and Transport George G. Karady & Keith Holbert
TRANSFORMER Transformer is electromagnetic static electrical equipment (with no moving parts) which transforms magnetic energy to electrical energy. It.
Strip-line Kicker R&D at KEK-ATF
Patrick ALEXANDRE, 27, from France.
Kicker and RF systems for Damping Rings
Presentation transcript:

ISIS Electrical Engineering Group Mike Glover

ISIS Electrical Engineering Group Structure

ISIS Electrical Engineering Group Structure

Areas of Responsibility ISIS Synchrotron Power Supplies ISIS Extracted Proton Beam Line Power Supplies ISIS Neutron Beam Line Chopper Power Supplies Electrical Engineering of ISIS Control Systems for: Vacuum Systems Water Plant Systems Electrical Engineering of Neutron Instrument Beam Line Installations

ISIS Synchrotron Power Supplies Main Magnet “White Circuit” 14.4kV 650ADC 400AAC Injection & Extraction Septum 5kA & 10kA 50V DC Injection Dipole 50Hz 13kA 500µS Flat Top 100µS Rise Time Ring Steering & Trim Quadrupoles 4 Quadrant 150kA/S 250 Amp Programmable Fast Extraction Kicker Magnets 50Hz 40kV 5kA 500nS Flat Top 80nS Rise Time

Injection Septum Deflects the injected beam into the aperture of the injection dipole magnet and onto the foil 200kW 5000 Amps 40V 1416 Transistor Regulator 100ppm stability

Extraction Septum Magnet Bend 21º 10,000 Amps 50V 11kV Supply Rectifier Transistor Regulator 4 Sets of 24 Transistor Banks 2304 Transistors

Extraction of Beam At Extraction Protons Circulating at 800 MeV Two bunches with 200 ns gap Extraction System 3 fast kicker magnets deflect the beam into … a septum magnet which lifts it into the EPB Kickers need to be fast to avoid beam loss Go from zero to full field between passage of bunches

Extraction Details Kickers 3 units give 15 mr kick Rise Time 80 nS Flat Top 500 nS 5000A 40kV 50Hz pulsed Septum ~ 8 m downstream 8 Turn, 8900 A DC 1.8 m long (21 degrees) Lifts beam out of machine

ESSO Ring Vacuum PLC Control System

ESSO Neutron Beam Line Installations Complete electrical design Electrical Supply Detector Cabling Chopper Cabling Vacuum System Controls Several kilometres of cabling per beam line

Power Systems and the ISIS Synchrotron Andrew Kimber

Outline Main magnet systems MM Power Supply and the White Circuit Capacitor bank replacement UPS Replacement 1MJ Storage Choke Summary

Magnet systems Main Magnets 10 Bending Dipoles 10 Singlet Quadrupoles 10 Focussing Doublet Quadrupoles. Corresponds to 10 superperiods

Main magnet power supply

Main magnet power supply For successful acceleration the same magnetic field is required in all the main magnets Main Magnets per super period: 1 Dipole 1 Singlet Quadrupole 1 Doublet Quadrupole How do we connect these? One power supply per super period Main Magnet System operates at 14.4kV Current changes from 250A to 1050 Amps Peak Power = 15.1 MVA For 10 super periods the Peak Power Required = 151 MVA Excessive Power Required !

Main magnet power supply Magnets have Inductance Inductance can store energy E = ½ LI2 Capacitors also store energy E = ½ CV2 Resonate the stored energy between Inductor and capacitor: With no losses in the system the impedances of the Inductance and the Capacitance would be identical and energy would be transferred with an alternating current between them and at a resonant frequency. Inductance reactance XL = Capacitive reactance XC ωL = 1/ωC ω = 2π f Resonant Frequency f = 1/(2π√LC )

Main magnet power supply Normal Temperature Magnets have Resistance Capacitors have losses Cables have losses If the losses << Inductance we have a high ‘Q’ oscillating system. We just require to supply make up power for the resistive and AC losses in the Magnets, Cables and Connectors.

The White Circuit WHITE CIRCUIT M G White, Princeton (1956) CERN Symposium Oscillate the magnet cell using capacitors and choke. Connect all the magnets together electrically and same current flows through each magnet. Permit DC bias current through split choke secondary winding Power required is to make up for the resistive losses in the copper, ac losses in the magnets and power supply losses. IM = IDC – IAC cos ω t Total of 1.75MW (150MVA peak for non resonant circuit)

The White Circuit

Main magnet power supply Replace capacitor bank with smaller more efficient units. Replace the Motor Alternator Set with a UPS System Replace the Choke. Split the Choke into 10 separate units and build spare as well. PROGRESS TO DATE Capacitor bank replaced (2002) UPS system currently on order. Build a scale model to prove theory of split choke. Scale model chokes currently being ordered.

Old Capacitor Banks

New Capacitor Banks Replaced in 2002 Smaller units, space used for 1 old bank is now used for 5.

Motor Alternator Set

Previous Motor Alternator Set Brentford Excitation PSU 12KVA Mains supply 5KV single phase 3.6KV single phase Storage choke and main magnets DC Motor Alternator shaft transformer Phase locked to ISIS 50Hz reference signal Electromechanical Single phase output 2 phases connected line to line and 1 disconnected Alternator phase locked to ISIS 50Hz reference 100Hz induced harmonic between raw mains and reference signal

Current Motor Alternator Set Brentford Excitation PSU 12KVA Mains supply Phase locked to ISIS 50Hz reference signal UPS 5KV single phase 3.6KV single phase Storage choke and main magnets DC Motor Alternator shaft transformer Phase locked to ISIS 50Hz reference signal Alternator and UPS phase locked to ISIS 50Hz reference Factor of 2 improvement in AC stability

New UPS system Motor alternator set replaced with 4 300KVA units three phase 720V single phase 3.6KV single phase Storage choke and main magnets transformer Gray converter circuit Motor alternator set replaced with 4 300KVA units (1 redundancy) UPS units currently on order Installed by Q4 2004

Storage Choke Current 1MJ, 2H Storage Choke Ex-NINA, manufactured in the 1960’s Ten interleaved primary and secondary windings Choke windings and core: 90 tonnes Total weight (inc. oil): 120 tonnes 30 years of service State of insulation unknown, leaks oil, failure would result in ISIS being down for extended period of time

Replacement chokes Current 2H storage choke 10 off replacement 200mH chokes …X10 1/5 scale models 40mH Minimise financial and technological risk Due September 04 Full scale prototype/spare

Replacement chokes Most probable design is a ‘frame’ type storage choke Energy stored (air gaps) = ½ L I2 Energy stored/unit volume = ½ μ0 B2 Calculate dimension of air gaps For 200mH, 1010A, 100KJ, 0.9T: Volume ~0.3m3 Size and distribution of these critical in controlling losses

Replacement chokes Testing of scale models to take place September 2004 Losses Stray magnetic fields Leakage inductance Linearity Noise (mechanical) Cost

Summary New capacitor banks Installed 2002 New UPS system Installed by Q4 2004 New split choke system Scale model testing Q4 2004 Prototype and production chokes 2005/6