Texas Clean Rivers Program 2008 - 2009 2009 Steering Committee Meetings Nueces River Authority Texas Commission on Environmental Quality Citizens March.

Slides:



Advertisements
Similar presentations
ALLEN BERTHOLD TEXAS WATER RESOURCES INSTITUTE Water Quality and Copano Bay Watershed Efforts.
Advertisements

What are TMDLs? and What Might They Mean to MS4 Permittees?
TMDL Development Mainstem Monongahela River Watershed May 14, 2014.
Texas Stream Team: Citizen Science Water Quality Monitoring and TMDLs Travis Tidwell The Meadows Center for Water and the Environment – Texas State University.
The Lake Allegan/Kalamazoo River Total Maximum Daily Load (TMDL) Plan Implementation by Jeff Spoelstra, Coordinator, Kalamazoo River Watershed Council.
7:00 pmWelcome and introductions 7:05pmHLWD planning overview Plan update process 7:25 pmStakeholder involvement Watershed problems 7:40 pmPublic comment.
East San Gabriel valley watershed Group Watershed Management Program (WMP) Development Cities of claremont, La Verne, pomona, and san dimas.
Shingle Creek and West Mississippi Watershed Management Commissions Third Generation Watershed Management Plan.
2009 Water Quality Monitoring Report – Fish Creek Vaughn Hauser, B.Sc. Naomi Parker, B.Sc., BIT, CEPIT.
Stream Monitoring in Loudoun County David Ward, Water Resources Engineer Department of Building and Development, Department of Building and Development,
Montana’s 2007 Nonpoint Source Management Plan Robert Ray MT Dept Environmental Quality.
Chesapeake Bay Restoration An EPA Perspective Jeff Corbin Senior Advisor to the Administrator U.S. EPA.
Texas Stream Team …is a joint partnership with Texas Commission on Environmental Quality, U.S. EPA Region VI, Texas State University-San Marcos, and numerous.
Florida Department of Environmental Protection Watershed Assessment 2015 Strategic Monitoring in the Florida Keys DEAR- Water Quality Assessment Program.
National Water Quality Monitoring Network Design Alfred L. Korndoerfer, Jr. Karl Muessig.
Texas Clean Rivers Program Nueces River Authority Texas Commission on Environmental Quality Citizens.
Texas Clean Rivers Program Nueces River Authority Texas Commission on Environmental Quality Citizens.
Hydrostatic Testing Draft General Permit Draft Permit Stakeholder Outreach Meeting April 23, 2015 Moderated by: Lillian Gonzalez, Unit Manager, Permits.
2011 Lower Basin Stakeholder Forum Nueces River Authority Feb 16, 2011 – Uvalde Feb 23, 2011 – Corpus Christi.
VIRGINIA’S TMDL PROCESS.
Water Quality Planning Division Monitoring & Assessment Section Surface Water Quality Monitoring Program (SWQM)
2015 Environmental Trade Fair and Conference Jill Csekitz Technical Specialist TCEQ Monitoring & Assessment Section Devils River State Natural Area Image.
Bay Area Integrated Regional Water Management Plan North Bay Watershed Association Meeting November 3, 2006 Working together to enhance sustainable water.
David Ward Goose Creek Association Forum March 24, 2010.
Regional Grant Funding Coordination for Implementation of Watershed Management Plans Project Clean Water Summit July 15, 2004 David W. Gibson SDRWQCB
Loudoun County Water Resources Monitoring Presented to Loudoun Valley High School May 9, 2012 David Ward and Scott Sandberg Loudoun County Department of.
By Mary Waters, Texas Stream Team. Outline  About the Arroyo Colorado  Basic information (geography)  History  Major uses  Water quality summary.
Aquatic Life Selenium Standards Cottonwood Creek Drainage Cherry Creek Segment 4b Regulation 38 June 9, 2015.
2011 Upper Basin Stakeholder Forum Nueces River Authority Feb 16, 2011 – Uvalde Feb 23, 2011 – Corpus Christi.
Catoctin Creek TMDL Implementation Plan Development June 24, 2004.
The Meadows Center Texas Stream Team Prepared in cooperation with the Texas Commission on Environmental Quality and U.S. EPA. The preparation of this presentation.
Deep River-Portage Burns Watershed TMDL Stakeholder Meeting March 13, 2013.
Adem.alabama.gov ADEM’s Monitoring Summary Reports Alabama – Tombigbee CWP Stakeholders Meeting Montgomery, Alabama 3 February 2010 Lisa Huff – ADEM Field.
RUAA Public Release and Comment Period Nikki Jackson TIAER Project Manager June 27, 2013 Leona River Watershed Partnership Meeting Uvalde, Texas.
Fecal Bacteria Total Maximum Daily Loads (TMDL) in 4 Austin Watersheds Presented to the City of Austin Environmental Board November 7, 2012.
Friends of the Shenandoah River Mission A non-profit, scientific organization dedicated to the preservation and restoration of the aquatic environment.
STREAM MONITORING CASE STUDY. Agenda  Monitoring Requirements  TMDL Requirements  OCEA Initial Monitoring Program  Selection of Parameters  Data.
Water Quality Indicators and Monitoring Design to Support the Albemarle-Pamlico National Estuary Program: A Progress Report Dean E. Carpenter and William.
Texas Surface Water Quality Standards Update Joe Martin Water Quality Standards Work Leader Joe Martin Water Quality Standards Work Leader.
HAMPTON ROADS REGIONAL WATER RESOURCES MANAGEMENT PROGRAM Presentation John M. Carlock, AICP Deputy Executive Director, Physical Planning Hampton Roads.
30 TAC Chapter 307 Texas Surface Water Quality Standards Workgroup meeting March 7, 2007.
Plum Creek Watershed Partnership 2013 Update to Partners and Stakeholders.
Watershed Monitoring *Background Watershed Stewardship Plan-2004 Gap Projects IRWMP-Dec Policies SFEI study-2007 Joint TC/WC meeting-June 2010 *Proposed.
Innovative Solutions for Water and the Environment San Diego IRWMP Regional Advisory Committee Meeting October 9, 2007.
Think about answering the questions: Who? What? Where? When? Why? How? Before your volunteers begin collecting data.
Cottonwood’s Proposed Site-Specific Selenium Standards in the Cherry Creek Basin Comments Presented by: Cherry Creek Basin Water Quality Authority Regulation.
For EBTJV meeting October 26, 2010 Executive Order Strategy for Protecting and Restoring the Chesapeake Bay Watershed.
GALVESTON BAY ESTUARY PROGRAM A CATALYST FOR PARTNERSHIPS AND COLLABORATION Sarah Bernhardt, Ph.D. Lower Rio Grande Valley 18 th Annual Water Quality Management.
IMPLEMENTATION UPDATE Rice County Local Water Management Plan BOARD PRESENTATION JUNE 16, 2015.
Texas Surface Water Quality Standards Update Joe Martin Water Quality Standards Work Leader Joe Martin Water Quality Standards Work Leader.
Presented to: Forest and Watershed Health Coordinating Group/Drought Task Force Watershed Management Subcommittee April 15, 2016 Heidi Henderson TMDL and.
Lower Rio Grande Valley Low Impact Development (LID) Implementation and Education by Brianna Saenz,MS, EIT AUGUSTO SÁNCHEZ-GONZÁLEZ, M.S, CFM. Institute.
James River Chlorophyll Study Status Update: May 3, 2016 Chesapeake Bay Stakeholder Advisory Group John Kennedy, DEQ Office of Ecology.
Arkansas Dept. of Environmental Quality Regulation No
VIRGINIA’S TMDL PROCESS Four Mile Run Bacteria TMDL March 25, 2002
Water Quality Planning Division Monitoring & Assessment Section
Lower Laguna Madre Water Quality
The Basin–Wide Approach New 303(D) Vision
Total Maximum Daily Load Program
Tim Cawthon TCEQ Nonpoint Source Program
Mulberry Watershed Management Plan
Total Maximum Daily Loads of Fecal Coliform for the Restricted Shellfish Harvesting/Growing Areas of the Pocomoke River in the Lower Pocomoke River Basin.
Surface Water Ambient Monitoring Program
303(d) List March 9, 2016 WQC Jeff Manning, DWR
2018 Texas Surface Water Quality Standards Revision
Water Quality Planning Division Monitoring & Assessment Section
Marco island water quality monitoring
Water Quality Planning Division Monitoring & Assessment Section
Procedures to Implement the Texas Surface Water Quality Standards
Texas Surface Water Quality Standards Update
Presentation transcript:

Texas Clean Rivers Program Steering Committee Meetings Nueces River Authority Texas Commission on Environmental Quality Citizens March 3, 2009 – Uvalde March 5, 2009 – Corpus Christi

30,500 square miles 3 Basins 44 SegmentsOverview NRA Area of Responsibility

Overview Funding and Allocation of Resources State fee-funded $9 Million State-Wide for 2 years NRA: $548,272 Project Administration – 21% Quality Assurance – 4% Water Quality Monitoring – 39% Data Management – 13% Data Analysis and Reporting – 9% Stakeholder Participation and Public Outreach – 13% Special Projects: Petronila Creek Continuous Monitoring – 1%

Overview Deliverables Quality Assured Data Data Accessibility via Website 2008 Basin Summary Report (every 5 th yr) 2009 Basin Highlights Report

Coordinated Monitoring Schedule

Overview Clean Rivers Program Water Quality Assessment –2008 – December 1, 1999 – November 30, 2006 –2010 – December 1, 2001 – November 30, 2008 Water Quality Inventory –Concerns – 305(b) list –Impairments – 303(d) list

Use Assessment & Monitoring Parameters Aquatic Life –Dissolved Oxygen Public Water Supply –Chloride –Sulfate –TDS Contact Recreation –Bacteria General Use –Water Temperature –pH –Ammonia –Nitrogen –Phosphorus Fish Consumption –Fish Tissue © Shedd Aquarium/ Aquarium/

Assessment Parameters Concerns 20% of samples > criteria –Ammonia-Nitrogen –Nitrate+Nitrite –Orthophosphorus –Total phosphorus –Chlorophyll-a

Assessment Parameters Impairments TDS, Chloride, Sulfate –Average > criteria DO: grab samples and 24-Hr average –10% of samples < criteria pH –10% of samples outside range E. coli, Enterococcus –Geometric mean > criteria –25% of samples > criteria

Overview Role of the Steering Committee and Stakeholders Objective 4: Inform and Engage Stakeholders 1. Give stakeholders the opportunity to contribute their ideas and concerns through steering committee meetings, public meetings, and/or other forums 2. Participate in public information and education activities to increase stakeholder involvement in the program and interest in water quality issues 3. Communicate information on water quality issues to stakeholders so that priorities may be set considering local, regional, state, and federal needs 4. Support stakeholders, volunteers, and other programs in addressing water quality issues 5. Provide information requested by interested parties and disseminate information via the Internet

FY 2009 Monitoring Sites San Antonio – Nueces Coastal Basin –NRA 11 sites –Copano 12 sites –TCEQ 12 sites

FY 2009 Monitoring Sites Nueces Basin –NRA 18 sites –TCEQ 18 sites

FY 2008 Monitoring Sites Nueces – Rio Grande Coastal Basin –NRA 2 routine sites 6 Arroyo Colorado Special Study CWQM on Petronila Creek –TCEQ 34 sites

Project Updates 2107 Atascosa River TMDL –DO – aquatic life use attainability analysis (UAA) –Bacteria – recreational UAA 2110 Lower Sabinal River TMDL –New WWTF construction during Petronila Creek Above Tidal Continuous Monitoring –Installed December 2006 – cgi-bin/compliance/monops/water_daily_summary.pl?cams=731

Project Updates 2485/2485A Oso Bay/Oso Creek Bacteria –Creek: TSSWCB projects to locate source –Bay: Bacteria UAA for Blind Oso area 2485/2491 Oso Bay/Laguna Madre Low DO –TMDL concluded cause to be natural characteristics –Proposed criteria revision 2001/2003/2471 Mission River Tidal/Aransas River Tidal/Copano Bay TMDL –Bacteria Source Tracking (BST) –TSSWCB/NRA sampling project to support Copano TMDL

Project Updates 2482 Nueces Bay Zinc TMDL –IP approved – documentation of natural attenuation 2201/2202 Arroyo Colorado Watershed Protection Plan – Arroyo Colorado Bacteria Study –Monthly monitoring –Comparison of 3 indicator bacteria 2102 – Nueces River Cleanup

Other Impairments Bacteria –2108 – San Miguel Creek –2109 – Leona River –2117 – Frio River Above Choke Canyon Res. –2481 – Corpus Christi Bay –2492A – San Fernando Creek

Other Impairments TDS –2106 – Nueces River / Lower Frio River Low DO –2116 – Choke Canyon Reservoir

Proposed Changes to Water Quality Standards All classified freshwater segments –E. coli geometric mean: from 126 to Nueces River Lower Frio River –TDS: from 500 to 1080 –Chloride: from 250 to 370 –Sulfate: from 250 to Choke Canyon Reservoir –TDS: from 500 to 830

Proposed Changes to Water Quality Standards 2485 Oso Bay & 2491 Laguna Madre –DO: 24-hr Average from 5 to 4, no minimum, June - October All bays –New designated seagrass propagation use

Outreach Activities Ag Fairs Science Days Festivals Local Fairs Community Meetings Civic Group Meetings Field Trips Workshops

Watershed Models

Groundwater Model

Rainfall Runoff Model

Monarch Madness Festival Aquatic Education Program

Wetland on Wheels

2009 Basin Highlights Report –Draft available for review –Comments by April 30 –Comments to Rocky Freund – –Fax: –Mail: Nueces River Authority 6300 Ocean Drive – Unit 5865 Corpus Christi, TX

Input for FY 2010 Planning Additional routine monitoring sites? Special studies? Additional outreach opportunities? Additional web-based information?

Contact Information Sky Lewey: Rocky Freund: Beth Almaraz: