LCW Upgrades - Final Booster RF Cavity LCW Isolation Valve Replacement. – 8 valves and unions previously replaced – An additional 10 valves and unions.

Slides:



Advertisements
Similar presentations
LCW Upgrades Update Booster Cavity LCW Isolation Valve Replacement. – 8 valves and unions previously replaced – An additional 10 valves and unions were.
Advertisements

Charging. Charging Step 1 Should the lineset length of an installation exceed the charge supplied with the outdoor unit, additional charge will be required.
Proton Source Workshop Booster Downtime Wednesday, December 8, 2010 T. Sullivan.
G2P Target installation and Beyond. Schedule Pivot before.
MOM Report Paul Soler MICE Operations Manager University of Glasgow MICO April 20, 2009.
1 MICE PM Report Installations to date Future installation work Preparations for Phase Two Target status MICE Video Conference, 22nd May, 2008.
A. Bross MTA RF WS August 22, Welcome MTA RF Workshop.
Proton Source Workshop December 7 & 8, 2010 John Reid December 8, 2010.
Proton Source Task Shutdown 2014 RFQ Injection Linac Tank 1 to 2 emmittance probe and Collimator NTF Beam Line Repair 400 MeV Turbo Station Replacement.
NOvA meeting PIP Update W. Pellico. PIP Goals and Scope (Provided in 2011 – Directorate S. H. / DOE Talk ) Goals: Specific to the issues surrounding the.
Fermilab Cavity Refurbishment Status J. Reid M. Slabaugh November 19, 2014 J. Reid 1.
PIP Update July Agenda Summary Update – Budget/RLS – Current Activities – Upcoming Activities/ Changes Update Slides High-Power Ferrite TestingDennis.
08/24/07Shutdown’07 Week 3 F.G. Garcia1 MTA beam line installation Weekly Report August 24, 2007 Period covered: August 17 th to August 24 th (Week 3)
PIP Update Linac Utilities for 2014 shutdown Matthew Gardner, 4/23/14.
ANU Shutdown Status AEM meeting Cons Gattuso 6/3/2012.
ILCTA_NML Progress at Fermilab Jerry Leibfritz September 10, 2007.
Machine Advisory Committee Review APS Upgrade Installation Plan and Schedule John Noonan November 15, 2006.
NUMI NuMI Review of the Infrastructure – W, G & V 20 July 2001 WBS Page 1 1 Infrastructure Review - W.B.S Water Systems Water Systems –Upstream.
Proton Source Vacuum Plan By David B. Augustine Ben Ogert Jr. August 30, 2011.
EMISSION PROBE PARTS TUBE: 3/8” OD x wall Stainless Steel Length determined by pipe diameter and placement of connecting end to allow easy connection.
Proton Source Water Systems Proton Source Workshop December 8, 2010 Maurice Ball.
ANU Shutdown Status AEM meeting Cons Gattuso 7 May 2012.
August 05, Startup 2013 Machine Status:  Proton Source Commissioning and Studies RFQ Injector Line (RIL) Linac Booster  Main Injector Startup.
MFW Pump Discharge Check Valve OE Follow Up Dominion North Anna Power Station Gary W. Liffick FW System Engineer FSRUG, Feb 21-24, 2011.
HINS 6-Cavity Test 3 Month Plan Jan 12, Current Schedule 2-3 day shutdown scheduled to start Jan 18 (Wednesday) to upgrade BPM system and reinstall.
PIP FY14 PMG W. Pellico 7/8/14 7/8/2014PIP PMG. PIP Activities RIL & Linac – 200MHz RF Power System High Level RF Linac Modulator 7835 Procurement – Accelerator.
2015 Shutdown Joe Compton 3/11/2015. RIL PIP Work  Install operational laser notcher  5 days  Dave Johnson & Todd Johnson.
Proton Improvement Plan Bob Zwaska January 7, 2013 All-Experimenters Meeting.
08/31/07Shutdown’07 Week 4 F.G. Garcia1 MTA beam line installation Weekly Report August 31, 2007 Period covered: August 24 th to August 31 st (Week 4)
Refurbished Booster RF John Reid October 24, 2012.
Proton Improvement Plan Keith Gollwitzer January 5th, 2015 All Experimenters’ Meeting 11/5/2015Gollwitzer AEM.
Status and schedule for the H - source upgrade at HINS beam line HINS Meson meeting January 5 th, 2012 L. Prost (most inputs from Steve Hays & Alex Chen)
Booster Bias Supply and Cavity Upgrade November 16 th, 2011.
Proton Improvement Plan Overview Bob Webber July 13, 2011.
PIP Update June 18 th Agenda Summary Update – Current Activities/Updates – Reid, Slabaugh.
09/07/07Shutdown’07 Week 5 F.G. Garcia1 MTA beam line installation Weekly Report September 07, 2007 Period covered: August 31 st to September 7 th (Week.
Series Loop Concept Adv Dis.
Machine Status  Proton Source Commissioning and Studies 8/13-8/14: Linac & Booster Maintenance Period  Main Injector MI30 vacuum ○ Work continues to.
Booster Shutdown Work - Week 4 Dump and Shielding installation completed Q805/Q806 re-installed, Septum in place Need to align quads and septum before.
Building 180 NORMATEF TEST FACILITY Demineralized cooling water station upgrade R. Bozzi / EN-CV.
All Experimenters’ Meeting September 23, Accelerator Operation Summary Calendar Week # 38 NuMI Weekly Integrated Intensity 4.57 E18 protons BNB.
PIP Update Oct 29 th Agenda Summary Update – Current Activities – Updates – Additional Meetings/Notes.
August 2007 Booster RF Upgrades J.Reid Booster RF Upgrades West Gallery LCW modifications: – Headers in select locations to be upgraded by.
MTA Installation Meeting February 21, 2007 Agenda 1)Progress report (Fernanda+Carol) 2)Floor Plan layout (Fernanda+Larry) 3)AOB Key Red – critical Orange.
August 12, Machine Status: 2013  Proton Source Commissioning and Studies RFQ Injector Line (RIL) Linac : Roof hatch installed Booster : Magnet.
Proton Source Meeting, August 8, 2003 – E. Prebys 1 Major Projects in Linac/Booster  New Linac Lambertson  (4) New EDWA magnets in MI-8 line  (3) New.
FESS/Ops Shut Down Summary Week Ending 9/7/12. – FESS needs a CUB Cooling Outage for installation of Barriers in the CUB Chiller 4160 Volt Starter Cabinet.
FESS/Ops Week Ending 1/20/13. CUB Status – Boiler #1 ON LINE CB Kramer due in to Wire in second recirculating Pump and install NFPA 70E mitigations –
09/21/07Shutdown’07 Week 7 F.G. Garcia1 MTA beam line installation Weekly Report September 21, 2007 Period covered: September 14 th September 21 th (Week.
Booster Status, September 4, 2003 – E. Prebys 1 Frantic Shutdown Preparations Continue…
PIP Update Sept Agenda Summary Update – Current Activities Updates/Talks: Ken Domann - Schedule Update and Statusing Ryan Crawford - Linac MCC/Transformer,
1 MICE Hydrogen system Working group mtg – 01/09/14.
FESS/Ops Shutdown Summary Week Ending 3Aug12. CUB Shut-Down Activities Shut Down Plant on July 21 hrs. Electrical – High Voltage Air Switch/Fuse.
5/15/ meeting. -21 work days to shutdown -31 calandar days to shutdown -Today is May 15 th all Jobs are supposed to be entered in the work list.
Muon Long Term Schedule August 15, µ Points to discuss What is the schedule What is the schedule Shutdown schedules Shutdown schedules How do we.
PIP Shutdown Status 9/17/2014. RIL/Linac Jobs L1 Transformer ◦Rigging complete ◦Electrical work started ◦Turn on this coming weekend Laser notcher flange.
Proton PMG September 3 rd 2015 Cons Gattuso AD Shutdown Manager.
ILCTA_NML Progress at Fermilab Jerry Leibfritz August 16, 2007.
PIP Update May Agenda Summary Update – Activities – Budget – Plans Update Slides – Solid StateTom – ModulatorsRene – High Power Ferrite Testing.
Friday 5/1/ meeting. I wish to lock in the power outage onTuesday 5/5/09 at the end of the 0930 lab scheduling meeting speak now or :
EBS-1 # COOLANT FLUID EXCHANGE QUICK REFERENCE ATTENTION: Using the Coolant Fluid Exchange requires the FILL and VAC Valves on the SERVICE.
Mike Andrews August 17, Week 16 NuMI Activities Leak testing of DI bottles & Casks Complete all bottles & casks RAW Impulse line upgrade Finished.
MI/RR Shutdown 2012 Dec Gev Lines/Injection region: Staging equipment, cleaning and prepping new part to start vacuum work. Preparing to modify the.
10/3/2014 Proton Source Update. RIL Update Source B is back in place and under vacuum It will be baked over the weekend It will be started early next.
Mike Andrews January 31, Weeks Activities Target Pile Fan Upgrades Install piping for new cooling coil units Install controls for new coil.
All Experimenters Meeting PIP Report Fernanda G. Garcia on behalf of PIP team 10/06/2014.
Siting/Conventional Facilities Jonathan Hunt PIP-II Machine Advisory Committee 9 March 2015.
S A Griffiths CM42 June 2015 Electrical & Control.
CBETA Technical Review
A. Freyberg Aug 2016 ECT’16 =>
Presentation transcript:

LCW Upgrades - Final Booster RF Cavity LCW Isolation Valve Replacement. – 8 valves and unions previously replaced – An additional 10 valves and unions were replaced during long shut-down. The remaining 20 will be replaced when possible - coordinate with cavity rework schedule. Remaining Stations: 9, 10, 11, 12, 13, 14, 15, 16, 17, 18 Booster Bus LCW Strainer and Isolation Valve Replacement. – Remove existing Y-strainers and replace with basket strainers at wall opposite beamline. Replace isolation valves. Strainers at 6 locations were installed: 1, 3, 6, 7, 13, & 19 Basket strainer and parts for the remaining 7 locations have been purchased and will be installed when possible. 1/9/2013D. Hixson1

LCW Upgrades - Final 1/9/2013D. Hixson2 Old Valves at 03 & 04 New Valves at 03 & 04 Booster Cavity LCW Isolation Valve Replacement

LCW Upgrades - Final 1/9/2013D. Hixson3 Old Strainer & Valves at 07 New Strainer and Valves at 07 Booster Cavity LCW Strainer & Isolation Valve Replacement

LCW Upgrades - Final Finish connection of LCW Return piping in East and West Booster Galleries to LCW Return piping at CUB. – All work was completed at the end of August 2012 LCW Return Pump at CUB – Remove northern most old, existing return pump, and install previously purchased pump, and relocate valves to allow return pump isolation. – All work was completed early October /9/2013D. Hixson4

LCW Upgrades - Final 1/9/2013D. Hixson5 LCW Return Pump and LCW Return Piping at CUB

LCW Upgrades - Final Install LCW Isolation Valves in CUB Utility Tunnel – Work is complete EDWA Magnets – Repipe EDWA magnet coils in parallel instead of in series – Work is complete Remove LCW Piping for Long 13 New Absorber – Remove sections of 95LCW piping and cap – Remove sections of 55LCW Supply and Return – Work is complete 1/9/2013D. Hixson6

LCW Upgrades - Final 1/9/2013D. Hixson7 New Valve in LCW Return from Enclosure New Valve in LCW Supply to Enclosure LCW Enclosure Isolation Valves in CUB Utility Tunnel

LCW Upgrades - Final 1/9/2013D. Hixson8 Removed 55 LCW and Capped 95 LCW Removed 55 LCW and 95 LCW Remove LCW Piping for Long 13 New Absorber

LCW Upgrades - Final Miscellaneous LCW Work – Magnet bus hose fittings for drainage – Repair Choke leaks and Choke Tubing – Remove Candy Cane Stop-Cocks and plug – Replace Long 3 LCW Hoses – Replace 400 MeV LCW hoses up chute – Install LCW bypasses at return valves in the Galleries – Work above is complete 1/9/2013D. Hixson9

LCW Upgrades - Final Booster Refill, Leak Testing, Commissioning and Balancing – Booster LCW has been refilled – Leak checking complete (never really complete!) 1/9/2013D. Hixson10