1 October 2004 Cutting-Edge Software for Managing Gas Production and Storage Operations.

Slides:



Advertisements
Similar presentations
WMobile Desktop Browser Preview. Desktop Browser Background wMobile customers use mobile web UI as a lightweight desktop access point to GoldMine wMobile.
Advertisements

1 Location of Partners and customers Who are our customers? MSSL Centre for Process engineering European Space Agency JOANNEUM RESEARCH Swedish Research.
1 Virtual Resource Management (VRM) in Cloud Environment draft-Junsheng-Cloud-VRM-00 Friday 21 Jan 2011 B. Khasnabish, Chu JunSheng, Meng Yu.
Chapter 15 - Material & Capacity Requirements Planning(MRP/CRP)
Transparent, Repeatable, Defendable, and Published Generation, Transmission & Nat Gas Network Co-Optimizations
Succeeding with Technology 4 th ed > Information, Decision Support…> Please discontinue use of cell phone and turn off the ringer. Decision Making and.
1 Alain Prioul Flexibility / Adaptability. 2 Definitions Flexibility Ability to follow customer demand at different Takt Time Ability to quickly change.
Systems Analysis & IT Project Management Pepper. System Life Cycle BirthDeathDevelopmentProduction.
Aggregate Planning.
Henry Neeman, 2 Dimitrios V. Papavassiliou 1 1 School of Chemical Engineering and Materials Science 2 School of Computer Science The University of Oklahoma.
Modelling Developments at Power Systems Research Tom Halliburton EPOC Meeting 9 th July 2014.
Operations Management
4 1 4 C H A P T E R Software: Systems and Application Software.
SUSTAINABLE OPERATION OF THE YAQUI RESERVOIR SYSTEM.
Management Information Systems vs. Decision Support Systems
Next Generation Factory Layouts Saifallah Benjaafar, University of Minnesota Shahrukh Irani, Ohio State University Sunderesh Heragu, Rensselaer Polytechnic.
Decision Support Systems for Supply Chain Management Chap 10 王仁宏 助理教授 國立中正大學企業管理學系 ©Copyright 2001 製商整合科技中心.
CASE Tools CIS 376 Bruce R. Maxim UM-Dearborn. Prerequisites to Software Tool Use Collection of useful tools that help in every step of building a product.
Palletizing the Easy Way
Working With Databases. Questions to Answer about a Database System What functions the marketing database is expected to perform? What is the initial.
UNC Modification Proposal 0116 Reform of the NTS Offtake Arrangements Transmission Workstream 5 th October 2006.
General Purpose 3D Cellular Automata Modeller. A Regular Lattice of Cells, each obeying the same set of rules Simple rules for individual cells can produce.
Supply Chain Management
Chapter 4 How Businesses Work McGraw-Hill/Irwin Copyright © 2012 by The McGraw-Hill Companies, Inc. All rights reserved.
CNJohnson & Associates, Inc An Overview of Chargeback Best Practices.
Ludington Pumped Storage Plant and Wind Power Operational Considerations David Lapinski Consumers Energy Company June 16, 2009.

Module on Computation of PoC Transmission Charges
 UK Power Networks. All rights reserved Demonstrating the benefits of energy storage on an 11 kV Distribution Network Matthieu Michel – Technology.
Lecture 1 Water Distribution Systems
Staff Scheduling at USPS Mail Processing & Distribution Centers A Case Study Using Integer Programming.
Maraco Inc What Is GasPal? 2.
Network Analysis - Introduction Transmission Planning Code Workshop 2 1 st May 2008.
Version 4.0. Objectives Describe how networks impact our daily lives. Describe the role of data networking in the human network. Identify the key components.
1 ISA&D7‏/8‏/ ISA&D7‏/8‏/2013 Systems Development Life Cycle Phases and Activities in the SDLC Variations of the SDLC models.
Chapter 1 In-lab Quiz Next week
File Processing - Database Overview MVNC1 DATABASE SYSTEMS Overview.
Querying Large Databases Rukmini Kaushik. Purpose Research for efficient algorithms and software architectures of query engines.
Copyright ©2013 Pearson Education, Inc. publishing as Prentice Hall.1-1 Course Code MGT 561 Supply Chain Management Book: Supply Chain Management Strategy,
Production Planning and Detailed Scheduling (PP/DS) in SCM EGN 5623 Enterprise Systems Optimization (Professional MSEM) Fall, 2011.
Topics of presentation
1 Scheduling the TVA Hydro System Using RiverWare’s Optimization Suzanne H. Biddle, P.E. Tennessee Valley Authority.
Flow Margin Assumptions for NTS Planning and Development Transmission Planning Code Workshop 3 5 th June 2008.
Systems Analysis and Design in a Changing World, Fourth Edition
Transmission Planning Code – Design Margin Update Transmission Workstream, 4 th February 2010.
Graphical User Interface and Job Distribution Optimizer for a Virtual Pipeline Simulation Testbed Walamitien Oyenan October 8, 2003 MSE Presentation 1.
Copyright ©2013 Pearson Education, Inc. publishing as Prentice Hall.1-1 Course Code MGT 561 Supply Chain Management Book: Supply Chain Management Strategy,
What is virtualization? virtualization is a broad term that refers to the abstraction of computer resources in order to work with the computer’s complexity.
CASE (Computer-Aided Software Engineering) Tools Software that is used to support software process activities. Provides software process support by:- –
Project Chiron SMU TEAM ALCON
Decision Support Systems (DSS)
Chapter 12 Distributed Data Bases. Learning Objectives What a distributed database management system (DDBMS) is and what its components are How database.
Demand Side Investment Planning Transmission Planning Code Workshop 2 1 st May 2008.
PROPRIETARY  2003 Data Research Analysis & Consultancy Solutions All Rights Reserved. This is achieved by: Improving availability / reducing stock outs.
Operation and Control Strategy of PV/WTG/EU Hybrid Electric Power System Using Neural Networks Faculty of Engineering, Elminia University, Elminia, Egypt.
Underground Natural Gas Storage: ensuring a secure and flexible gas supply Jean-Marc Leroy GSE President Gas Coordination Group - 13 January 2010.
ICT in Product Manufacture ICT based Production Scheduling and Logistics.
Fault – Tolerant Distributed Multimedia Streaming Web Application By Nirvan Sagar – Srishti Ganjoo – Syed Shahbaaz Safir
INTRODUCTION TO XSEDE. INTRODUCTION  Extreme Science and Engineering Discovery Environment (XSEDE)  “most advanced, powerful, and robust collection.
Novel Data Integration for Production Optimization: Two Case Studies
Introduction to Management Accounting
Best Practices Consortium
Production Management System
LOGISTICS NETWORK.
13 Aggregate Planning.
Project Chiron SMU TEAM ALCON
Planning and Scheduling in Manufacturing and Services
Wide Area Workload Management Work Package DATAGRID project
Project Chiron SMU TEAM ALCON
Demonstration of POM Flowline Optimizer
Presentation transcript:

1 October 2004 Cutting-Edge Software for Managing Gas Production and Storage Operations

2 1.Goal of forthcoming initial release targeted for 1 st Quarter, 2005: Accurate prediction of performance of gas storage reservoir/compressor/pipeline systems with a speed that allows hourly/daily scheduling of compressors for production and injection. Schedules obtained are efficient and economic. Given a complete database GasPal allows operations to be quickly rescheduled in response to new opportunities or unexpected changes in available equipment and/or supply/demand requirements. GasPal, focusing on operational planning, is a logical counterpart to Maraco’s GasTop software, which performs optimal investment planning for storage operations.

3 GasPal Characteristics GasPal: foundation is a PC-based gas reservoir simulator. GasPal: complex surface network may include splits, loops and multiple offtake points. GasPal: each of several reservoirs may have up to 5 producing layers GasPal: GRIDDER™ preprocessor inserts arbitrary number of computing cells into each reservoir. GasPal: simulates injection and production or a mixture of the two, providing full storage scheduling flexibility. GasPal: hourly, daily or monthly time steps accommodate short-, mid- and long-term planning needs. GasPal: optimizes service allocation and size of possible compressor configurations.

4 Operational Planning Scope Short-term operation: hourly time steps for two weeks. Useful for immediate injection/withdrawal planning. Mid-term planning: daily time step for one year. Useful for overall storage planning. Long-term production : monthly time step for 30 years. Useful for regular gas reservoir production or blowdown.

5 Surface Flow Capabilities: Splits, Loops & Offtake Points Produce against or inject with a given back pressure Produce or inject a requested rate profile Split flow at node Choke total flow or either flowline

6 Surface Line Capabilities: Multiple Reservoirs Choke each producing cell and/or reservoir to produce requested rate Each cell in each reservoir may have different characteristics

7 Surface Line Capabilities: Compressor Optimization Compressor locations and sizes optimized to maximize withdrawal, injection and inventory revenues Work is now underway on GasPal’s compressor scheduling capability

8 Reservoir: Arbitrary Number Of Simulation Cells Faults Computing mesh generated by GRIDDER

9 Reservoir: Multiple Layers

10 Results From Current Development Version Of GasPal October 2004

11 Interface Layout Surface network Output Results Reservoirs Offtake points

12 Reservoir Output

13 Flow Rate Through Each Pipe

14 Pressure Drop Across Each Pipe

15 Offtake Rate: Fixed Back Pressure

16 Pressure: With Offtake Rate Fixed

17 Bi-directional Flows Gas flow direction is determined by system pressure distribution

18 Reverse Flow Dictated by pressure at end nodes, flow can be reversed Reversed flow displayed as “negative”