Health and Safety Executive Health and Safety Executive Dropped Objects Update November 2011 Donald Dobson Health & Safety Executive Offshore Division.

Slides:



Advertisements
Similar presentations
The Rossway Safeway Roof Safety Protection system is installed on top of roof purlins. The Rossway Safeway system consists of a platform deck with handrail.
Advertisements

Step 1: Digging a Cellar On land, a majority of wells begin with digging a cellar from three to fifteen feet in depth. The purpose of a cellar is to align.
DROPS Forum - BP Trends in North Sea Drilling Sean Young Wells HSE Advisor Marcliffe Hotel April 2011.
Health and Safety Executive Health and Safety Executive Dropped Objects Update September 2013 Donald Dobson Health & Safety Executive Offshore Division.
Clark–Reliance Company Manufacturing Update Presented to General Electric July 17, 2007.
Drilling Contractor Safety
Present Procedure for cutting stuck casing on Drilling PLATFORM
© the Design and Technology Association Health and Safety Training Standards in Design and Technology S8HS PLANER/THICKNESSER MACHINE Specialist Extension.
BEDRE GJENNOM KUNNSKAPSDELING SHARING TO BE BETTER CAKE Q2 LIFTING INCIDENT.
M760 TOWER CRANES ERECTION
Servicing Welch DRYFAST ULTRA Pump Models 2032
1 Struck-By Module 3. 2Objectives After this module you should be able to – identify the most common struck-by hazards – take the necessary steps to avoid.
Ropes and Knots Skill Drills.
Struck-By/Caught-Between
MER/SUP 1 DOOR EVAPERATOR DRAIN PAN REPLACEMENT 1. Remove the (4) screws that secure the evaporator coil, using a 5/16” socket.
Assembly Instructions Additional documents needed for Assembly: GA Drawings on all Units Header Platform GA Drawings Motor Deck Platform GA Drawing Packing.
MCEPS UPDATE May 16, FY 2012 OIL & GAS FATALITIES SINCE OK STAND DOWN Aug 13Employee fell from drilling rig mast during rig-up Aug 27O&G heater/treater.
14 Ventilation Skill Drills. 2 Objectives (1 of 2) Break glass with a hand tool. Break a window with a ladder. Break windows on upper floors using the.
Petroleum Engineering 406
Crane Operations Objective
AMS-02 Cryosystem Phase III Flight Safety Review January 12, 2010 Phil Mott.
INTRODUCE SELF AND EXPLAIN GOING TO COVER BASIC
Shipbreaking Module 4: Heavy Equipment & Material Movement 4.1 Hoisting, Emergency, Inspect Susan Harwood Grant Number SH F-23.
Health and Safety Executive Health and Safety Executive Dropped Objects Update January to March 2011 Donald Dobson Health & Safety Executive Offshore Division.
OFFSHORE MISHAPS AND ACCIDENTS
BASIC MUD LOGGING.
Most Frequently Cited Serious Violations Construction – FY 2008.
Cargo Gear Survey … …………………......……………... ILO 32 ………………….…..……………………………. ILO ………………………………... TNS 15 Regulations.
HVACR416 - Design Pressure Measurement Part 2. Pressure Measurement Several pressure measurements exist. They all measure the same things, the force of.
Petroleum Engineering 406 Floating Drilling
ALOKRAJ. V - NA07B004. High Pressure Water Jet Blasting Machine  One Electric driven water blasting machine  2 water jet guns, hoses 400 feet each as.
National Drilling Company DROPPED OBJECTS HUNT DAY By MORCHED ALILA Senior Safety Engineer November 29, 2010.
State Of Wisconsin Employee Injury's Tracie Ninedorf Risk Manager.
CMS ZDC Remote Handling Status LTEX Meeting - Sept. 13, 2012 The Crane Testing and Development has moved from SX5 to ISR: Crane #2 has been fully assembled,
DROPS FORUM 9 th February Racks of 7” Line piping were loaded onshore, upon arriving at the location the deck crew noticed a 24V impact driver lying.
Most Frequently Cited Serious Violations Construction – FY 2009 OSHA Federal Standards October 1, 2008 – September 30, 2009.
Ropes and Knots Skill Drills.
Stair Construction and Layout
Progress Completed Order/Fabricate SS Piping for HBD Purge gas from all detectors DAQ tests Prep. for Shutdown work (open doors, move carriages, etc. Pave.
Ventilation Skill Drills.
EDC DROPS Status 30 November 2010 By Richie Adams.
Fire/General Service/Ballast Pumping Systems
Model 12 Intek Horizontal OHV
Health, Safety and Environmental Update November 2015 Purpose: The intention of this briefing is to pull together and share both Optimise and other contractor.
ALOKRAJ. V - NA07B004. General All deck machinery and construction equipment are to be supplied and installed to meet classification, intended operational.
ELLIPTICAL HEAD PROTECTING COVER 01_INSTRUCTION DISCONNECTING THE ELLIPTICAL HEAD.
Health and Safety Executive Health and Safety Executive Dropped Objects Update February 2016 Donald Dobson Health & Safety Executive Offshore Division.
 Is the room or platform from which the ship can be commanded. When a ship is underway the bridge is manned by an OWO (officer of the watch) aided usually.
Warehouse Safety Is This You????.
Death of Victim Struck by Crane Handling Jig Grave Accident Case in Manufacturing Sector 교육미디어
PROCEDURE OF SKYTOP AC-SCR RIG HANDLING
Dropped Objects 12 April 2011.
Maintenance masterdrive siemens
April Pro Star Well Servicing has designed an automated service rig that does not require a roughneck on the floor or a derrick hand up the derrick.
Don’t pull a twisted sling
This is a front view of the impeller inlet
Most Frequently Cited Serious Violations
6. Disassembly & Reassembly
Parts Wellhead All casing strings, except for liners, are suspended from a wellhead. On a land well or offshore platform the wellhead is just below.
يوم السلامة 2012 اقتطع وقتا للسلامة.
PDO Second Alert Stay out of the line of fire What happened:
PDO Incident First Alert- Dalma
Rigging a CL16.
Safety and Welfare.
A presentation on the UNIK positive tubular plate filling machine
IOES Guidance Document
Whipstock. AGENDA DefinitionComponents Operation Sequence 2.
Robot Deployment System
LIFT,ESCALATOR AND MOVING WALKS
Polarized 3He target installation
Presentation transcript:

Health and Safety Executive Health and Safety Executive Dropped Objects Update November 2011 Donald Dobson Health & Safety Executive Offshore Division

Dropped objects – quarterly totals

2011 January to November - All Incidents

Derrick & Well Ops Incidents

Well service mast fell over in extreme wind. Following jarring, bumper bar (10kg) detached from racker & fell 25m to rig floor. Floodlight (18kg) fell 20m to rig floor. Laying out coiled tubing BHA, section (16.3kg) detached & fell 6.4m to rig floor. Removing low-torque valve (43 kg) from completion string, HWU hand dropped valve 24m to skid deck. Sling parted lowering choke hose (1715kg) through rotary table, hose fell 43m into sea. Top-drive service loop snagged on derrick; end pulled from top- drive, dropping 30m to rig floor. Picking up wire-line valve (130kg), it detached from running tool & fell 4.3m to rig floor. Using tong head (42kg) as counter-weight on tugger, attachment point failed; head fell 6m to rig floor

Crane & Lifting Operations

“Chandelier” & whip-line limit switch detached from crane, falling 45m to deck of vessel Lifting vent fan motor (208kg) into place, nylon sling melted by turbine exhaust gas. Motor fell 2m onto grating. Moving catwalk machine, tag line snagged handrail which fell 3m Tag line snagged torque wrench (7.4kg), knocking it off lower riser assembly, striking IP on knee.

Other dropped objects

Other Dropped Objects Section of ventilation ducting (500kg) dropped 8m onto walkway below Scaffolder struck redundant flood light fitting with pole; fitting (25kg) fell 3.5m. Ceiling panel & emergency lighting unit (18kg) fell 2.2m. Large spanner (1.26kg) dropped 7m from scaffolding to deck. Stacking blank flange (31kg) it slipped between handrail and kick plate, falling 4.7m to stairway below. Scaffold board (4.8kg) on port bridge deck dislodged by helicopter downdraft & fell to C deck 10m below. Deck hatch lifting point cover fell through lifting point when scaffolder stood on it