CEMTEK CEMS Users Group Meeting and Forum September 24-25, 2009 Santa Ana, California RKI Specific DAHS Training and RECLAIM Updates Presented by Norm Iseri, RKI Engineering.

Slides:



Advertisements
Similar presentations
1 The Regional Clean Air Incentive Market (RECLAIM) May 29, 2014May 29, 2014May 29, 2014 David Porter.
Advertisements

Electronic Data Submissions Washington, DC June 10, 2004 Presenter: Ujjval Shukla U.S. EPA.
Common Monitoring and Reporting Errors Louis Nichols Clean Air Markets US EPA March 2007.
PART 75 SPAN & RANGE Manuel J Oliva Clean Air Markets Division
General Monitoring Requirements and Options
Harmonization of Part 60 and Part 75 CEM Requirements Robert Vollaro
Harmonization of Parts 60 and 75
EPA Proposed Mandatory Greenhouse Gas Reporting Rule.
EPA Proposed Mandatory Greenhouse Gas Reporting Rule.
Air Permitting and Compliance Smithfield Foods Environmental Conference Chicago, IL July 2013.
Preventing and Resolving Reporting Errors Using Monitor Data Checking Software (MDC) Louis Nichols Clean Air Markets Division.
Evaluating Emissions Trading Using a Nearest (Polluting) Neighbor Estimator Meredith Fowlie (Michigan and NBER) Stephen Holland (UNC at Greensboro and.
RECLAIM Monitoring, Recordkeeping and Reporting (MRR)
1 Proposed Rule: Amendments to the Protocol Gas Verification Program and Minimum Competency Requirements for Air Emission Testing Presented at May 12,
AQS Data Handling (Under the Hood) AQS Conference August 23, 2012 Robert Coats.
1 NOx RECLAIM Market “Where is it headed and what should we be doing?” Tom Ishii Project Manager Gas Engineering Dept. October.
Update: National Ambient Air Quality Standards Association of California Airports September 15, 2010 Phil DeVita.
Data QA/QC Techniques. Copyright VIM Technologies, Inc. All Rights Reserved. VIM’s 10-Step Program To Compliance Success 2.
Louisiana Department of EnvironmentalQuality LDEQ CAM Plan Overview LDEQ’s 27 th Annual Conference on the Environment Cajundome Convention Center Lafayette,
Planned Revisions to 40 CFR Parts 72 and 75 Matthew G. Boze U.S. EPA Clean Air Markets Division.
Maintenance Modifying the data –Add records –Delete records –Update records Modifying the design –Add fields into tables –Remove fields from a table –Change.
AQS Concepts. In This Section We Will Talk About AQS Concepts 2 AQS Background History AQS as part of a monitoring program Types of Information in AQS.
A History and Status of CEMS Applications in USEPA Regulations Dale Evarts US EPA December 16, 2002 Better Air Quality in Asian Cities 2002
© SAIC. All rights reserved. NATIONAL SECURITY ENERGY & ENVIRONMENT HEALTH CYBERSECURITY The Potential High Cost of Simple Systems Engineering Errors Jim.
CALIFORNIA AIR RESOURCES BOARD DIESEL EMISSIONS STANDARDS AL UPTON BUTTE COUNTY FLEET MANAGER  Four separate rules apply to Public Agencies  On-Road.
What Are File Maintenance Techniques and Validation Techniques?
Presented by: Mike Hamdan South Coast Air Quality Management District Diamond Bar, CA Presented at: The Tribal Air Monitoring Training, Pechanga Reservation,
© Copyright, Yorke Engineering, LLC 2008 SCAQMD Rule Compliance Steps and Strategies Judy Yorke and Bipul K. Saraf Yorke Engineering, LLC
Clean Air Markets Program Data
101 P C O L S Recommended Role: New and Existing Resource Managers How to Redeem a Resource Manager Token in AIM I N T E R A C T I V E T U T O R I A L.
Topics Covered: Data preparation Data preparation Data capturing Data capturing Data verification and validation Data verification and validation Data.
Delivering sustainable solutions in a more competitive world GHG Mandatory Reporting Rule – Implications for PSD Review for GHG September 2012 Ramesh Narasimhan.
Offtake Metering Errors Stephen Skipp Asset Manager (Transmission and Storage)
Implementation of US Cap and Trade Programs
Success of Market-Based Approaches The Success of Market-Based Approaches in Air Quality Management in the United States Kevin Rosseel Office of Atmospheric.
1 Dec. 8, 1997 LEADS Quality Assurance Summary Robert Brewer (512) Monitoring Operations Division Network QA Manager.
AMP255 – Precision and Bias Data Report 2008 AQS Conference The AMP255 Precision and Bias Data Report August 22, 2008 Presented by Jonathan Miller EPA.
1 ARRA Recipient Reporting FederalReporting.gov Briefing In-Bound Recipient Reporting April Reporting Cycle Enhancements March 29, 2010.
Copyright © 2013, ESC | Environmental Systems Corporation Understanding ProcessNow Mark Astudillo Director of Training.
| Philadelphia | Atlanta | Houston | Washington DC Boiler MACT Compliance Plans: Failure to Develop Plans Is Planning to Fail Susie Bowden|
Supplemental Statements of Water Diversion and Use How to file the triennial reports New Part 3: Monitoring Devices.
Notices to Comply (NTC) and Notices of Violation (NOV) March 22, 2006 Peter Moore Yorke Engineering, LLC x24
PA Department of Environmental Protection Continuous Source Monitoring Manual (Manual, Revision 8)
Control Chart Methodology for Evaluating CEMS Data
© 2012 The Williams Companies, Inc. All rights reserved. GHG Reporting Update Rocky Mountain EHS Peer Group January 17 th, 2013 Laura London, P.E.
1 Emission and Air Quality Trends Review Connecticut July 2013.
RECLAIM Seminar October 26, 2005 Judy B. Yorke, P.E., C.P.P. Yorke Engineering, LLC x25
Title V Operating Permits: A Compliance and Enforcement Tool Candace Carraway US Environmental Protection Agency Office of Air Quality Planning and Standards.
Clean Air Interstate Rule (CAIR) CAIR Model Cap and Trade Rules: Unique Elements and Flexibilities Office of Air and Radiation March 2005.
Compliance Assurance Monitoring (CAM) November 24, 2009.
Update on Methane Regulations Affecting Landfills Pat Sullivan Senior Vice President SCS Engineers Nov. 10, 2015.
LEADS/EMS DATA VALIDATION IPS MeteoStar December 11, 2006 WHAT IS VALIDATION? From The Dictionary: 1a. To Make Legally Valid 1b. To Grant Official.
Air Quality Management Comparison of Cap-and-Trade, Command-and Control and Rate-Based Programs Dr. Ruben Deza Senior Environmental Engineer Clean Air.
Emission source sampling and monitoring Topic 6 Ms Sherina Kamal May
Method 203 Quality Assurance/Quality Control Requirements for Continuous Opacity Monitoring Systems (COMS)
1 Emission and Air Quality Trends Review New Hampshire July 2013.
1 Emission and Air Quality Trends Review Idaho July 2013.
WHAT IS THE CHEROKEE NATION? Cherokee Nation Air Quality Data Management Concepts for Quality Data Collection Ryan Callison.
Data Editing Strategies Common edits Invalidation vs. contamination? What is a considered a spike? What not to edit! Automatic edits Reasons for edits.
Proposed Amendments to Fuel Test Methods Monitoring and Laboratory Division January 25, 2013.
NAAQS Status in GA & PSD Inventory Update James W. Boylan Georgia EPD – Air Protection Branch Manager, Planning & Support Program AWMA Regulatory Update.
OSHA A GUIDE TO THE NEGATIVE EXPOSURE ASSESSMENT.
1 EUROPEAN TOPIC CENTRE ON WATER EUROWATERNET Towards an Index of Quality of the National Data in Waterbase.
2007 Emissions Inventory. Topics First emissions inventory under Clean Air Action Plan (CAAP) Emissions inventory methodology Cargo throughput changes.
RACT 2 – Source Testing and Monitoring Requirements Air Quality Technical Advisory Committee August 4, 2016 Harrisburg, PA Tom Wolf, GovernorPatrick McDonnell,
Complying with Periodic Emissions Monitoring Requirements
Enforcing the NAAQS Case Study Sean Taylor
ETS – Air Data submission Training
LAMAS January 2016 Agenda Item 2.1 Structure of Earnings Survey (SES) Eusebio Bezzina Jean Thill.
Emission and Air Quality Trends Review
Presentation transcript:

CEMTEK CEMS Users Group Meeting and Forum September 24-25, 2009 Santa Ana, California RKI Specific DAHS Training and RECLAIM Updates Presented by Norm Iseri, RKI Engineering LLC

Agenda Discuss RECLAIM Regulations Present RKI PODS Screen specific to RECLAIM Question and Answer Copyright 2009. All Rights Reserved. RKI Engineering LLC

Air Quality Regulations SCAQMD RECLAIM Rule 2011 SCAQMD RECLAIM Rule 2012 SCAQMD Rule 216 Not covered in this presentation EPA 40 CFR Part 60 EPA 40 CFR Part 75 Copyright 2009. All Rights Reserved. RKI Engineering LLC

SCAQMD RECLAIM NOx/SOx RECLAIM – REgional CLean Air Incentives Market Started January 1, 1994 Businesses that beat their reduction targets can trade their credits on the open market. Using market forces allows pollution to be cut in the most economical way. Move away from traditional command-and-control rules SCAQMD Rule 2011, RECLAIM SOx SO2 (ppmv), Stack Flow, SOx Lbs/hr SCAQMD Rule 2012, RECLAIM NOx NOx (ppmv), Stack Flow, NOx Lbs/hr Copyright 2009. All Rights Reserved. RKI Engineering LLC

CEMS/DAHS Continuous Monitoring of emissions Perform Daily Calibration Perform other QA Activities, i.e. RATA Identify problems for alarming Display emissions for control, if required Insure valid emissions data is being collected Apply appropriate Missing Data Procedures Copyright 2009. All Rights Reserved. RKI Engineering LLC

RECLAIM Valid Hourly Data Four (4) Valid 15-Minute Period Only four (4) Maintenance/QA Hour are valid were the hour has between 2-3 valid 15-minute periods Maintenance/QA Hour with 2-3 valid 15-minute periods beyond the first four hours are invalid Copyright 2009. All Rights Reserved. RKI Engineering LLC

RECLAIM Valid 15-Minute Average Only one valid minute data is required to calculate a valid 15-minute period All valid CEMS data are used in the 15-Minute Average regardless of operations Copyright 2009. All Rights Reserved. RKI Engineering LLC

RECLAIM Valid Minute Data (Part 1) CEMS data is invalid during: Calibration in Progress Maintenance and Quality Assure Activities CEMS Out of Control Stack Flow based on Fuel Flow, O2 > 19% Emissions between 10-95% of range Invalid when emissions is greater than 95% range Emissions limited to 10% of range when emission drops below 10% Spike Test can be used to certify analyzer below 10% range Copyright 2009. All Rights Reserved. RKI Engineering LLC

RECLAIM Valid Minute Data (Part 2) Other reasons for invalid CEMS data Missing Daily Calibration when Device had operated in the day Missing Daily RTU transmission Failed RATA and other Failed QA activates Copyright 2009. All Rights Reserved. RKI Engineering LLC

Emission Rate Calculations NOx Lbs/Hr = 0.1195*NOx (ppmvd)*Stack Flow (mscfh) SOx Lbs/Hr = 0.1662*SO2 (ppmvd)*Stack Flow (mscfh) NOx and SO2 are directly measured Stack Flow can be measured directly or calculated Calculated Stack Flow Can be used with consistent fuel type, i.e. Natural Gas Based on fuel flow, Higher Heating Value (HHV), Fd, O2 For natural gas, HHV default is 1050 and Fd is 8710 Copyright 2009. All Rights Reserved. RKI Engineering LLC

Relative Accuracy Test Audit Determine accuracy of CEMS, Relative Accuracy Determine Bias Adjustment Factors, 1 or greater Semi-Annual/Annual RATA Meet Incentive – Annual RATA Failed RATA Invalid CEMS data RECLAIM Missing Data Procedure is applied Successful RATA is required to start collecting valid CEMS data RATA not completed within the required quarter Request for Variance RECLAIM Missing Data Procedure still applies Copyright 2009. All Rights Reserved. RKI Engineering LLC

Bias Adjustment Factors (BAF) NOx/SOx BAF NOx Bias Adjust = NOx ppmv * BAF for NOx SOx Bias Adjust = SOx ppmv * BAF for SOx Stack Flow BAF Stack Flow Bias Adjust = Stack Flow * BAF for Stack Flow NOx/SOx Lbs/Hr BAF (Two Methods) Based on RATA Results NOx Lbs/Hr Bias Adjust = NOx Lbs/Hr * BAF for NOx Lbs/Hr Based on NOx/SOx BAF and Stack Flow BAF NOx Lbs/Hr Bias Adjust = NOx Bias Adjust * Stack Flow Bias Adjust Copyright 2009. All Rights Reserved. RKI Engineering LLC

RECLAIM Missing Data Procedures Apply RECLAIM Missing Data Procedures (MDP) Invalid NOx/SOx (ppmv) Invalid Stack Flow Invalid NOx/SOx Lbs/Hr: When ppmv and Stack Flow are invalid RECLAIM Missing Data Procedures 1N Procedure Max value for previous 30 days Max value for previous 365 days Max value for the service of the CEMS MDP Method applied is based on duration of missing data period and the % Availability % Availability = Valid Monitoring Hours for previous 365 days/Operating Hours for previous 365 days) Copyright 2009. All Rights Reserved. RKI Engineering LLC

RTU Reporting Requirements RTU – Remote Terminal Unit Daily Transmission: NOx/SOx Major Source Monthly: NOx/SOx Major Source Aggregate NOx/SOx Large Source Quarterly: NOx/SOx Large Source Aggregate NOx/SOx Process Units NOx/SOx Rule 219 Exempt Equipment Copyright 2009. All Rights Reserved. RKI Engineering LLC

RTU Deadlines Daily Monthly Quarterly 5 pm for the following day Additional 24 hours extension due to problems related to power, computer, or other system failure Monthly 15 days after the end of the month Quarterly 30 days after the end of the quarter 60 days after the end of the compliance year Copyright 2009. All Rights Reserved. RKI Engineering LLC

RTU Record Identifier There are three (3) RTU Record Identifier ADD: 1 UPDATE: 2 DELETE: 3 The initial reported CEMS data is identified with an ADD RTU record identifier Any subsequent ADD RTU records are rejected An UPDATE RTU record is used to correct previously transmitted RTU record A DELETE RTU record is used in removing erroneously RTU records Copyright 2009. All Rights Reserved. RKI Engineering LLC

Daily RTU File Data Daily NOx/SOx Lbs to two decimal precision per Fuel Type for each Major Source Daily CEMS Status Valid Data - All hours are valid Calibration – Calibration was performed Offline – CEMS was in maintenance/shutdown Alternative Data – Other forms of emission recording Fuel switch – Multiple Fuel Type 10% - Reported emission using 10% range limit Below 10% - Reported emissions below 10% range limit Non-operational – Process was off Copyright 2009. All Rights Reserved. RKI Engineering LLC

Monthly/Quarterly RTU File Data Reported NOx/SOx Lbs to two decimal precision per Fuel Type Aggregate NOx/SOx Lbs to two decimal precision Copyright 2009. All Rights Reserved. RKI Engineering LLC

RECLAIM Response Message Response Packet: Upon receipt of the data file, the host will send a response packet which indicates that the data file was good, or that it was bad. Response message for good data file: OK_ _#####_sdddlyyjjjhhmmss Response message for bad data file: BAD_#####_[ASCII text message (up to 23 characters)] s = system# (alpha/num.) ddd = Ldev (MDI port#) (alpha/num.) l = Leaf/Modem no. (port Modem#) (alpha/num.) yy = Year (num.) jjj = Julian day of year record sent to PDN (001 - 365) hh = Hour (00 - 23) mm = Minutes (00 - 59) ss = Seconds (00 - 59) Copyright 2009. All Rights Reserved. RKI Engineering LLC

SCAQMD Waters Website http://www.aqmd.gov/waters RKI Engineering LLC Copyright 2009. All Rights Reserved. RKI Engineering LLC

RKI PODS Screens specific to RECLAIM RTU Transmit Status RTU Transmitted Data Major Source CEMS/RTU Reports Major Source CEMS/RTU Daily Scan Major Source Substitute Emissions Other Source RTU Reports Copyright 2009. All Rights Reserved. RKI Engineering LLC