Reduce Unnecessary Disturbance Part 3 U.S. Department of the Interior Bureau of Land Management November 2006.

Slides:



Advertisements
Similar presentations
Safety Absolutes Green Lake
Advertisements

NOTICE TO OPERATORS DRILLING WELLS WITHIN 3/4 MILE OF THE RIM OF THE ROAN PLATEAU IN GARFIELD COUNTY PIT DESIGN, CONSTRUCTION, AND MONITORING REQUIREMENTS.
Golf Course Construction Planning TRF 250 Golf/Sports Field Construction.
U.S. Department of the Interior Bureau of Land Management Wildlife Management Updated: January 2013.
Home with an Underground Heating Oil Tank (UST) Solutions for your Leaking Heating Oil Tank.
Oil and Gas Industry Presentation Activities, GHG Emission Sources, and Potential Reductions January 14, 2009.
Choice of Color Part 4 U.S. Department of the Interior Bureau of Land Management June 2007.
Drilling Gas Wells: Beginning to End. Seismic Exploration.
MINING OPERATIONS ON NATIONAL FOREST SYSTEM LAND APPROVING, MONITORING, AND RECLAIMING OPERATIONS MINING OPERATIONS ON NATIONAL FOREST SYSTEM LAND APPROVING,
At the Jewett Lignite Mine. the re-establishment of the stream system that existed prior to disturbance… the re-establishment of the stream system that.
Hickory Hills Lake Management Committee Erosion Control sub committee Tom BertramJane Blake.
Introduction to Surface Irrigation
U.S. Department of the Interior Bureau of Land Management Wildlife Management November 2006.
E4014 Construction Surveying
CONSTRUCTION BEST MANAGEMENT PRACTICES (BMPs) CONSTRUCTION GUIDE TO CLEANER WATER Information compliments of: WaterWorks! WaterWorks! Center for Environmental.
PESTICIDE and HERBICIDE PRACTICES  Limit soil erosion by planting vegetation on bare areas and using mulch or matting for landscaped areas. CONCLUSION.
Grazing Distribution. What is Grazing Distribution? o Pattern created by livestock grazing an area of rangeland or pasture o animals tend to graze in.
The Nature Of Soil Ms. Scerra
Lignite Mining and Reclamation Process Joe Friedlander The Coteau Properties Co.
Final Reclamation Part 5 U.S. Department of the Interior Bureau of Land Management May 2006.
What Makes a Roadway Safe? ISLAND COUNTY PUBLIC WORKS DEPARTMENT Press key to advance this display.
Humans Impacts on Land Objective 2.07
Vegetation Establishment. Exposed soil occurs on all construction sites.
Rock Coring Obtain undisturbed samples of solid, fractured, or weathered rock formations.
Choice of Color Part 4 U.S. Department of the Interior Bureau of Land Management May 2006.
Conserving Land and Soil What you need to know. Land is a natural resource.  A natural resource is anything that occurs naturally in the environment.
Leave No Trace Travel and Camp on Durable Surfaces Troop 175 Foster City CA.
Master Development Plans (MDPs) Oil and Gas Projects.
U. S. Department of the Interior Bureau of Land Management Division of Fluid Minerals, 1.
Production Operations U.S. Department of the Interior Bureau of Land Management November 2006.
Grade 8 Chapter 12-1 Conserving Land and Soil. Objectives Describe how people use land Discuss the kinds of problems that occur when soil is not properly.
Low Flow Analysis & Water Use Plan Science & Community Environmental Knowledge Fund Forum June 10, 2004 Barry Ortman Diversified Technical Services Dawson.
Table Mountain Wind Proposal Jean Field Office. Project Information Proponent: Table Mountain Wind Co., LLC Project Specifics: ROW grant to use BLM administered.
Earth’s Surface: Chapter 4 Section 3 Human Activities Affect Soil
Definition: Soil and water conservation engineering is the application of engineering principles to the solution of soil and water management problems.
EVALUATION TOPIC Coal Exploration Sites – Offsite Impacts and Reclamation Success.
E4014 Construction Surveying Pavement Setout. Road Construction Consists of a number of sequential steps –clearing –earthworks –drainage works –pavement.
Proper Site Selection Part 2 U.S. Department of the Interior Bureau of Land Management May 2006.
DEPARTMENT OF REGIONAL DEVELOPMENT, PRIMARY INDUSTRY, FISHERIES AND RESOURCES Mining Management Act Security
Best Management Practice Information Sheets Updated: August 30, 2004 Contact: U.S. Department of the Interior Bureau.
River and Canal Maintenance Activities Allowed Under RIDEM Wetlands and Water Quality Regulations Russ Chateauneuf Chief Groundwater & Wetlands Protection.
Maximizing Impact / Minimizing Impact: Balancing Human and Environmental Concerns through Site Access Design Lee-Anne Milburn Department of Landscape Architecture.
Chapter 37 Pipeline Construction. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Explain the.
1 Best Management Practices Planning, Leasing, Permitting Jamie Connell BLM Northwest Colorado District Manager District Manager.
Low Impact Development (LID)
Chapter 16 Site Preparation. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Identify tasks required.
MNM Fatal Falling/Sliding Material Falling/Sliding Material February 28, 2014 (New York) February 28, 2014 (New York) Sand & Gravel Mine Sand &
Soil Conservation. How do we use the land to change the land? Mining – rocks and minerals are removed from the ground for profit by one of two methods:
Earth Day Award Nomination by Utah School and Institutional Trust Lands Administration and the Division of Wildlife Resources.
UNIT 13 – Monitoring & Compliance Monitoring and Compliance UNIT 13.
UNIT 13 – Monitoring & Compliance Monitoring and Compliance UNIT 13.
BOARD OF OIL, GAS, AND MINING DEPARTMENT OF NATURAL RESOURCES STATE OF UTAH BEFORE THE BOARD: RECLAMATION OF SURFACE DISTURBANCE DIVERSIFIED STONE PRODUCTS.
Introduction Part 1 U.S. Department of the Interior Bureau of Land Management May 2006.
TRENCHING & EXCAVATION
1 Common Issues on Site Re-certification Training For Level IA Fundamentals Certified Personnel Issued May 2009.
Kitsap County Department of Public Works CRAB – November 04, 2015 Bioretention Stormwater BMP Benson Burleson Design Engineer
ODOT Programmatic ESA Consultation on the Federal-Aid Highway Program (FAHP) User’s Guide Training, June-July 2013 Clearing and Site Preparation and Site.
U.S. Department of the Interior Bureau of Land Management Wildlife Management Updated: April 2009.
Introduction to BMPs U.S. Department of the Interior Bureau of Land Management May 2006.
Lesson Understanding Soil Drainage Systems. Interest Approach Ask students the question, “What determines how fast water will flow through a funnel?”
SGCHS AG Dept. Natural Resource Management Mr. Hochreiter
16.3. Bellringer The Environmental Impacts of Mining Because of the potential environmental impact of mining on a large scale, mining is one of the most.
Conceptual Approaches for Short- and Long- Term Erosion and Sediment Control Big River State Park At Big River State Park, DPR and the State of California.
Soil Erosion. Objective 1: Explain soil erosion.  What is soil erosion?  I. Soil erosion is the process by which soil is moved.  As soil is eroded,
Ground Control. Working Place Exams (a) – competent person examine each work place at least once per shift for conditions that adversely affect.
WHAT DO ALL THESE PLACES
Grazing Distribution.
Roots and Planting Trees
WHAT DO ALL THESE PLACES
Vehicle & Equipment Maintenance/Cleaning
Presentation transcript:

Reduce Unnecessary Disturbance Part 3 U.S. Department of the Interior Bureau of Land Management November 2006

VRM BMP Principles The VRM system provides us with many basic principles and techniques to help reduce contrast. As they relate to Fluid Minerals and similar development, the 4 most critical are: 1.Proper Site Selection (Part 2) 2.Reduce Unnecessary Disturbance (This Slideshow) 3.Choice of Color (Part 4) 4.Final Reclamation (Part 5)

REDUCE UNNECESSARY DISTURBANCE The second step to minimizing visual contrast is through the reduction of soil and vegetative disturbance. Questions to Ask: Is each road and each well location necessary? Do we need a large well pad and road or can our needs be met with a smaller pad and road? Can we place the road and pad in a location, such as a flat area, that minimizes surface disturbance? Can we reclaim all areas that are not needed for future operations?

Avoid locating roads and pipelines on steep slopes Follow the contours of the land to reduce earthwork/disturbance. The visual scar created by this cut for an irrigation canal is visible for great distances. An example of bad “line.” Straight lines contrast with the many “lines” and contours found in the natural landscape. In this case, the linear road is highly visible because of the large cuts and fills which result from constructing a road on a steep, exposed slope.

Similarly, Avoid Locating Well Pads on Steep Slopes Well pads on steep slopes can create large cut and fill slopes which are more expensive to reclaim and are highly visible from long distances. If you must locate on a steep slope, avoid the sidecast of materials. If this well location could be moved to flatter ground, it would result in less cut, fill, and surface disturbance. Large well locations constructed on steep slopes are difficult to reclaim and can be highly visible.

Avoid Locating Well Pads On or Adjacent to Steep Slopes Moving this well farther back from the edge of the hill would have eliminated the excessive fill material placed over the steep side-slope. Long, side-cast fill slopes like this are nearly impossible to reclaim and will be permanently visible against the natural landscape.

Construct the Minimum Road Necessary Consider using two-track roads for: Exploration wells that could become dry holes or production wells with very low vehicle use during production. The BLM 9113 Roads Manual states – “Bureau roads must be designed to an appropriate standard no higher than necessary to accommodate their intended functions…” This two-track road follows the natural contour of the land and leads to a drilling operation conducted during the dry season. If the well is productive, the road could be upgraded, if necessary, for the anticipated traffic and use.

Interim Reclamation Short-term reclamation that occurs as the well is beginning initial production of oil and/or gas. Includes partially reshaping and revegetating roads, and well pads to reduce the amount of bare ground created during construction and drilling activity. Once the road cross-section is constructed, revegetate all disturbed areas to reduce the visual size of the road. Initiate “interim reclamation” of roads immediately after construction by returning topsoil to cuts, fills, and borrow ditches and reseeding. Revegetated borrow ditches have the additional benefits of being more stable from erosion, providing more forage and habitat, and reducing maintenance costs.  Borrow Ditches 

Respread Topsoil On All Road Cut and Fill Slopes and Revegetate to Ensure Slope Stability, Erosion Control, Restoration of Forage & Habitat, Maintenance of Visual Resources, and Topsoil Viability. Interim Reclamation of Roads

Share Rights-of-Way To minimize surface disturbance, roads and utilities should share common rights-of-way. Also, consider burying power lines in areas that are visually sensitive. Utilities and flowlines are buried within this two ‑ track road to a coalbed natural gas well. Note the lack of vehicle traffic due to the use of offsite production facilities and remote well monitoring via telemetry.

Bury Flowlines & Pipelines To reduce visual contrast in visually sensitive areas, flowlines and pipelines should be buried, preferably in or adjacent to the roadway, particularly if the lines are long-term. These surface pipelines and flowlines contrast with the landscape and create an “industrial” appearance.

Burying Lines & Utilities Plowing and pulling pipes and lines into the ground in certain soil types will disturb much less ground and vegetation than excavating and trenching. Plow mark  Standard Method

Housekeeping Keep a clean well location. The purpose of a well location is to produce energy resources, not store unused equipment and materials that may or may not be needed in the future. Poor housekeeping is unnecessary and creates a poor image of the program. Geothermal Well Location, ownership unknown.

Consider moving the well location to a better site When possible, choose a flat area hidden from view of key observation points. This very large, well location was moved to the only area flat and large enough to accommodate its size. This allowed the operator to minimize cuts and fills and avoid construction in the viewshed.

Minimize Topsoil Removal In flat areas, consider brush-beating, mowing the well location, and/or parking on the grass for drilling and production operations. Only excavate topsoil and subsoil where it is absolutely necessary, such as for the reserve and mud pits or for leveling the drill rig. The well pad was mowed prior to drilling this well. Only the ground over the reserve pit was stripped of topsoil. Crushed vegetation will begin recovery next spring. Pit Area Well 

Reduce the Pad Size Work with the operator to reduce the pad size to the minimum that is needed, without compromising safety. This operator constructed a small well pad in order to minimize loss of important sage-grouse habitat and reduce reclamation costs.

Emerging Practices Under Study To Reduce Reclamation Costs & Speed Visual Recovery Mats Removed – Wet Site 1Year Ago / This Year Mats Removed – Dry Site With Mat / No Mat Recovery Rates Use of Oak Mats for Pads and Roads

Centralize Tank Batteries Out of Sight Tank batteries are typically the largest production facility structures. Centralize tank batteries for several wells in a place that is less visible from key observation points. Centralized tank batteries located away from producing wells allow the operator to perform full interim reclamation of producing well locations and to construct lower standard roads to individual wells.

Low Structures Low-Profile Tanks in a low area, (not on the ridgeline)   Submersible Pump Low profile structures are less visible than higher profile structures.

Ultra-Low Structures Steel lid keeps out animals, people, and vehicles.  View beneath the lid. In some cases, the solution may be to bury the well head.  Well If combined with proper painting and interim reclamation, this operating well could be nearly invisible from a distance.

Co-locate Wells Where practical, co-locate wells to reduce road, pad, and utility surface disturbance. The 6 wells located on this pad result in 5 fewer well pads, access roads, and utility corridors.  6 Wells

Interim Reclamation of Well Locations Minimize the disturbed area of producing well locations through interim reclamation. Interim reclamation is critical to reducing the visual impact of well production, which can run from several to many years. Note how this well location blends with the surrounding topography, vegetation, and open areas in the landscape by repeating the “form” and “line” of the landscape and surrounding vegetation.  Wellhead

Interim Reclamation Interim reclamation that is done well will greatly reduce visual contrast. Paradigm shift: It is OK to drive, park, and set up a workover rig on restored vegetation. Just fix it up when you leave. Note how the entire well location is revegetated, right up to the well box.  Well box

Plan for Interim Reclamation Place production facilities on the well location correctly so that you allow the maximum room for recontouring of the well location. Production facilities should typically be placed near the center of the well location. Because these production facilities were placed against the highwall, not the center of the pad, the pad could not be adequately recontoured (reshaped) to blend with the surrounding landscape.

Steps to Interim Reclamation 1.Leave enough flat area to enable setting up the workover rig. 2.Where possible, recontour everything else to the original, natural contour. 3.Respread stockpiled topsoil so that vegetation extends up to, or within 10 to 15 feet of the production facilities. Respreading and seeding topsoil allows it to maintain its long-term viability for future use. The rapid reapplication of topsoil that has only been stored only a short period of time, encourages the re-establishment of native plants from viable seed in the soil. 4.Gravel a drive-around or load-out area, only if necessary. Consider seeding the drive-around and access spur road.

Encourage the Re-establishment of Native Vegetation Proper interim reclamation can lead to the re-establishment of local, native vegetation resulting in the “restoration” of the landscape to nearly its original character. This photo shows an oil field, water injection well with the well location nearly fully “restored” to a native vegetative community.  Injection Well Box Area of the Former Well Pad

Barren Areas = Mud + Weeds + Maintenance $ + Lost Forage + Visual Contrast Leaving large, barren well locations during the life of the well will increase visual contrast and other impacts including soil and forage loss, noxious weeds, and maintenance costs. Topsoil that is stockpiled will also lose much of its viability over time. This barren well location could have been reclaimed right up to the pumping unit, making the location very difficult to see in the landscape.

BOTTOM LINE To minimize adverse visual impacts, work with affected parties to ensure unnecessary disturbance will be reduced prior to the submission and approval of the permit application. This can create a win-win-win situation for the operator, the public, and the BLM. If we did a good job of Interim Reclamation, then the task of Final Reclamation and associated costs will be greatly reduced. Continue on with VRM Part 4 Great interim reclamation minimizes visual contrast. Over time, sagebrush will return to the site.