Benjamin C. Whitehead, PE Benjamin J. Klayman, PhD, PE Case Study: Commissioning New Rapid Sand Filters at Donald K. Shine Water Treatment Plant.

Slides:



Advertisements
Similar presentations
Arsenic/Iron Co-Precipitation and High Rate Filtration in the City of Portage Christopher Barnes, P.E., City of Portage Kendra Gwin, P.E., City of Portage.
Advertisements

Australian water filter.
North Texas Municipal Water District Water Treatment Process.
Drinking Water Simulator for Proactive Operation and Training
Welcome to American #2 Wastewater Treatment Plant.
Co-Matrix™ Filters for Electrolyte Filtration SpinTek Filtration, Inc. Delkor South America Ltd.
Aquascan. Aquascan - Introduction Aquascan is an online instrument capable of simultaneous multi-parameter measurement for a full range of water quality.
Deep Bed Denitrification Performance
American Water Raw Water Quality Not Textbook? Just Pilot! Iron Removal with High pH Raw Water March 27, 2008 Sandy Kutzing, P.E., CDM Eric Hahn, P.E.,
Filtration by Douglas Rittmann, Ph.D., P.E.
Reducing THM via Aeration: A Case Study November 21, 2013 by Gary Williams, P.E. Jones & Henry Engineers Southeast AWWA District Meeting 1.
Introduction to the Mini-Pilot Treatment System CEEN 572 Environmental Engineering Pilot Plant Laboratory.
CE 370 Filtration.
Phosphorus Removal at Sand Creek Water Reuse Facility by Duane “Bear” Steib and Kathy Bill/City of Aurora Steve Polson/CH2M HILL by Duane “Bear” Steib.
Innovative Tools for Energy Savings T. Allbaugh, P.E., S. J. Kang, Ph.D., P.E., K. Williams, P.E., W. Kramer, P.E., G. Jones, P.E., K. P. Olmstead, Ph.D.,
Drinking Water Filter Backwashing Backwashing – reversing and increasing the water flow to flush particles out of the filter media. Backwashing is vital.
Brushy Creek Municipal Utility District Water Facility Project Status Update Presented at April 9, 2009 Board Meeting Joseph Jenkins, P.E., CH2M HILL.
Surface Water Treatment Plant
Flow Equalization Tanks Presented by Keith Surface.
South Fork WT Plant Tour 5/1/2007 South Fork WT Plant Tour 5/1/2007.
Filter Loading and Backwash Rates Well Yields and Chlorine Dosage in Waterworks Operation Math for Water Technology MTH 082 Lecture Chapter 4 & 8- Applied.
Water Treatment for NYC Croton Schematic. NYC Filtration Plant for Delaware and Catskill Systems  Filtration avoidance criteria  Alternatives to Filtration.
Water Treatment for NYC Croton Schematic. NYC Filtration Plant for Delaware and Catskill Systems ä Filtration avoidance criteria ä Alternatives to Filtration.
Willamette Water Treatment Plant
NYC Filtration Plant for Delaware and Catskill Systems ä Filtration avoidance criteria ä Alternatives to Filtration? ä Where should the plant(s) be located?
Molalla Water Treatment Plant Field Trip 4/24/07 Molalla Water Treatment Plant Field Trip 4/24/07.
I-70 Greenfield Rest Area Constructed Wetland Wastewater Treatment System Research Project (SPR-2455, SPR-2456, SPR-2487) R. S. Govindaraju, J. E. Alleman,
Surface Water Treatment Plant. Fig 4-8: Flow Diagram of conventional surface water treatment plant (“filtration plant”)
FILTER-AG PLUS ® Automatic backwashing unit to dramatically reduce sediment and colour in rural surface water.
Water Treatment Stations Tue. (am) Tue. (pm) Wed. (am) Wed. (pm) Thur. (am) Thur. (pm) Station 1Mini-pilot (CO 166 Greenhouse - Liz) Station 2NF.
1 III. Water Treatment Technologies Topic. III. 5. Micro-mesh Screens. Filters: Kinds, Constructions and Operation Micro-mesh Screens I. Purpose §For plankton.
Water Treatment CE 326 Principles of Environmental Engineering Department of Civil, Construction and Environmental Engineering Iowa State University March.
Increasing Energy Efficiency at the Allegan WWTP MWEA/AWWA Joint Annual Conference August 19, 2010.
Retro-Fit Denitrification for Small Wastewater Treatment Facilities
Filtration at the Bloomington, IL Water Treatment Plant.
Future Water Supply - for the Ashley Valley D. Gerard Yates Central Utah Water Conservancy District.
1 Full-Scale Testing of Innovative High Rate Filter Media for Plant Expansion Bob Raczko, P.E. United Water.
Filtration. Filtration Single Media Rapid Sand Dual Media Rapid Sand.
Wastewater Effluent Reuse – Irrigation Relief in the High Desert City of Albuquerque, NM by James Chavez, PE, City of Albuquerque Bob Paulette, PE, Wilson.
Committed to providing safe, high quality water and related business services earning customer trust and confidence. Louisville Water Company Capital Program.
PERFORMANCE OF A GRANULAR ACTIVATED CARBON BIOFILTER IN LOW STRENGTH WASTEWATER TREATMENT D. S. Chaudhary, H. H. Ngo and S. Vigneswaran Environmental Engineering.
SETA Water treatment plant maintenance
November 17, 2015 NC AWWA-WEA Annual conference
The Los Angeles Aqueduct Filtration Plant An Overview of Facilities and Operations.
Normanton/Karumba WTP Upgrade Matt Fanning Director TBG Pty Ltd.
University of Wyoming Environmental Engineering Senior Design Team Leah Birgen Brent Brouillard.
Engineered systems for wastewater treatment and disposal.
Membrane Bioreactors for Wastewater Treatment.
STORAGE AND MAINTENANCE OF LARGE FARM EQUIPMENT Prepared by : Von G. Peavy South Region Ag Mechanics.
2011 WCW Conference. Fort McMurray James Sacker, Director Environmental Hugh Crawford, Wastewater Supervisor Plant Operations staff Alberta Environment.
 Asia’s largest environment solutions provider, with a strong international presence  Total water & environment management solutions for all sectors.
City of Farmersville Wastewater Project January 26, 2016 Kimley-Horn and Associates, Inc.
Interpreting Filter Profiles
Emanation of Radon from Radium Removal Point of Use Units
Steel Filters.
Normanton/Karumba WTP Upgrade
TMP development without coagulation pre-treatment
Using Safer Treatment chemicals
Pre-Engineered Water Surface Water Treatment Plants
Microfloc Products Adsorption Clarifier/Trident/Tri-Mite
Experience Nordic Water WesTech / General Filter
Lecture # 11 Water treatment:.
Vertical Pressure Filters
Pilot testing services and a case study to reduce organics Devendra Borikar, Laura Zettler, Jeff Avedesian, Lindsay Ariss, Luc Léonard, Denis Dolbec,
Enhancing Rapid Sand Filtration by Backwashing with Alum
FILTRATION III EXAMPLE
Microfloc Products Adsorption Clarifier/Trident/Tri-Mite
Treatment – Sediment Filters
Monitoring Basic Parameters Can Optimize Package Plant Operation
Skid Mounted Water Treatment Plant
Presentation transcript:

Benjamin C. Whitehead, PE Benjamin J. Klayman, PhD, PE Case Study: Commissioning New Rapid Sand Filters at Donald K. Shine Water Treatment Plant

July 2010

Plant Flow Schematic

July 2010 South Treatment Facility – Phase IB Expansion

July 2010 Type of Filtration Six New Conventional Rapid Sand Filters Roberts Leotech Underdrain w/IMS Cap 12-inches Sand 24-inches Anthracite Water and Air Scour Backwash 1360 sq.ft. per Filter 4 gpm / sq.ft.

July 2010 New Filter Installation Filter Underdrain J-Tube Riser Air Scour Manifold

July 2010 New Filter Installation Grout Bed Grout Infill

July 2010 New Filter Installation Completed Underdrain

July 2010 Filter Media Installation

July 2010 Completed Filter Cell

July 2010 Filter Backwash Equipment Backwash Pump  Perless Pump Company  Vertical Turbine Mixed Flow  250 Hp  feet TDH Air Scour Blower  Gardner-Denver  Multi-stage Centrifugal  300 Hp  psig

July 2010 Filter Backwash Backwash Sequence  Drain filter to 6-inches above media  Initiate Air Scour 2 minutes  Add 4 gpm/sq.ft. Low Rate BW (8 MGD) until just below troughs  Stop Air Scour and continue Low Rate water only to top of trough  Initiate 17 gpm/sq.ft. High Rate BW (32 MGD) 4 minutes  Low rate BW (8 MGD) for 1 minute  10 minute settling delay  Open effluent valve 2 minutes after filling starts Backwash is reclaimed / returned to raw water influent of the plant

July 2010 STF Filter

July 2010 SCADA Screen – Filter No. 13 Selection

July 2010 Filter Backwash – Selectable Parameters

July 2010 Backwash with Air Scour

July 2010 Backwash with Air Scour

July 2010 Backwash

July 2010 Backwash

July 2010 MDNRE Requirements Maintain NTU < 0.3 (<0.1 normally) < MGD 2 Consecutive 15 min. NTU > Consecutive NTU > 0.5 first 4 hours 2 Consecutive NTU > 1.0, 3 consecutive months 2 Consecutive NTU > 2.0, 2 consecutive months B&V / City of Wyoming Start-up Goals

July 2010 Commissioning Plan How do we get there? Careful Planning Start Slowly Filter to Rest Monitor/Operate Closely  Flow  Turbidity  Headloss

July 2010 Commissioning Pre-requisites  Media Washing/Screening  VOC testing  Chlorination  Instrumentation / Alarms  Monitoring / Trending  SCADA Control  Backwash Equipment  Backwash Sequence  Transfer Pumping

July 2010 Commissioning Plan Initial Start-up:  Initiate Filter Off-line (Filter-to-Waste) 1 MGD, Filter-to-Waste until < 0.3 NTU  Filter On-line: 1 MGD > 0.3 NTU, Initiate Settling-delay: 4 hours Re-test: <0.1 NTU up to 3 MGD Seasoning:  2 weeks up to 3 MGD  1 week off-line

July 2010 Commissioning Plan Performance Test: Run Filter Several minutes Backwash Place On-line, 1 to 3 MGD Ramp min intervals  > 0.2 NTU Initiates Continuous Monitoring  > 0.3 NTU Initiates Filter-to-Waste Ramp to 7 MGD for 1 hour < 0.1NTU

July 2010 SCADA Screen – STF Filter Overview

July 2010 Filter No. 13 Start-up

July 2010 Filter Performance (Results) Filter Influent Turbidity: +/- 0.3 NTU Filter Effluent Turbidity: < MGD Filter Effluent Turbidity: after Initial Commissioning & Current Conditions Filter Headloss: 1 to 7.5-feet Run Time: 200 hours - New and Existing Filters  4X longer after expansion  Previously hours

July 2010 Filter Performance Meurer Research Inc. Plate Settling Equipment

July 2010 Field Engineering Improvements Reduced Washwater Quantity  Reduced High Rate Wash: 10 minutes to 4 minutes  Total Wash Volume = 75 gal / sq.ft. (100,000 gal)  Industry Standard = gal / sq.ft. (250,000 gal)  Allows for 5 Consecutive Backwashes to Reclaim Operator Adjustable Settling Delay Washwater Launder Stabilization Headloss Instrumentation Calibration Air Distribution Optimization

July Questions?