Special Report NuMI Target Updates Special Report NuMI Target Updates Ongoing Work - Four Parallel Activities, Now Three I.Target Hall NT-05 has been secured.

Slides:



Advertisements
Similar presentations
Superior Turbine Solutions, Inc. Steam Path Capabilities Rotor Repair
Advertisements

Antiproton Lens Replacement Keith Gollwitzer Antiproton Source Department for the Experts and Mechanical Support Department Target Station Group.
Seog Oh/ Duke University/June, 2003 TRT/ ATLAS week at CERN Duke Production Status.
ILCTA-MDB RF Power Status 9/21/06 Reid 1 ILCTA-MDB Status 1.3 GHz RF Power Meson Detector Building 3.9 GHz RF Power A0 Building September 21, 2006 [John.
MICE RF and Coupling Coil Module Outstanding Issues Steve Virostek Lawrence Berkeley National Laboratory MICE Collaboration Meeting October 26, 2004.
 NT-01: Developed internal water leak after a few weeks of operation (may have been related to a beam incident). Managed internal water leak using helium.
Neutrinos from Stored Muons STORM Target Station Conceptual Design 15-April-2013 Kris Anderson Fermilab/Accelerator Division/Mechanical Support Department.
NuMI Target Pile Fan Repair Michael Andrews 3/15/10.
M. Jimenez AT/VAC Room Temperature (LSS) Vacuum Systems M. Jimenez.
Collaboration meeting, RAL, 4 th – 7th November 2009 Andrew Moss ASTeC Collaboration meeting, RAL, 10 th – 13 th november 2009 MICE RF Amplifier Status.
Special Report NuMI Target Updates Special Report NuMI Target Updates Ongoing Work - Four Parallel Activities I.Target Hall We expect to move NT-05 to.
Special Report NuMI Target Updates Special Report NuMI Target Updates Status Update I.Target Hall Target module ready to accept new target General target.
NUMI NuMI Hot Handling Jim Hylen (FNAL) NBI02 March 13, 2002 Page 1 NuMI Target Hall Radioactive Component Handling NuMI Target Hall Utilizes Three Basic.
Cryo Capture Cavity II Progress Mike McGee April 6, 2005.
Update Hardware for conductive cooling of the quench resistors has been fabricated at LBNL. Preparation for installation to start this week. Installation.
LINACs Michael Bevins May 17, GeV Upgrade - Beam Transport Injection, Linac, Extraction, & Correctors Preliminary Design and Safety Review.
1 Hall A Update Thia Keppel APEX Collaboration Meeting April 2015.
NBI March 2002 The MiniBooNE Horn Ioanis Kourbanis For The MiniBooNE Collaboration.
LARP Rotatable Collimator Prototype Assembly completed and all mechanical tests successful: Cooling tubes twist, under vacuum, as jaws turn, with R~1 m.
Antiproton Lens Replacement (Unfortunately Part 2) Keith Gollwitzer Antiproton Source Department for the Experts and Mechanical Support Department Target.
PIP Update June 25 th Agenda Summary Update – Current Activities/Updates – Ryan Crawford: Anode Supply Update – Peter Prieto: BPM Update – CY Tan:
ANU Shutdown Status AEM meeting Cons Gattuso 6/3/2012.
MICE: overview K. Long, 18 March, Contents ► Introduction ► Beam line ► Infrastructure ► MICE steps ► Phase II (comment) ► Conclusions.
NUMI NuMI Review of the Infrastructure – W, G & V 20 July 2001 WBS Page 1 1 Infrastructure Review - W.B.S Water Systems Water Systems –Upstream.
NuMI NBI2006 September 9, 2006 NuMI Repairs for Hot Components Jim Hylen / FNAL Page 1 NuMI Repairs for Hot Components (1 sievert = 100 rem) Problem On.
ANU Shutdown Status AEM meeting Cons Gattuso 7 May 2012.
Evaporative Heater Design, qualification and planning M.Olcese PRR SCT off-detector cooling PRR SCT off-detector cooling March March 2005.
All Experimenters’ Meeting February 09, Accelerator Operation Summary Calendar Week # 06 NuMI Weekly Integrated Intensity 6.69 E18 protons Beam.
Status Update of Ongoing Efforts for NuMI Horn 1 Stripline Redesign and Horn Change Out Kris E. Anderson All Experimenter’s Meeting 06-Jul-2015.
NML High Energy Beam Absorbers and Dump 29-August-2011 Beams-doc-3928.
General RP guidelines for CENF CENF secondary beam study group H. Vincke07/05/
NuMI NuMI Target Hall Air System Review Introduction July 30, 2003 Jim Hylen / FNAL Page 1 NuMI Target Hall Air System Review Introduction Air system for.
Accelerator and NuMI Upgrades Shutdown Update Cons Gattuso July 02, 2012 July 2, 2012 Cons Gattuso1.
Ronald Lipton PMG June Layer 0 Status 48 modules, 96 SVX4 readout chips 6-fold symmetry 8 module types different in sensor and analog cable length.
ATLAS Pixel Detector February 2002 Cooling Services Connections N. Hartman LBNL Cooling Connections Status Report: LBNL Effort February, 2002 N. Hartman,
NuMI/MINOS Status All Exp. Mtg. June 2, 2008 Jim Hylen/FNAL Page 1 FAR DETECTOR: 98.0% live time (wall clock) There was a power outage on the morning of.
John Coughlan Tracker Week October FED Status Production Status Acceptance Testing.
Chiho Wang Duke University 1 TRT Barrel integration Status / Schedule Chiho Wang.
All Exp Mtg July 7, 2008 NuMI-MINOS Status Report – Laura Loiacono FAR DETECTOR: FD live time was 95.7% for cosmics last week (ROP7 problems reported at.
Workshop Chamonix XV27-January-2006 DivonneMassimiliano Ferro-Luzzi 1 State of LHCb for the Sector Test  Overview  Agreement  Status of –VELO –exit.
All Experimenters’ Meeting January 26, Accelerator Operation Summary Calendar Week # 03 NuMI Weekly Integrated Intensity 2.74 E18 protons Beam.
Risk Analysis P. Cennini AB-ATB on behalf of the n_TOF Team  Procedure  Documents in preparation  Conclusions Second n_TOF External Panel Review, CERN,
Proton Plan PMG 2/23/06 E Prebys 1 Proton Plan Status January Report Eric Prebys.
NuMI NBI2003 November 7-11, 2003 NuMI Target Jim Hylen / FNAL Page 1 NuMI Target Status, Testing, Support Module At NBI’02: Beam test results of Medium.
PIP Update April 10 th Agenda Summary Update – Current Activities/Updates – Startup Plans – Upcoming Talks, Reports, Meetings Updates/Talks: Eliana.
2/17/2016 Recycler -Gattuso Recycler Shut Down Status  Flying Wire Status  Wire Vacuum Certified  Tunnel Bake Prep status Disconnection of BPM, Correctors,
PIP Update April 3 rd Agenda Summary Update – Current Activities/Updates – Startup Plans – Upcoming Talks, Reports, Meetings Updates/Talks: Trevor.
Proton Plan PMG 10/13/05 E Prebys 1 Proton Plan Status September Report Eric Prebys.
TIDVG2014 PRODUCTION AND INSTALLATION STATUS 23/07/2014 – “TIDVG Follow-up Meeting” Ivo Leitão.
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Laboratory Oxford, UK July 7, 2011 July 7, 2011.
NML/RFCA002 Status ILC Cryomodule meeting 3 July 2012 E. Harms.
Mike Andrews May 10, Week 54 NuMI Activities Initial test controls on the MI65 RAW exchange skid Complete hydrostatic test of the MI65 exchange.
Tracker cooling status General status Production: Manifolds, Distribution lines Work at P5 Plan Conclusions 19/05/091E. Focardi.
CM2 Helium Circuit Vacuum Leak & Repair Tug Arkan, 6/18/
RF Module Update MICE Collaboration Meeting 44 Andrew Lambert Lawrence Berkeley National Laboratory March 30 th, 2016.
Mike Andrews August 30, Weeks 1-5 Activities Rad survey open to supervised access & re-core Install crane electronics & remove shield wall Retrieve.
2/20/ PHENIX WEEKLY PLANNING Feb. 20, 2014 Don Lynch.
Proton PMG September 3 rd 2015 Cons Gattuso AD Shutdown Manager.
Cryomodule Interconnect Installation Issues A Comparison of XFEL to LCLSII Karen Fant 7/29/2015.
Mike Andrews August 17, Week 16 NuMI Activities Leak testing of DI bottles & Casks Complete all bottles & casks RAW Impulse line upgrade Finished.
Mike Andrews January 31, Weeks Activities Target Pile Fan Upgrades Install piping for new cooling coil units Install controls for new coil.
Step IV Step IV extended through 2016 QP/QD – in progress at FNAL Target dates SSU ECE for Feb now only 20% probability – no-field Feb Remainder for April/March.
Completion of the MICE-US construction project
Impact of TIDVG problem on LSS5 dump design schedule
Update of cryogenic activities
News and brief overview of Beamline plans for the next few months
Hall A Target Status 9/27/16 Dave Meekins.
Teleconference ACS – FREIA 20th February 2018
DESIGN STATUS PREX II Alan Gavalya 15DEC14.
Cryomodule Assembly Plan
Presentation transcript:

Special Report NuMI Target Updates Special Report NuMI Target Updates Ongoing Work - Four Parallel Activities, Now Three I.Target Hall NT-05 has been secured in NuMI Target Hall Morgue Target module ready to accept new target II.Autopsy of NT-05 in Target Hall Workcell Done- All work on this task complete III.Reclaim NT-02 as a contingency spare Good News: Pressure test results indicate NT-02 is still leak tight on the water and canister He volume circuit Bad News: Z-drive motion is likely compromised in perhaps a couple of locations ALARA plan in process to address slipping couplers and new bearings blocks May require ~2 weeks of effort to reclaim z-drive motion (if possible) IV.NT-06 Retrofit (Activities currently on the critical path) Target core successfully extracted from support casing Old DS water turnaround successfully removed using wire EDM in WHMS New water turnaround design successfully fabricated, welded, X-ray inspected, and pressure tested to 2400 psig Turnaround will be welded to NT-06 core and X-ray inspected Tuesday 3/22 All other target canister final assembly, survey, and QA expected to be complete by Saturday 3/26 Kris Anderson 21-Mar-2011 Kris Anderson 21-Mar-2011

Special Report NuMI Target Updates Special Report NuMI Target Updates NuMI Low Energy Target General Assembly Layout Downstream Water Turnaround Weldments Previously Identified Potential Failure Location Previously Identified Potential Failure Location

NT-06 Target Core in Processing Fixture Special Report NuMI Target Updates Special Report NuMI Target Updates NT-06 Retrofit

Original NT- 06 Downstream Water Circuit Welds patched with solder Special Report NuMI Target Updates Special Report NuMI Target Updates NT-06 Retrofit

Original NT- 06 Downstream Water Circuit Turnaround end not welded perpendicular to core centerline Special Report NuMI Target Updates Special Report NuMI Target Updates NT-06 Retrofit

Surgery Time Wire EDM operation to remove original water turnaround Successful cut Special Report NuMI Target Updates Special Report NuMI Target Updates NT-06 Retrofit

New Style Water Turnaround Successful X- ray inspection Successful pressure test to 1500 psig Special Report NuMI Target Updates Special Report NuMI Target Updates NT-06 Retrofit

NT-06 Cooling tube transition sleeves cleaned and ready for retrofit Special Report NuMI Target Updates Special Report NuMI Target Updates NT-06 Retrofit

NT-06 Retrofit ready for welding and X-ray inspection Tuesday 3/22 Special Report NuMI Target Updates Special Report NuMI Target Updates NT-06 Retrofit

Special Report NuMI Target Updates Special Report NuMI Target Updates Estimated Key Dates-Nominal Scenario I. NT-06 Path NT-06 retrofit should be completion 3/26 Efforts for NT-06 Target/Baffle Carrier final outfitting at MI-8, survey, and Q/A expected to occur 3/28 – 4/2 Installation of NT-06 into target chase during 4/4 – 4/9 Estimate for beam ~12:00 on Sunday 4/10 II. NT-02 Path (Contingency Target) NT-02 is leak tight but status of z-drive reclamation is still TBD Likely to take about weeks of effort to define and implement procedure to assess and return z-drive mechanism to operational status; Estimate z-drive recovery end of March if repairable Key Dates