Milestone329 April, 2005 PT 103232. Milestone329 April, 2005 Cinema Statistics (Social & Economic Problems) Very Bad (1); Bad (2); Sufficient (3) Good.

Slides:



Advertisements
Similar presentations
BUILDING AIR CONDITIONING
Advertisements

Matt Warner Future Facilities Proactive Airflow Management in Data Centre Operation - using CFD simulation to improve resilience, energy efficiency and.
eQuest Quick Energy Simulation Tool
Industrial Ecology and Environmental Policy11 February, 2005.
17 December, 2004ACADS Milestone December, 2004ACADS Milestone 1 Presentation Summary.
Environmental Controls I/IG Lecture 14 Mechanical System Space Requirements Mechanical System Exchange Loops HVAC Systems Lecture 14 Mechanical System.
100% Outside Air and Dehumidification Management
Heating Systems Forced Air Systems.
Make the most of your energy Head Office – Case Study.
Coupling a Network HVAC Model to a Computational Fluid Dynamics Model Using Large Eddy Simulation Jason Floyd Hughes Associates, Inc Fire + Evacuation.
BASICS OF HVAC Ivy Tech Community College. Definitions – Page 862 HVAC systems are made up of the mechanical equipment such as the furnace, air conditioner,
HVAC Equipment Supplement. AIR-HANDLING UNIT (AHU) AHU DAMPERS COORDINATED FOR AIR- SIDE ECONOMIZER OPERATION.
DATA ONE, EUROPEAN OPERATIONS CENTRE, ST. PETERSBURG, RUSSIA Presentation of Design Proposal.
BRE Energy Efficient Office of the Future
Milestone218 March, 2005 PT Milestone218 March, 2005 Product Development Process.
Heating energy calculation methods Anti Hamburg Lecture TTK-UAS.
Energy in Focus Energy Savings with Water Based Systems By Maija Virta Specialist of Indoor Environment Technology.
Lindab Pascal - Simplified VAV solution with full potential...
ARCH-4372/6372 HVAC Distribution & Sizing HVAC Distribution Systems
HVAC Systems Overview HVAC Overview - # 1 Tom Lawrence
RETROCOMMISSIONING AIR HANDLING SYSTEMS
Thermal Management Solutions from APW President Systems
Lecture Objectives: Model HVAC Systems –HW3 Asignemnet Learn about eQUEST software –How to conduct parametric analysis of building envelope.
Daikin Visit November 7, 2014.
Lecture Objectives: Model processes in AHU –Use eQUEST predefined models –Use detail modeling Define your topics for your final project.
Towards Net Zero Energy Buildings: Dynamic Simulation of office Building in Three Climate Zones of Europe Nusrat Jung 1,2, Jari Shemeikka 1, Risto Lahdelma.
BEM CLASS 5 Building Thermodynamics – 2 Air-conditioning Load Calculation – latent heat, solar and internal gains.
Passive House Seminar for Professionals from the Building Sector
Important variables Water: Air: Conversion:
Announcements Midterm Project Prepare groups of 3 to 4 students You can submit the list at the end of next class Midterm Exam 03/09/10 - In class Exam:
The European Office Building S.H. Liem, A.H.C. van Paassen M.Verwaal, H.F. Broekhuizen Delft, April 1998 S.H. Liem, A.H.C. van Paassen M.Verwaal, H.F.
CALRES Update Phase 1 Progress Report April 22, 2009 Bruce Wilcox Phil Niles Ken Nittler.
Lecture Objectives: Finish with HVAC Systems Discuss Final Project.
Ductwork Systems and Supply Arch 432. What You Need To Know Become familiar with the materials sizing ductwork Understand sizing units.
Lecture Objectives: Specify Exam Time Finish with HVAC systems –HW3 Introduce Projects 1 & 2 –eQUEST –other options.
Presented By SLAC and Hensel Phelps Welcome SUSB.
The EWZ building Presentation of the building Presentation of the building The design issue The design issue The building concept The building concept.
1 ISAT Module III: Building Energy Efficiency Topic 7: Transient Heating and Air Conditioning Loads  Thermal Admittance  Intermittent Heating 
Heat Exchange Ventilation Heat Exchange Ventilation.
0 Load Calculation Manual Output : 1. Screen Outputs (Results, Pareto Chart, Hourly Estimation) 2. Optional Outputs (*CLTD.txt, *TETD.txt) 3.
Lecture Objectives: Finish with example modeling problems –Phase change thermal storage materials –Energy and airflow Interpret energy simulation results.
Energy conservation strategies Buildings energy consumption depends on building envelop, efficiency of HVAC and lighting systems, amount of required fresh.
HEATING AND COOLING SYSTEMS
Lecture Objectives: -Define the midterm project -Lean about eQUEST -Review exam problems.
Ductwork Systems and Supply Arch 432. What You Need To Know Become familiar with the materials sizing ductwork Understand sizing units.
Advanced Energy Engineering Technology Modeling Building Energy Systems Session 9: Modeling heating and cooling systems.
Lecture Objectives: Discuss the exam problems Answer question about HW 3 and Final Project Assignments Building-System-Plant connection –HVAC Systems.
Objectives Talk about the final projects Guest Speaker Discuss HW2 and HW3 problems.
Lecture Objectives: Analyze several modeling problems –Examples from the final project list Economizer Solar collectors Phase change thermal storage materials.
Objectives Propose residential system related final project –Compare VAV systems with DOAS systems.
EXAMINATION 3 REVIEW FORMAT & AREAS COVERED DISTRIBUTION SYSTEMS DELIVERY DEVICES UNITARY SYSTEMS HEAT PUMPS SPACE REQUIREMENTS & DESIGN CONSIDERATIONS.
1 Energy Solutions for Production Supported by: The sole responsibility for the content of this presentation lies with the authors. It does not necessarily.
HVAC Energy Efficiency using Mass Flow and Building Pressurization Jay Richardson Professional Supply, Inc.
HCB 3-Chap 19A: All-Air Systems_Single Zone 1 Chapter 19A: ALL-AIR SYSTEMS: SINGLE ZONE AND SINGLE DUCT Agami Reddy (July 2016) 1)Introduction and common.
HVAC Replacement Case Study
Lecture Objectives: Discuss HW3 parts d) & e) Learn about HVAC systems
WDMA Technical Conference Chicago, IL 28 June 2016
HVAC Basics Arkan Arzesh HVAC – Heating, Ventilation, Air-conditioning.
Lecture Objectives: Answer questions related to HW 4
Lecture Objectives: Discuss HW3 parts d) & e) Learn about HVAC systems
Heat recovery feature Competitive approach
The Benefit of Including Energy Recovery System Analysis
HCB 3-Chap 19A: All-Air Systems_Single Zone
October 31st In class test!
Technician’s Guide and Workbook for Zoning Section 1: Introduction
Follow-ups from Classes 8 and 9
Minimizing Heating & Cooling Costs
Announcements Exam 1 Next Class (Thursday, March 14th):
Objective Revie the Cooling Cycle Learn about air distribution systems
Presentation transcript:

Milestone329 April, 2005 PT

Milestone329 April, 2005 Cinema Statistics (Social & Economic Problems) Very Bad (1); Bad (2); Sufficient (3) Good (4); Very Good (5); Excellent (6) Mean & Standard Deviation LeftCenterRight 1.3 ; ; ; ; ; ; ; ; ; ; ; ; 0.9 Room activity / total rooms ratio in the 4 T/04: 23% for cinema auditorium (medium dimension) 35% for cinema on shopping center (175 per session) 44% for polyvalent room (313 seat per session) Increase on room with minor dimension Mean room dimension: 216 seat Increase on number of screens: + 11% Increase on number of seat: + 8,1% Increase on film sessions: + 19,8% Decrease on number of spectators: - 11,1 % Decrease on ticket revenues: - 8,8% Ticket Mean Price: 4,1 euros INE, 4T/2004 Questionnaire(40 spectators) Public tolerable to spectator: Some public (4.6) Few public (4.4) Room almost empty (3.6; 1,6) A lot of public (3.6; 1) Full Room (2.0) Ticket Reservation Aspects: Room Area (4.2) Specific Localization (4.4) Corridor proximity (2.7) Occupancy (2) Exit proximity (2)

Milestone329 April, 2005 Running costs (Efficiency Problem) Annual Fuel Consumption = (cte * Annual Load) / (cte2 * HCE * UE) [litre/annum] Annual Load = cte3 * (Degree-days) * FBC * FMO * FPO [MWh] Building & system type (Thermal and Response Capacity) Operation over 30 weeks per annum (October – April) for a 5 day week and occupation during 12 hours. Wall isolation considered adiabatic. Inside design temperature: + 20ºC Outside design temperature: -3º C Heavyweight(*), Intermittent & Slow Response System Lightweight(*), Intermittent & Fast Response System Heat conversion efficiency (HCE)0.65 Utilization efficiency (UE)0.93 Factor of building characteristic (FBC) Factor of mode of operation (FMO) Factor of period of occupation (FPO) FBC * FMO * FPO Annual Load Difference between the two structures- 64% (*) Building Standard Weights (or Weight/unit of floor area): 146,5 kg/m 2 (Light); 341,8 kg/m 2 (medium); 634,7 kg/m 2 (Heavy)

Milestone329 April, 2005 ACADS Technical Solutions Large Control Volume High Thermal Capacity High Room Preheat energy ACADS - MultiZone Control: 8 Control Volume – “thermal isles” 8 Low isle thermal capacities 8 Low isle preheat energy Room heated by isles Prior Art - Single Zone Control: 266 m 2 x 634,7 Kg/m 2 > Σ Ai x 634,7 kg/m 2

Milestone329 April, 2005 ACADS Impact on the Room Acclimatization 1. Operate only at total space (occupancy independent) 2. Big reaction time 3. Thermal steady state across time 4. Thermal unnatural and neutral world 5. Low performance and efficiency (part occupancy) 1. Operate on localized spaces (occupancy dependent); 2. Low reaction time; 3. Excellent performance and efficiency (part occupancy); 4. Richer space thermal experience; 5. Symbolic and cultural role; 6. Better sustainability;

Milestone329 April, 2005 Air MultiZone Supply System Air Floor Return Plenum (FRP) Eight Air Supply Plenums (SP) Ceiling Return Plenum (CRP) Connecting Chamber (CC) FRP SP CRP CC Air Handling Units (AHU) Ventilation Network (VN) AHU VN AHU1 – Rear Half Room Fresh Air Supply (FAS) AHU2 – Front Half Room Air Exhaust (AE) AHU1 AHU2 FAS AE Rear MultiZone Air Supply (RS) Front MultiZone Air Supply (FS) Air Seat Diffuser (ASD) Air Supply Plenum (ASP) Air Handling Unit (AHU1) FS RS ASP ASD AHU1 ASD AHU1 ASP Equipment required to test different control alternatives: 8 zones to control, each one with a thermocouple; 8 zones to control, each one with a modulating damper; 2 PLC & instrumentation to control two VAV Air Handling Units; Communication between PLC and the ticket management PC; PLC expandable to experiment more alternatives or concepts during the development phase. Max Airflow: 3960 m 3 /h Insufflation ductwork: Ø560, Ø400, Ø355 mm Suction ductwork: Ø710, Ø560 Exhaust ductwork: Ø710, Ø560 mm AHU2 Ductwork sizing data Max Airflow: 5280 m 3 /h Insufflation ductwork: Ø630, Ø355, Ø280 mm Suction ductwork: Ø710, Ø560, Ø630, Ø560 mm Exhaust ductwork: Ø710, Ø630 mm AHU1 Ductwork sizing data:

Milestone329 April, 2005 RD opened ED closed TE CC Ventilation Reclaim – Winter Operation Air Reclaim Damper (RD) Thermal Energy (TE) Air Exhaust Damper (ED) Connecting Chamber (CC) TE Fresh Air Exhaust Air To the Room From the Room

Milestone329 April, 2005 Vent. Reclaim Plus – Winter Operation Window (W) opened before/after film session: - Natural light; - Artificial light reduction; - A new experience. Heat gained from spectator energy (HGSp) Heat gained from solar energy (HGSol) Heat reclaim from HGSp & HGSol balance HGSpHGSol TE WW Fresh Air Exhaust Air To the Room From the Room Solar Energy

Milestone329 April, 2005 Heat Exhaust/Free Cooling – Summer Op. Fresh Air Exhaust Air To the Room From the Room

Milestone329 April, 2005 System Sizing & Energy Simulations 1.Hourly Analysis Program, version 4.22a, Carrier 2.FlexAir, Carrier 3.…. ACADS ACADS as a “MultiZone system without internal walls“

Milestone329 April, 2005 Collaborative Product Development HVAC Designers & Experts Cinema Owners Sponsors HVAC Control Services

Milestone329 April, 2005