Asset Management ProjectWise Lifecycle Server 1. “Knowledge Is Power” scientia potentia est ~Francis Bacon scientia potentia est ~Francis Bacon 011000110110100101100101011011100111010001.

Slides:



Advertisements
Similar presentations
ThinkEnergyGroup Energy.Personnel.Fast!. Weve engineered a professional approach to energy staffing. ThinkEnergyGroup.
Advertisements

Commissioning Approach Integrated Service Solutions
SEE System Design Product Presentation The Computer-Aided Design Specialist dedicated to Electrical Engineering, Systems and Industrial Fluids.
PLANT DESIGN (I) Prof. Dr. Hasan farag.
E&CS Overview & Major Construction Update Eddie Clayton.
ENERGY EFFICIENCY FOR END-USERS.  CSU Chancellors office coordinates the efforts to accomplish the goals established by Assembly Bill 32 for green house.
Plant Information Model (PIM) Breakout N1 – (1:00pm – 2:30pm), Monday, June 16, 2014 Russell Adams – EPRI Consultant Laurent Perkins, Bentley Kent Freeland,
Project Phases of an EPIC Contract Pre Project Basic EngDetailed Eng Procurement Long Lead Items MC Prep Installation PC Execute PC and Commissioning Preparation.
Project Management Methodology (PMM)
PROJECT AND STUDY DRAWINGS & DIAGRAMS
MEP201 Mechanical Engineering Drawing 1 st semester S R Kale Lecture Piping Drawings.
Module 6/7: DPR (Detailed Project Report) & EPC (Engineering Procurement Construction)
Objective : To understand the fabrication, design, installation welding, inspection and testing for new construction in oil and gas industry After followed.
© 2007 Bentley Systems, Inc Bentley Confidential ConceptualizeDesign Analyze Construct HandoverOperate & Maintain AutoPLANT PlantSpace AutoPIPE STAAD/RAM.
-P&ID- Piping & Instrument Diagram
SPD Cooling workshop: PLC item details. ups upgrade: 10-12' after trigger 24V - what to do in 10 minutes Present situation: In case of “normal power”
Process Engineer’s Role in Project Management Dr Abdullah Malik.
KAGIRA DRAWING SOLUTION BEST PIPING INSTITUTE IN CHENNAI.
Specifying Pumps. Prepared by Martin Ryan, 2013 Training Series: Using Aspen Technology Economic Evaluation Suite.
Picture 1 model: ICT lifecycle in a company 1. business needs & business strategy 2. ICT strategy - ICT assessment - ICT strategic plan - ICT implementation/tactical.
Lockout Tagout Tryout (LOTO). The purpose of the Lockout Tagout Program is to protect you. Rain for Rent incidents include employees being sprayed with.
Given a P&ID, the learner will be able to identify the purpose of that P&ID according to their student guide. – Given a P&ID, locate the title block and.
© 2010 Chevron A Day in the Life of a Project Manager Presented by Nancy Grossman, Project Manager Presented to Chabot College Engineering Class September.
Asset Record Does Not Equal CI: The confusion between Asset and Configuration Management Christine M. Russo Manager, IT Asset Management and Property.
LBT Q Engineering Review DYB. 26-Oct-2007LBT Q Engineering Review Highlights (Q3/2007) Currently in Commissioning Phase Currently in Commissioning.
FLOW-SHEETING What we will cover here? PFD?
Power Plant Construction and QA/QC Section 5.4 – Key Systems and Components Engineering Technology Division.
Reducing Waste and Energy Consumption Neil Evan Peterson Advisor: Paul Pagel.
PIPETECH CONSULTANCY WELCOME TO PIPE TECH CONSULTANCY
© 2007 Bentley Systems, Inc Bentley Confidential ConceptualizeDesign Analyze Construct HandoverOperate & Maintain AutoPLANT PlantSpace AutoPIPE STAAD/RAM.
Are You Ready for an SIS? What to do before starting on your SIS…and after it’s installed March 24, 2009.
Database Administration COMSATS INSTITUTE OF INFORMATION TECHNOLOGY, VEHARI.
Laura J. Weber Solid Waste Project Manager St. Regis Mohawk Tribe ITEP Tribal Transfer Station Course.
Experience of an Indian Refinery
Westinghouse/Southern/SCANA – New Build Configuration Management
© 2015, Fiatech Data as Information Currency Robin Benjamins Bechtel.
The New Zealand Institute for Plant & Food Research Limited Agricultural Production system SIMulator: Combining soil and weather data with management rules.
Presented By: John B. Whitmire Bentley Systems, Inc.
Critical Steps in Process Design
MEP201 Mechanical Engineering Drawing 1 st semester S R Kale Lecture General Arrangement (G.A.) Drawings.
Copyright march, 2007 all rights reserved Victor Dvornikov Concurrent operations over the world Temporary.
Review of the operation scenarios and required manning of the activities P. Schnizer and L. Serio.
© ABB University - 1 Revision C E x t e n d e d A u t o m a t i o n S y s t e m x A Chapter 16 Alarm and Events Course T314.
Construction of a Transfer Station
Core Competencies (Practical Skills to be Assessed) Training Workshops Required (Underpinning Skills & Knowledge) Job Qualifications/Positions Qualified.
CM27 – 8 th July 2010 LH2 System Progress and Future Plans M Hills T Bradshaw M Courthold I Mullacrane P Warburton.
Review of the operation scenarios and required manning of the activities P. Schnizer and L. Serio.
Scrumm meeting. Mechanical Done. Designed the top part Working on encoders Working on documentation What to do? Work on the top part Finish encoders.
© 2007 Bentley Systems, Inc Bentley Confidential ConceptualizeDesign Analyze Construct HandoverOperate & Maintain AutoPLANT PlantSpace AutoPIPE STAAD/RAM.
PIPELINES VIJAY VADER. PROCESS PLANTS  Essentially handling liquid/gases/solids  Need to transport them from one stage to another.  Transportation.
Washington DC 14 December 2009 Standardization Power Christopher Loeser Distribution Statement A: Approved for Public Release.
V Thermo-siphon Workshop Test protocol Jan Godlewski PH/DT-PO On behalf of thermo-siphon working group
Product specification and domain ontologies Optique Big Data Summit III June 2016 Anders Gjerver
LIU Wire Scanner Milestones June 2017
Totem Gas Systems ( T1 , T2 ) S. Haider PH / DT1.
Internship Program Ma’aden Phosphate Company
How SCADA Systems Work?.
MAUVE CO2 cooling review
The Life Cycle of a Project – START to FINISH
Fundamentals of PROCESS PLANT PIPING DESIGN
ChE 473K Plant Design R. Bruce Eldridge.
HMSWeb – Handover Management System
Estimating Capital Costs
ISO Brief Overview 17 September 2008 Magne Valen-Sendstad.
Operator Training Requirements
Piping and Instrumentation for Process Industries
Undulator Cost & Schedule Patric Den Hartog, ANL April 24, 2002
Mechanical Engineering Program Schedule (Week 1-5)
Aziz AMAMOU EACM – 21th May 2019
Presentation transcript:

Asset Management ProjectWise Lifecycle Server 1

“Knowledge Is Power” scientia potentia est ~Francis Bacon scientia potentia est ~Francis Bacon

Management of Documents Documentum Design Construction Operations & Maintenance Cost Estimating Startup & Commissioning ProjectWise Explorer 3

Management of Data CYGNA PDMS AutoPlant 4 Construction Operations & Maintenance Cost Estimating Startup & Commissioning Mechanical Instrumentation & Controls Electrical Design

Data-centric Model CYGNA PDMS AutoPlant 5 Construction Operations & Maintenance Cost Estimating Startup & Commissioning Mechanical Instrumentation & Controls Electrical Data System

Management of Change Flexible Architecture Lifecycle Server Data Quality Manager 6

Reference Data Library Flexible Architecture Process Line Cable Motor

8 Data Quality Manager

Management of Change Conceptual Released for Detail Design Released for Procurement Released for Construction As-BuiltDecommission 9

Southern Company LCS Lifecycle Server 10 CYGNA PDMS AutoPlant Mechanical Instrumentation & Controls Electrical

Document and Asset Associations Documentum 11 Lifecycle Server CYGNA PDMS AutoPlant Mechanical Instrumentation & Controls Electrical

Document and Asset Associations 12 Operation & Maintenance KCI001-HK-MO-6070 Reclaim Sump Pump 1 Motor Make-up Water E1M4242 E1M1001 Documentum

E1E1546 E1E4658 E1M1549 Document and Asset Associations 13 Documentum Operation & Maintenance KCI001-HK-MO-6070 Reclaim Sump Pump 1 Motor Line Cable Pump Lifecycle Server

Data Normalization, Quality and Design Efficiencies 14 Lifecycle Server CYGNA PDMS AutoPlant Mechanical Instrumentation & Controls Electrical Documentum Information

AutoPlant Instrumentation & Controls Information CYGNA PDMS Lifecycle Server Validation and Acceptance Reporting 15 Mechanical Electrical Documentum

AutoPlant Instrumentation & Controls Information CYGNA PDMS Variance Reporting 16 Mechanical Electrical Documentum CHANGE Lifecycle Server

Southern Company LCS Startup & Commissioning 17 Lifecycle Server CYGNA PDMS AutoPlant Mechanical Instrumentation & Controls Electrical Documentum Information Package Builder

The Project - Plant Ratcliffe – Kemper County IGCC 18

34,641 Tagged Items 50,071 Physical Objects (3D) 15,854 Process Lines/Pipe Runs 5,392 Documents Metrics ,958 LCS Objects

Metrics 5,392 Documents 34,641 Tagged Items 50,071 Physical Objects (3D) 15,854 Process Lines/Pipe Runs 20

244 Not Transmitted 2,191 Wiring Diagrams 449 P&IDs 5,392 Documents 205 Transmitted Metrics 21 34,641 Tagged Items

12,422 Valves 830 Pressure Transmitters 220 Motors 34,641 Tagged Items 3,820 Cables 291,995 LF Metrics 22

Metrics 3,820 Cables 291,995 LF 989 Control 48,494 LF 1, V Power 101,468 LF 50,071 Physical Objects (3D) 23

4,698 2” Dia. 547, LF 2,640 3” Dia. 280, LF 1,211 8” Dia. 297, LF 5,959 Flange14,264 Elbow 50,071 Physical Objects (3D) 23,205 Pipe Spools 3,434, LF 4,256 Gasket Metrics 24

Conclusion Create Information Consolidate Data Share Knowledge 25

Bentley Professional Services – Justin Collins and Walter Adolph Account Manager – Randy Conkling Southern Company Management Sponsors – Daryl Hall and Carl Toner Software Applications – Steve Campbell and Daishaun Morgan Support – Kimber Furman, Bob Smith, Randall Henry, Dean Lyon, Katherine Melvin and Thomas Ricketts “Remember upon the conduct of each depends the fate of all.” ~Alexander the Great Acknowledgements 26

QUESTIONS 27