Introducing the ECR Road Map Dr Paul Chapman Cranfield School of Management.

Slides:



Advertisements
Similar presentations
WAREHOUSING MANAGEMENT
Advertisements

WAREHOUSING MANAGEMENT
Bringing the Voice of the Consumer Into Your Supply Chain Jake Barr Director, Consumer Driven Supply Network Global Mfg, Planning & Logistics The Procter.
Copyright © 2007 Logistics Consulting Asia Real Benefits from Pallet Standardization – A Case Study John Talbot – CEO, Logistics Consulting Asia David.
Identifying Key Processes For Successful Temperature Sensitive Shipments Frank Morgiewicz, VP & GM of Logistics Services ArrowStream.
Maura Kinahan, PhD MPSI “Medicines Shortages - Industry Perspective” 2013 INTERNATIONAL SUMMIT ON MEDICINES SHORTAGE Toronto 20 th -21 st June 2013.
Understand Merchandise Planning in Retailing. The Merchandise Plan A budgeting tool that helps retailer or buyer to meet department goals ▫Planned sales.
Where does Failure Mode and Effects Analysis (FMEA) come from?  Developed by the Aerospace industry in the1960s  Spread to the Automotive industry 
1 Copyright © 2011 The Nielsen Company. Confidential and proprietary. 1 1 ECR Iniciative Presidium Nielsen On Shelf Availability Solution (OSA) Prague.
LOSE LESS AND SELL MORE : Using the ECR Europe Approach to Manage Shrinkage Adrian Beck Reader in Criminology University of Leicester, UK.
25 Mar 10 – WDM 204 – Session Two. Cape Area Management Program (CAMP) Sponsored by the Cape & Islands Workforce Investment Board.
MM 2.00 Understand Financial Analysis 2.01 Understand sales activities to show command of their nature and scope.
Six Sigma Quality Engineering
LOG 408: Global Logistics Management Lecture 10: Cases on Supply Chain Operation.
Total Quality Management BUS 3 – 142 Statistics for Variables Week of Mar 14, 2011.
Part II Project Planning © 2012 John Wiley & Sons Inc.
Barry Murash MBBit Nortel 2007
Failure Mode & Effect Analysis (FMEA)
HED 460 Pricing Distribution Costs System Generated Revenue (66%) Other Sources of Revenue (34%)
 A project is “a unique endeavor to produce a set of deliverables within clearly specified time, cost and quality constraints”
Partnering and Collaborative Working An Introduction Dr Neil Jarrett.
KEEPING LABOR AND OVERHEAD COSTS DOWN Controlling Labor and Overhead Costs as a Long Term Strategy.
What are the Benefits? Action AKA TPM, Total Preventative Maintenance Total Productive Maintenance Breakdowns 1 Setup / adjustment 2 Idling / minor stoppages.
Copyright © 2011 The McGraw-Hill Companies, All Rights Reserved GLOBAL SOURCING AND PROCUREMENT Chapter 11.
On Target Group Coaching
TQM TECHNIQUES BENCHMARKING Target key areas for improvement within operations – Increase productivity, competitiveness, and quality – Quality results.
Tackling Shrinkage to Improve Your Bottom Line ECR Europe Annual Congress, Brussels May 2004.
RFID In Retail Neco Can Vice President - Partner ATTEVO Inc.
ASQ Raleigh ASQ Raleigh Section 1113 Six Sigma SIG DMAIC Series.
© The Delos Partnership 2005 Dairygold Workshop Supplier Relationship Management.
QUALITY RISK MANAGEMENT RASHID MAHMOOD MSc. Analytical Chemistry MS in Total Quality Management Senior Manager Quality Assurance Nabiqasim Group of Industries.
Devising A Strategy for Growth Mission, Vision, Values Brian O’Connell
April 19 th, 2004Group B1. April 19 th, 2004Group B1 Distribution: The Secrets of Market Logistics IKEA’s Sustainable Competitive Advantage Section B-
Best Practice Sharing example : ‘Viva Brazil’ On Pack Promotion Execution in Asda (UK) Objective for the Execution of this activity : Deliver ‘Best Ever’
Introduction to Kaizen Introduction Kaizen Facilitation.
Project Storyboard (Page 1 of 2)
ECR Europe – Supply Side agenda Update on preparations for workshop on Shelf Ready Packaging (SRP) Brussels, 21 October 2005.
ESP Specialty Steel Products Virtual Inventory Program.
Project Selection Six Sigma Foundations Continuous Improvement Training Six Sigma Foundations Continuous Improvement Training Six Sigma Simplicity.
Copyright 2013 John Wiley & Sons, Inc. Chapter 3 Monitoring and Controlling the Transformation System.
I2 U Intelligent Supply Chain Management Course Module Twelve: Inventory Deployment.
Lalit Panda, SVP SC and IT, Harman Consumer Group, Inc. ProcureCon July 14 th 2008 KPI Based Supply Chain Management.
Work Plan ECR Europe Shrinkage Team. Where we started …. Zero collaboration around a difficult subject No common definition on scale or impact.
Risk Assessment (Supplemental info./ forms) Improve Kaizen Facilitation.
WAREHOUSE BENCHMARKING Meeting January Seven Steps to Successful Benchmarking Plan 1. Set Benchmarking Priorities 2. Identify the Key Processes.
Failure Modes and Effects Analysis (FMEA)
Effectiveness of risk management process towards error reduction in the laboratory at Sakra World Hospital AUTHORS: Dr. Shabnam Roohi Mr. Deepak Agarkhed.
Copyright 2012 John Wiley & Sons, Inc. Part II Project Planning.
Copyright 2015 John Wiley & Sons, Inc. Project Planning Part II.
Contact us: Call: Mail: Visit:
References: Supply Chain Saves the World. Boston, MA: AMR Research (2006); Designing and Managing the Supply Chain – Concepts, Strategies and Case Studies;
A Quick Review of the Components THE DMAIC CYCLE.
March 16, 2016 CanadianClinicalDiagnostics.com ©Canadian Clinical Diagnostics.
Homework 1- Gateway.
Best Practices Consortium
TM 720: Statistical Process Control DMAIC Problem Solving
Yellow Belt: Lean Workshop 3
Chapter 16: Global Sourcing and Procurement
Collaborative Approaches to Successful Shrinkage Management
Module 2: Supply Chain & Logistics Management
The Future Operating Model for NHS procurement
Network Optimization Executive Seminar Track 1, Session A
FMEA.
Failure Modes and Effects Analysis (FMEA)
Best Practices Consortium
PDCA Problem Solving Guide
OPS/571 Operations Management
Analyze Fishbone Diagram
GE 6757 TOTAL QUALITY MANAGEMENT
DMAIC Analyze, Improve, Control
Presentation transcript:

Introducing the ECR Road Map Dr Paul Chapman Cranfield School of Management

The ECR Road Map Call to Action 2. Map & Measure 4. Develop Solutions 5. Implement 6. Evaluate 1. Plan 3. Analyse Source: Beck, A., Bilby, C.A.L., Chapman, P.A. and Harrison, A., (2001) Shrinkage: Introducing a Collaborative Approach to Reducing Stock Loss in the Supply Chain, ECR Europe: Brussels.

The ECR Road Map Call to Action 2. Map & Measure 4. Develop Solutions 5. Implement 6. Evaluate 1. Plan 3. Analyse

Call to Action – 1 pager Foregone IncomeAdditional Costs Sell more… …more often… … at higher margin Variable costs: Fixed costs: Others: Sales opportunity = €Cost opportunity = € Scope:

Call to Action - Example Foregone IncomeAdditional Costs Sell more… –Wider product range –More store locations …more often… –OSA –Frequent ordering –Increase footfall … at higher margin –Trade up shoppers –New product lines Reduced Shrink Reduced expenses –Fixtures Less Inventory Sales opportunity = €15mCost Saving = € 2m Scope = Hot product lines / all stores

The ECR Road Map Call to Action 2. Map & Measure 4. Develop Solutions 5. Implement 6. Evaluate 1. Plan 3. Analyse Source: Beck, A., Bilby, C.A.L., Chapman, P.A. and Harrison, A., (2001) Shrinkage: Introducing a Collaborative Approach to Reducing Stock Loss in the Supply Chain, ECR Europe: Brussels.

90% 100% Number of SKUs Cumulative Losses 8% of SKUs account for 30% of loss 20% of SKUs account for 50% of loss Concentrate on ‘Hot Products’

Project Charter – 1 Pager Which Products? Process Scope (from where to where?) Performance measures and improvement target –Shrinkage - ?? % –Sales + ??% Time Table –Start date –First results –Project completion

Project Charter – 1 Pager Which Products? –Hot Products Process Scope (from where to where?) –Store operations in hot stores Performance measures and improvement target –Shrinkage - 50 % –Sales + 20% Time Table –Start datenow! –First resultsnext week –Project completion3 months

Board of Directors (Shareholders) Colleagues Logistics Service Providers Consumers Customers Suppliers Regulatory/ Government Bodies Project Identify Stakeholders

Stakeholder Analysis – 1 pager People or Groups Affected Names Level of Commitment Enthusiastic Support Help It Work Compliant Hesitant Indifferent Uncooperative Opposed Hostile

The ECR Road Map Call to Action 2. Map & Measure 4. Develop Solutions 5. Implement 6. Evaluate 1. Plan 3. Analyse Source: Beck, A., Bilby, C.A.L., Chapman, P.A. and Harrison, A., (2001) Shrinkage: Introducing a Collaborative Approach to Reducing Stock Loss in the Supply Chain, ECR Europe: Brussels.

Distribution Node Store Tesco DC, Hungary Gillette Pack Centre, UK Gillette DC, Hungary Tesco store, Hungary Supply Chain Overview

Break seal in yard Back lorry on to dock Unload pallets on to dock Check number of pallets Attach pallet label Move pallet to warehouse location Check pallet references Receive products Put away in warehouse Pick order then marshal pallets Load pallets into lorry Dispatch to Carrefour Dist. Ctr Supply chain process hierarchy Supplier DC Retailer DC Retailer Store Supply ChainSiteProcess Steps

Map Process Detail Lorry Arrives Check Paperwork & Seal Unload Delivery Sign for delivery Close & Seal Lorry

Retailer DC Supplier DC Retailer Store Measure Basic Inputs and Outputs of Every Site

The ECR Road Map Call to Action 2. Map & Measure 4. Develop Solutions 5. Implement 6. Evaluate 1. Plan 3. Analyse Source: Beck, A., Bilby, C.A.L., Chapman, P.A. and Harrison, A., (2001) Shrinkage: Introducing a Collaborative Approach to Reducing Stock Loss in the Supply Chain, ECR Europe: Brussels.

FMEA: Risk Assessment Step 1. Identify the failure modes in each step of the process –In your group brainstorm for 1 minute per step –Capture every idea on a separate PostIt Note Step 2. Score each failure mode –Use the S / O / D scoring scale S = severity O = likelihood of occurrence D = likelihood of detection Step 3. Brainstorm the causes of the highest scoring risk –Use the fishbone diagram

Risk Assessment Table – 1 pager Process Step Potential Failure Mode(s) Potential Effect(s) of Failure SOD RPN

Risk Analysis Scoring S 1 Single item 2 Case / inner pack 3 Crate / shipper carton 4 Pallet / dolly 5 Lorry load O 1Yearly or less 2Monthly 3Weekly 4Daily 5Hourly D 1Detectable prior to event 2Detect as it happens 3Detect at end of day 4Detect at end of period 5Not detectable

FMEA Example Process Step Potential Failure Mode(s) Potential Effect(s) of Failure SOD RPN Goods moved to secure store- room Key is lost Store goods in hall 2316 Lock Broken Free access2112 Door not locked Free access25440 No room in store- room Store goods in hall Measures Effect S everity Measures Failure & Effect O ccurrence Measures Failure D etection

Fishbone Diagram Visual way to represent the relationship between a failure mode and possible causes Every failure mode will have several causes

Failure mode People Materials MachinesMethods Fishbone Diagram – 1 pager

Door not locked People Materials Lock broken Don’t care, not important MachinesMethods Unclear instructions Lost key Forgot Key holder on holiday Late delivery to store Other jobs took priority Fishbone Diagram Example

Analysis Summary Process Step Potential Failure Mode(s) Potential Effect(s) of Failure SODRPN Goods moved to secure store- room Door not lockedFree access25440 No room in store- room Store goods in hall24324 Door not locked 1. FMEA 2. Fishbone

The ECR Road Map Call to Action 2. Map & Measure 4. Develop Solutions 5. Implement 6. Evaluate 1. Plan 3. Analyse Source: Beck, A., Bilby, C.A.L., Chapman, P.A. and Harrison, A., (2001) Shrinkage: Introducing a Collaborative Approach to Reducing Stock Loss in the Supply Chain, ECR Europe: Brussels.

Action Planning Improvement / Potential Opportunity ($) High Low Slow/HardFast/Easy Ease of Implementation Change Project Quick Win Major Initiative

The ECR Road Map Call to Action 2. Map & Measure 4. Develop Solutions 5. Implement 6. Evaluate 1. Plan 3. Analyse Source: Beck, A., Bilby, C.A.L., Chapman, P.A. and Harrison, A., (2001) Shrinkage: Introducing a Collaborative Approach to Reducing Stock Loss in the Supply Chain, ECR Europe: Brussels.

Been There, Done That? Attributes of Poor Projects Attributes of Good Projects 1.List the attributes of projects you have worked on 2.Highlight the key differences between poor projects & good ones

ECR Road Map Principles Collaborate and engage all stakeholders Focus effort on the processes: Products / Information / Money Identify greatest oppportunities then target root causes Remove the opportunity for loss or error Evaluate & learn

ECR Road Map Benefits Ensures the right resources and people engaged Better and more sustainable results Less daunting More cost efficient Higher probability of success Quicker to implement Lessons can be reapplied to other problems

The End (or the beginning ….)