MSHA APPROVAL PROCESS Steven Luzik Chief, Approval and Certification Center Chief, Approval and Certification Center.

Slides:



Advertisements
Similar presentations
Safety Absolutes Green Lake
Advertisements

Amateur Radio Technician Class Element 2 Course Presentation
Respiratory Protection and the Role of NIOSH
Surface Mine Safety Regulation 25 PA Code Chapter 209.
Underground Storage Tanks at Duke Duke Medical Center –8 permitted USTs located on medical campus –Range in size from 2,000 gallons to 30,000 gallons Proper.
Tips to a Successful Monitoring Visit
Independent Laboratory Testing PART 6 Regulations Wayne Colley Electrical Safety Division Electrical Engineer.
Safety & Communication in the Dark Created by Pat Gazewood
September 9, Electrical Safety Division Testing and Evaluation of Electrical Equipment Independent Laboratory Part 6 Workshop.
TurnKey Project Management Services Capabilities Briefing.
U.S. Pretrial Services and Probation Office Northern District of Ohio.
This presentation is for illustrative and general educational purposes only and is not intended to substitute for the official MSHA Investigation Report.
Have We Really Learned From Our Mistakes? Jon Montgomery Ken Heintz Kevin Jones.
VETERANS BENEFITS ADMINISTRATION AVECO July 14 – 18, 2014 Centralized Certification.
1 OSHA FEDERAL OCCUPATIONAL SAFETY AND HEALTH ACT (OSHA) OF 1970 George Mason University College of Nursing and Health Science Regulatory Requirements.
[Federal Register: June 17, 2003 (Volume 68, Number 116)] [Rules and Regulations] [Page ]
ELECTRICAL SAFETY / E N V I R O N H & S T R A I N I N G P R O G R A M ELECTRICAL SAFETY OSHA requires that electrical equipment be approved for use and.
Communication and Tracking Technologies MSHA Communication and Tracking Workshop March 17, 2010.
Multi-Mode Two-Way Radio Communication and Tracking System for Use Under Emergency and Operational Conditions in Underground Mines Presented by Stolar.
Communications CHAPTER 14. Communications Systems and Components Communication Components.
Confined Spaces in Construction: Applicable Standards Stan Liang, CIH, CSP, CET KTA-Tator, Inc.
Moscow, 2013 Dr. Elena Stroganova Director of Test Laboratory of Telecommunication and Broadcasting Equipment.
THIRD-PARTY CERTIFICATION IN THE UNITED STATES Presented by: Joan Sterling.
Independent Laboratory Testing PART 6 Regulations Mechanical & Engineering Safety Division Robert Setren Mechanical Engineer.
MSHA COMMUNICATIONS AND TRACKING GUIDANCE PPL Stakeholders Meeting.
Session 6: Data Integrity and Inspection of e-Clinical Computerized Systems May 15, 2011 | Beijing, China Kim Nitahara Principal Consultant and CEO META.
Chapter 14: Inspection and Maintenance
Educational Field Services 30 CFR Part CFR Part Training Responsible Persons Emergency Evacuations.
Fire Fighter Fatality/Injury SCBA Evaluation Overview Thomas Pouchot General Engineer National Institute for Occupational Safety and Health National Personal.
Control of Airborne Respirable Dust Hazards: A Training Program for Underground Coal Miners The Penn State Miner Training Program University Park, PA
Managing Air Quality Data 101 Presented by: Chris Bellusci & Claire Lund, PE (Sanborn Head) International Conference for Environmental.
UN ECE Sectoral Initiative on Equipment for Explosive Atmospheres 7 September 2011 United States Department of Labor Mine Safety and Health Administration.
Successful Propositions Regarding Policies and Programs to Improve Mine Safety and Health Conditions John P. Faini MSHA – Technical Support Chief, Approval.
Bud Page Electrical Engineer Electrical Safety Division.
Communications and Tracking Approvals Past – Present - Future MSHA Communications and Tracking Workshop March 17, 2010.
NMA/MSHA Approval Workshop MSHA Approvals Approval and Certification Center May 21 and 22, 2008.
How Force Directions were Determined Distortions of other structures such as Wire Mesh (shown here) were used to determine direction of forces. Severity.
MATTHEW MATKOVICH MINE EQUIPMENT COMPLIANCE SPECIALIST QUALITY ASSURANCE & MATERIALS TESTING DIVISION MSHA – APPROVAL & CERTIFICATION CENTER 30CFR, PART.
Final Rule SEALS April 18, Overview § Seal Strengths, Design Applications, and Installation § Seal Strengths, Design Applications,
Slide 1 1 Explanation of ITTF Communications initiatives and the use of IREACH for health departments.
NMA/MSHA Approval Workshop Electrical Safety Division Approvals May 21 and May 22, 2008.
Topic 7 - Electricity in the Home Transmission of Electricity Power Grid Transformers are used to change the amount of voltage with hardly any energy loss.
MSHA Increased Emphasis on Improved Implementation of Surveys at MNM Mines.
Implementation of MINER Act for Communication and Tracking Using MSHA’s Program Policy Letter (PPL) P09-V-01 as Guidance Salwa El-Bassioni Electrical Engineer.
RESPONSIBLE PERSON TRAINING. Review of § Emergency Evacuations.
VERMONT COMMUNICATIONS (VCOMM) March 2, 2006.
Mine Rescue Team Communication System. Characteristics Medium Frequency Inductive Radio Components MSHA Approved Easy to Deploy Battery Powered.
AMERICAN COAL MINE SAFETY
IAEC Reliability Webinar Presented by: Regi Goodale and Ethan Hohenadel December 11,
What Documentation Needs to be Submitted With an Approval Application?
DO YOU UNDERSTAND MINE EMERGENCIES? ARE YOU PREPARED FOR A MINE EMERGENCY? MARK C. RADOMSKY The Pennsylvania State University.
MSHA / Coal Mine Inspector Training Terry L. Bentley Acting Deputy Administrator.
Inspection Directions: An EMS Approach to Inspecting for Section 608 and 609 Compliance.
End Station A Test Beam (ESTB) Carsten Hast and Mauro Pivi August 23 th 2012 Proposals, Procedures, Schedule.
MSHA / Coal Mine Inspector Training Terry L. Bentley Acting Deputy Administrator Rubin Pajoohan Fartak International Engineering co.
General Licensing Class Voice Operation Brookhaven National Laboratory Amateur Radio Club.
The Emergency Communication Triangle. What Communication Devices are Underground Here. Mine phones Land line telephones Leaky feeder radios Block light.
RIHES-II: H ANDLING A UDITS AND I NSPECTIONS E FFECTIVE D ATE 25 D ECEMBER 2006 V ERSION : 3.0 บุญเหลือ พรึงลำภู 15 มกราคม 2557.
Jim Smith CONFINED SPACE Understanding the Space Park Requirements.
POWER FLUCTUATIONS Computer Systems. Power Fluctuations Voltage is the force that moves electrons through a circuit Unsteady voltages are called power.
OTC Pres Project Del P5 12/08 Page 1 Project Delivery Performance Improvement Report to the Oregon Transportation Commission Jeff Gower, State Construction.
Why are we wearing blinders? MSHA’s Failure to account for technological advances in mining Presented to West Virginia Coal Association Annual Mining Symposium.
Miners Rights Rights & Responsibilities Under the Mine Safety & Health Act of 1977 NC DOL Mine & Quarry Bureau Mine Safety & Health Training Revised 2010.
Fundamental Concepts for Design of Special Hazard and Fire Alarm Systems Chapter 1.
Start the program by pressing “enter”.
THUM Adapter Impact on Hazardous Area Classification
Hazardous Areas & Hazards of Electricity
Electrical Safety Standards
Training Responsible Persons Educational Field Services
Miners Rights Rights & Responsibilities Under the Mine Safety & Health Act of 1977 Introduce topic. Hand out Miner’s Rights Booklets. Mine Safety & Health.
Presentation transcript:

MSHA APPROVAL PROCESS Steven Luzik Chief, Approval and Certification Center Chief, Approval and Certification Center

What Does “Approved” Mean ? Official notification from MSHA that the device under consideration has met the requirements of the applicable part ( Part 23 – telephones and signal devices). No probable explosion hazard under normal operations when used in gassy or dusty atmospheres. In the case of communication equipment MSHA has no performance requirements. Not an endorsement by the Agency.

CATEGORIES OF UNDERGROUND EQUIPMENT/PRODUCTS Outby equipment does not require MSHA approval. Outby equipment does not require MSHA approval. Equipment intended to be used inby is required to be MSHA approved.

MSHA APPROVED EQUIPMENT/PRODUCTS Communication equipment (hand-held radios, mine page phones, longwall face communication systems, leaky feeder communication systems, etc.) Other instrumentation (noise meters, electrical measurement instruments, dust monitors, etc.)

MSHA APPROVED COMMUNICATION SYSTEMS Mine Page Phones Leaky Feeder Systems Hand Held Portable Radios Other Communication Devices

MINE PAGE PHONES MSA Loudmouth Page Phone Gai-tronics Model Mine Dial Page Phone Conspec part No Paging Receiver Pyott-Boone Model Nos. 118 and 119 Page Phone Mine Safe Electronics Communication IIA Mine Phone

LEAKY FEEDERS “Leaky Feeder" systems are two-way radio systems that feature a base station on the surface that communicates with individual underground radio units, such as walkie-talkie radios. To allow radio frequencies to function underground, it is necessary to replace a standard surface antenna system with a cable network. The cable is designed to "leak" signal, which allows radio transmissions to both leak from the cable and also enter the cable. The systems are generally used for both data and voice communications.

LEAKY FEEDER SYSTEMS Mine Radio Systems (MRS) Flexcom Varis Mine Technologies Model IS Leaky Feeder Communication System DAC Type RFM 2000 Radio System El-Equip, Inc Model VHF-1 Radio System

HAND-HELD TWO-WAY COMMUNICATION DEVICES Motorola HT1000 and MT2000 –It’s no longer available MSHA is currently evaluating a couple of two way radios for approval

OTHER MSHA-APPROVED COMMUNICATION DEVICES Mine Site Technologies PED Cap Lamp/Pager - approved for use on MSA, Koehler and NLT cap lamps [Part 19 Electric Cap lamps] Mine Site Technologies Tracker IV TAG System – RFID transmitter device approved under IS standards [Part 18.68] Intrinsic safety

MSHA APPROVAL PROCESS FOR TELEPHONES AND SIGNALING DEVICES Title 30 Code of Federal Regulations Part 23 –Must be explosion-proof or intrinsically safe –Must be supplied with back-up power supply in the event of a power outage –Entire system must be IS or XP in the event of a loss of ventilation

MSHA APPROVAL PROCESS Applicant submits: –Application letter –Drawings and specifications –QA Information Fee estimate and authorization Assigned investigator reviews for compliance with 30 CFR If necessary, sends discrepancy letter

MSHA APPROVAL TESTING AND EVALUATION 30 CFR Part 6 permits MSHA to accept test and evaluation results conducted by independent laboratories (e.g. UL and FM) Products/equipment must be inspected against submitted documentation Currently looking at equivalent standards in their original form or with enhancements as alternatives to our Approval requirements [ IS and X/P]

MSHA QUALITY ASSURANCE REQUIREMENTS Approval-holder responsible for producing products in accordance with approved drawings and specifications MSHA Post-approval product audit program After receiving equipment/products, owner is responsible for maintaining in accordance with MSHA approval

For Specific Information on Application Requirements and Approval Standards visit: or contact Dave Chirdon (304)

Thank You for Your Attention!