L2 Online Reinhard Schwienhorst DAQ shifters meeting, 03/12/02.

Slides:



Advertisements
Similar presentations
J. Linnemann, MSU 4/15/ Global L2 Outputs (and inputs) James T. Linnemann Michigan State University NIU Trigger Workshop October 17, 1997.
Advertisements

Ignore errors in this “Server” window Is there a popup window about a memory error? If so, restart monitoring Can you see in this window the program running.
L1CAL Online Software Philippe Laurens 31-May-2005.
D0 Collaboration Meeting July 2002 L2: The Road Ahead James T. Linnemann MSU D0 Oklahoma Workshop July 9, 2002 Special Thanks to Terry Toole for status.
Trigger Framework Tutorial Dan Edmunds Michigan State University 14-Apr-2009 The purpose of this talk is to present the general features of the Trigger.
1 DØ trigger system 3 levels L1 deadtimeless L1 deadtimeless L2 100  s L2 100  s L3 farm, 50 Hz L3 farm, 50 Hz Brown involvement L2 STT L2 STT L1CTT.
Summary Ted Liu, FNAL Feb. 9 th, 2005 L2 Pulsar 2rd IRR Review, ICB-2E, video: 82Pulsar
CFT Calibration Calibration Workshop Calibration Requirements Calibration Scheme Online Calibration databases.
The procedure to replace CALO rectifier (AC/DC converter) 1.
Data Acquisition Software for CMS HCAL Testbeams Jeremiah Mans Princeton University CHEP2003 San Diego, CA.
13 January All Experimenters’ MeetingAlan L. Stone - Louisiana Tech University1 Data Taking Statistics Week of 2003 January 6-12 We had to sacrifice.
CAL DQM SHIFT TODO and RELATED MATERIAL T. Schörner-Sadenius Hamburg University CAL Meeting, 13 October 2004.
Left Side Equipment Stack with HPA Inverter at bottom. Set the inverter to Mode 2. Right Side Equipment Stack with modems with Inverter at bottom. Set.
BOE/BME – MDT: DCS For the 2 BOE, DCS needs to handle 2 x 2 HV (1 ch/multilayer) 2x LV 2x JTAG, associated 2 MDMs/ELMBs Monitoring of T, B and CSM sensors.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester April 1, 2013.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester July 8, 2013.
LKr Calorimeter Control and monitoring R. Fantechi 19/02/2010 R. Fantechi.
Group Electronique Csnsm AGATA SLOW CONTROL MEETING 19th fev AGATA PROJECT PREPROCESSING MEZZANINE SLOW CONTROL GUI FOR THE SEGMENT AND THE CORE.
Status of NA62 straw electronics and services Peter LICHARD, Johan Morant, Vito PALLADINO.
Claudia-Elisabeth Wulz Institute for High Energy Physics Vienna Level-1 Trigger Menu Working Group CERN, 9 November 2000 Global Trigger Overview.
Cluster Finder Report Laura Sartori (INFN Pisa) For the L2Cal Team Chicago, Fermilab, Madrid, Padova, Penn, Pisa, Purdue.
André Augustinus 10 September 2001 DCS Architecture Issues Food for thoughts and discussion.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester June 17, 2013.
Offline shifter training tutorial L. Betev February 19, 2009.
L3 DAQ the past, the present, and your future Doug Chapin for the L3DAQ group DAQ Shifters Meeting 26 Mar 2002.
Status of Global Trigger Global Muon Trigger Sept 2001 Vienna CMS-group presented by A.Taurok.
CAL DQM REPORT T. Schörner-Sadenius Hamburg University CAL/HES Meeting, 4 January 2005.
A.Golunov, “Remote operational center for CMS in JINR ”, XXIII International Symposium on Nuclear Electronics and Computing, BULGARIA, VARNA, September,
25-May-03 jadzia warchol, ext. 8341, phone Calibration of FPD detector Content Page General2 Calibration 3 Taking data (Calibration or Pedestal.
V.Sirotenko, July Status of Online Databases Currently there are 2 online Oracle Databases running on d0online cluster: 1.Production DB, d0onprd,
1 ECS CALO HV Control CALO Piquet Training Session Anatoli Konoplyannikov /ITEP/ Outline  ECS HV control of the ECAL/HCAL sub-detectors.  Introduction.
17 February All Experimenters’ MeetingAlan L. Stone - Louisiana Tech University1 Data Taking Statistics Week of 2003 February Dedicated some.
CAL SHIFT MARCH 2004 Thomas Schörner-Sadenius Hamburg University CAL Meeting DESY 24 March 2004 Think carefully whether you consider being on shift.
M. Weber, AEM 4/5/041 Weekly report 3/29-4/4 Delivered:7.7pb -1 Recorded:6.3pb -1 (82%) 12.6M events.
All Experimenters MeetingDmitri Denisov Week of July 16 to July 22 D0 Summary  Delivered luminosity and operating efficiency u Delivered: 1.6pb -1 u Recorded:
L3 DAQ Doug Chapin for the L3DAQ group DAQShifters Meeting 10 Sep 2002 Overview of L3 DAQ uMon l3xqt l3xmon.
Part I – Shifter Duties Part II – ACR environment Part III – Run Control & DAQ Part IV – Beam Part V – DCS Part VI – Data Quality Monitoring Part VII.
DQM SHIFT TODO REMINDER T. Schörner-Sadenius Hamburg University CAL Meeting, 18 January 2005.
DØ Online16-April-1999S. Fuess Online Computing Status DØ Collaboration Meeting 16-April-1999 Stu Fuess.
D0 Status: 01/14-01/28 u Integrated luminosity s delivered luminosity –week of 01/ pb-1 –week of 01/ pb-1 –luminosity to tape: 40% s major.
All Experimenters MeetingDmitri Denisov Week of July 7 to July 15 Summary  Delivered luminosity and operating efficiency u Delivered: 1.4pb -1 u Recorded:
February 07, 2002 Online Monitoring Meeting Detector Examines Should aid in: 1.Diagnosing problems early and getting it fixed 2.Making decisions on the.
June 17th, 2002Gustaaf Brooijmans - All Experimenter's Meeting 1 DØ DAQ Status June 17th, 2002 S. Snyder (BNL), D. Chapin, M. Clements, D. Cutts, S. Mattingly.
Arnd Meyer (RWTH Aachen) July 18, 2003Page 1 Data Taking July 11 – 18 Store # BeginLumDuration 2774Thu 15:373.3E hrs 2780Fri 20:403.6E hrsTRF4.
System Online August 20, :54:07 CET 8 th Annual CEENet Network Technology Workshop.
1 L1CAL for DAQ Shifter By Selcuk Cihangir 3/20/2007 Representing L1CAL group (slides from many people)
Online monitor for L2 CAL upgrade Giorgio Cortiana Outline: Hardware Monitoring New Clusters Monitoring
Pixel DQM Status R.Casagrande, P.Merkel, J.Zablocki (Purdue University) D.Duggan, D.Hidas, K.Rose (Rutgers University) L.Wehrli (ETH Zuerich) A.York (University.
1 User guide for Muon shifter part 2 : control of LV, HV, TELL1 Preliminary version 9-July-08 (to be checked by Michela) I have simply put together the.
DCS Instructions K. Grogg, M. Weinberg, M. Grothe 1/24/20161.
All Experimenters MeetingDmitri Denisov Week of September 9 to September 16 D0 Summary  Delivered luminosity and operating efficiency u Delivered: 4.0pb.
All Experimenters MeetingDmitri Denisov Week of September 2 to September 8 D0 Summary  Delivered luminosity and operating efficiency u Delivered: 3.9pb.
目录 12 in 1 Sensor Features ● PIR motion sensor ● Ultrasonic sensor ● LUX sensor ● Temperature sensor ● 2 Dry contacts ● 2 external condition inputs ● IR(infrared)
J. Linnemann, MSU 2/12/ L2 Status James T. Linnemann MSU PMG September 20, 2001.
Jet/MET Trigger On-Call Report Ricardo Gonçalo – LIP Jet Trigger Meeting – 31/3/2015.
All Experimenters MeetingDmitri Denisov Week of December 23 to December 30 D0 Summary  Delivered luminosity and data taking efficiency u Delivered: 5.8pb.
Online Consumers produce histograms (from a limited sample of events) which provide information about the status of the different sub-detectors. The DQM.
FPD SOFTWARE TEST MOTIONS / CONNECTIONS / CONFIGURATION / SOFTWARE / TESTS / CONCLUSION Lionel Peyrichoux 14 March 2001.
1 ECS CALO HV Control CALO Piquet Training Session Anatoli Konoplyannikov /ITEP/ Outline  ECS HV control of the ECAL/HCAL sub-detectors.  Introduction.
Calorimeter global commissioning: progress and plans Patrick Robbe, LAL Orsay & CERN, 25 jun 2008.
K. Grogg University of Wisconsin RCT shift report 8 – 15 October 2008 K. Grogg Next shifter: C. Lazaridis 17 March RCT shift report.
Arnd Meyer (RWTH Aachen) July 21, 2003Page 1 Data Taking July 14 – 20 Day∫L dt (del)∫L dt (rec)Efficiency Mon 956nb nb % Wed 111nb nb.
1 Top Level of CSC DCS UI 2nd PRIORITY ERRORS 3rd PRIORITY ERRORS LV Primary - MaratonsHV Primary 1 st PRIORITY ERRORS CSC_COOLING CSC_GAS CSC – Any Single.
General online meeting SLAC Nov 4, 1999 G.Crosetti, M.Lo Vetere, E.Robutti IFR online calibrations status and plans.
Arnd Meyer (RWTH Aachen) Aug 1, 2003Page 1 Data Taking July 25 – Aug 1 Store # BeginLum [cm -2 s -1 ]Duration 2817Thu 22:354.0E hrs 2821Sat 1:513.8E31.
Arnd Meyer (RWTH Aachen) Sep 8, 2003Page 1 Integrated Luminosity Total data sample on tape with complete detector > 200pb -1.
Multifunctional Sensor
Offline shifter training tutorial
Online Software Status
K. Grogg, M. Weinberg, M. Grothe
Presentation transcript:

L2 Online Reinhard Schwienhorst DAQ shifters meeting, 03/12/02

Reinhard Schwienhorst, MSU Introduction L2 online crates: –Currently reading out l2muc, l2muf, l2cal, l2gbl –L2 is not making any decisions yet –Mark (and pass) L2 is in stable online running –Included in most global runs –L2 experts on-call rather than on shift –Code development/testing in parallel

Reinhard Schwienhorst, MSU L2 Connections

Reinhard Schwienhorst, MSU Current L2 Inputs Central muon, l2muc, 0x21: –All front-end muon channels available > 100 channels –Inputs from L1 muon not used yet Forward muon, l2muf, 0x22: –Most front-end muon channels available >40 channels Typically one problematic channel –Inputs from L1 muon not used yet CAL, l2cal, 0x23: –2 out of 10 fibers from L1 Cal –Relatively stable

Reinhard Schwienhorst, MSU Other L2 inputs All L2 crates get SCL Global, l2gbl, 0x20 –Inputs from L2 pre-processors –Gets L1 decision bits (128-bit mask) from TRGFR Currently disables Important restriction: TRGFR sends bits for every L1 accept Means L2 needs to be in every run, pdaq and sdaq PS, l2ps, 0x24 and CTT, l2ctt, 0x25 –Some time this spring/summer

Reinhard Schwienhorst, MSU

Current L2 input list Inputs to L2 crate global (l2gbl, 0x20) –Configured L2 pre-processors 0x21 – 0x23 Inputs to L2 crate central muon (l2muc, 0x21) –Muon readout crates 0x34 – 0x3B Inputs to L2 crate forward muon (l2muf, 0x22) –Muon readout crates 0x30 – 0x33 Inputs to L2 crate calorimeter (l2cal, 0x23) –L1 Cal 0x10

Reinhard Schwienhorst, MSU L2 experts 9 people who know how to debug L2 Expert on-call carries a pager –(630) –Give them a few minutes to call back –Be available when they call back Also have a secondary pager –In case the expert on-call is away from a phone Check L2 contacts web page or control room call list

Reinhard Schwienhorst, MSU Typical L2 problems L2 crate X is shown missing in every event! –Check if all its inputs are in the run –Talk to the muon shifter if it’s 0x21 or 0x22 Usually a front-end muon channel has gone bad –Send a few SCL inits –Contact the DAQ expert on-call –Contact the L2 expert on-call –Take the crate out of the run For now Also send an to

Reinhard Schwienhorst, MSU Other L2 problems Rack M324 tripped –Happened twice last week and twice in January –Symptoms: VRC3d not responding RMI Alarm –Check which RMI light is off Rick Hance wants to know Also check if blower is still on –Turn the rack back on Instructions are on the back of every L2 rack –Contact L2 expert Needs to reboot Linux and start L2 program

Reinhard Schwienhorst, MSU Outlook L2 will be making decisions in N weeks Will have L2 monitoring displays –Shows which input channel is missing Extended COOR functionality –L2 crate configuration and global scripts –Switch L2 decisions on/off –Make sure all required inputs are in the run Less thinking required