Burbank Bob Hope Airport Replacement Terminal and Opportunity Site Development October 28, 2013.

Slides:



Advertisements
Similar presentations
Regional Priorities Q300. Below are different priorities that have been identified for the future of the San Diego region. Please rate their importance.
Advertisements

Salt Lake City Downtown Transportation Master Plan Light Rail & Bus; Presentation Background and Introduction August 23, 2006.
1.0 Item: Northside Development and Destination Lindberg Study Impacts: The possibility of acquiring Marine Corps Recruit Depot land and building terminal,
Module 3 SMART PARKING. Module 3 Smart Parking Introduction This is one of seven Transit Oriented Development training modules developed by the Regional.
THE CALIFORNIA WIN-WIN PROJECT: OPPORTUNITIES ASSOCIATED WITH A SAN DIEGO AREA REGIONAL AIRPORT IN THE IMPERIAL VALLEY Lars Perner, Ph.D. San Diego State.
Airport planning.
Cheyenne Regional Airport New Airport Terminal Project December 1, 2011.
DRO AIRPORT TERMINAL EXPANSION Alliance Presentation – April 2013.
Equitable Transit Oriented Development the Denver perspective.
1 FY 11 Airport Budget Recommendations. 2 Aviation Department Mission Statement To provide a safe and secure air transportation system that is economically.
Lecture 9: Hub-and-Spoke Operations
Farmland Preservation is essential to our Polk County lifestyle.
Terminal Design. Some thoughts from Mark Day (LEX)… Expansions are greatly limited based on the initial configuration. Similar comments to planning must.
Airport Planning Issues International Conference on Modern Airport Management Steven Urlass Office of Airports National Planning Division.
Station Development Update Melissa DuMond, Director of Planning and Integration April 29, 2015.
Air Transportation A Management Perspective
The Roll of Cairo International Airport City in the Future of the Egyptian Economy The Roll of Cairo International Airport City in the Future of the Egyptian.
COMSTAC Launch Operations Support Working Group October 24, 2006 Jim Ball Spaceport Development Manager NASA Kennedy Space Center Spaceport Development.
Implementing a Blended Model System to Forecast Transportation and Land Use Changes at Bob Hope Airport 15 th TRB National Transportation Planning Applications.
Anaheim Regional Transportation Intermodal Center Project Update.
SEATTLE LIGHT RAIL STATION AREA PLANNING City of Seattle Station Area Planning in Seattle SEATTLE LIGHT RAIL STATION AREA PLANNING.
October 4, 2004 Detrich B. Allen City of Los Angeles Environmental Affairs Department 1 Siting New Development Detrich B. Allen General Manager Environmental.
Module 3 SMART PARKING 1. Module 3 Smart Parking Goals for Smart Parking Balance parking supply and demand Consider innovative parking management policies.
August 2004 Hickory by Choice Linking Land Use and Air Quality Planning.
Port Financial Management Challenges Financing Freight Transportation Improvements St. Louis, Missouri April 29 to May 2, 2001 Financing Freight Transportation.
AMG 1204 Airport Management By Zuliana Ismail, 2010.
Mark Phillips BSDA/Metro Long-Range Planner. The Foundation: Moving Transit Forward.
Beyond the Environment: Socio- Economic Sustainability & Meaningful Community Input in Land Use Decisions Sarah Muller March 7 th, 2008.
1 MidTown Office Tower former Red Carpet Inn Site Presentation February 12, 2011.
Presentation to ***(group) on ***(date) 1.  Cities - 11  Highway districts – 3  Ada and Canyon Counties  School districts – 2  Valley Regional Transit.
San Antonio Airport System Overview Presented to the Airport Ground Transportation Association September 13, 2010.
VICTORY CENTER, TSA and WHAT IT MEANS FOR EISENHOWER WEST JONES LANG LASALLE CITY OF ALEXANDRIA ALEXANDRIA ECONOMIC DEVELOPMENT PARTNERSHIP September 11,
Management Short Course January 2012 Future Airport Terminals Trends in Terminal Design.
TRB Session January 23, 2007 Transportation Research Board Session Lessons Learned from Large Airport Development “Orlando Airport Experience”
Planning & Community Development Department Conditional Use Permit #5029 and Other Land Use Entitlements: Final Environmental Impact Report and Statement.
Small and Large Airport Concession Agreements March 2013.
Lecture 9: The Economic & Political Role of Airports By: Zuliana Ismail.
Overview Presentation Fall 2015 Gainesville-Haymarket Extension Study.
II. Facility Program, A. Providers HOUSTON INTERMODAL CENTER/MULTIMODAL TERMINAL.
Priority Development Areas Ursula Luna-Reynosa, Economic Development Director David Kleinschmidt, Public Works Director November 3, 2011.
An inside look at Airport Design
Economic Studies Diego Klabjan. Airbus 380 In 2007 O’Hare ready for A380 Infrastructure –Runway/taxiway modifications –Size and passenger effect on terminals.
GRTC Bus Rapid Transit Project July 17, Agenda 1.BRT Concept 2.Project Goals 3.Project Benefits 4.Project Corridor 5.Proposed Multimodal Access.
Magic Valley Regional Airport Terminal Expansion and Remodel Magic Valley Regional Airport Terminal Modification Feasibility Study.
DeSoto Hampton Corridor Revitalization Overview of Mixed Use Development.
Port of Bellingham Briefing BELLINGHAM INTERNATIONAL AIRPORT MASTER PLAN BRIEFING April 2014.
Industry Briefing 25 May 2016.
Environmental Impact Report (EIR) Update May 2, 2016.
Columbus Airport Authority We’re Really Taking Off! November 6, 2002.
Planning & Community Development Department Contract to provide Environmental Consulting Services for the Rehabilitation and Reuse of the Pasadena YWCA.
Approve the purchase of right of way and easements for Kimball Avenue Improvements from the properties at 1030 North Kimball Avenue, 2149 East Highland.
Works of Art: Redeveloping Properties for Cultural Reuse Harvester Artspace Lofts Council Bluffs, Iowa Tina Hochwender – City of Council Bluffs.
South Waterfront Greenway Design Guidelines Portland Design Commission Briefing April 3, 2008.
The 14-Gate Replacement Terminal Project at Hollywood Burbank Airport Presentation to the Construction Management Associates of America (CMAA) May 26,
1 TIF 9 (Trinity River Vision) Expanded and Updated Project and Financing Plans December 8, 2009 Presented to the City Council Jay Chapa Housing & Economic.
ARCH – 4601 Feasibility Study Presentation
CE 2303 Railways, Airports & Harbor Engineering
Collaborative Decision Making Module 5 “The Collaborative Environment”
Regional Roads Committee
Program Financial Management
Concept Plan for Proposed Park Near Hopewell School
Transportation Research Board
Airport engineering.
City Council Meeting September 17, 2018
Moving Forward with Positive Change
William Huang Housing Director
Pierre Regional Airport Master Plan Update
Airline and Airport Procedures Baggage Handling and Control
Presentation transcript:

Burbank Bob Hope Airport Replacement Terminal and Opportunity Site Development October 28, 2013

The Goals Replace an 83 year old building with a safe, modern 14-gate terminal that meets current earthquake design standards and FAA standards for distance from the runways Provide the same conveniences and easy access that Burbank residents and air travelers now enjoy Provide additional amenities which the public has identified and are typically available in a modern airport terminal 2

The Goals Maximize the use of the former Lockheed Plant B6 site to develop a replacement terminal and create an economic engine for the region that takes advantage of vacant real estate and proximity of air and ground transportation. 3

Preliminary Terminal Concept Preliminary Terminal Concept Site Plan 6

What passengers and residents want Don’t “screw it up!” Don’t use local taxes to pay for it! 7

What passengers and residents want A variety of restaurants and concessions Larger spaces for TSA passenger and baggage security screenings Roomier baggage claim areas A larger ticket lobby and airline ticket counters 8

What passengers and residents want Adequate space for airline administrative, ramp, bag service, and ticket offices More room for airline baggage processing Additional restroom facilities and increased family restrooms Fully integrated designs for ADA accessibility 9

Terminal 10 Existing Terminal –14 Gates –6,631 Parking Spaces –210,599 SF Excludes Apron Space Uses Replacement Terminal Size –14 Gates –6,631 Parking Spaces –355,102 SF Net Increase = 144,503 SF (68.6% increase)

Space Summary 11 SPACE CATEGORYEXISTING TERMINAL Total Space REPLACEMENT TERMINAL Total Space DIFFERENCE AUTHORITY48,87335,615(13,258) PUBLIC49,28390,10740,824 CONCESSION17,10238,68321,581 AIRLINE COMMON (ENCLOSED) 42,14672,79230,646 AIRLINE COMMON (UNENCLOSED) 7,28428,60921,325 AIRLINE EXCLUSIVE18,91632,82313,907 SECURITY25,02345,39320,370 MECHANICAL / MISC1,97211,0809,108 TOTAL210,599355,102144,503

How Will the Burbank Bob Hope Airport Replacement Terminal Benefit the Region? 12

Tremendous Opportunity Invests $ M in local economy –funded by the FAA, airlines, and airport users –NOT Burbank taxpayers Creates a substantial number of terminal related jobs in construction, transportation, and services Attracts more companies and jobs to nearby Media District North 13

Tremendous Opportunity Preserves what is good about the Airport and makes it great – still convenient and friendly with: loading from front and rear of aircraft parking choices (close-in and remote parking) shorter walks single screening area improved baggage claim more amenities 14

Tremendous Opportunity Acts as a unique catalyst to attract a mix of highest and best uses and jobs to the adjacent 58-acre Opportunity Site Strengthens Burbank’s appeal as a growing media and hi-tech hub served by convenient air transportation in a modern terminal 15

Tremendous Opportunity Introduces Burbank, Glendale, Pasadena and the Valley to millions of airport passengers and visitors through a showcase new front door Mitigates traffic congestion with more rail and bus links to the Airport and adjacent commercial areas 16

Tremendous Opportunity Locks in place protections for Burbank residents by changing the Airport Authority’s governance rules to require not a simple majority vote but a “supermajority” vote (2 commissioners from each city) –for such actions as adding more gates or expanding the terminal ending the voluntary curfew or changing noise rules acquiring land 17

Process and Schedule October 29, 2013 –Burbank City Council Meeting to review the Proposed Configuration of a 14-gate Replacement Terminal and Opportunity Site Development scenario 18

Process and Schedule November 14, 2013 –Joint City and Airport Authority Meeting to consider approval of a general project description for a proposed 14-gate replacement terminal and associated airport improvements, as well as development scenarios for the 58 acre Opportunity Site. –This general description will then be used as the project description for study in the Environmental Impact Report. 19

Process and Preliminary Schedule End of CEQA Project Description and Public Scoping Meeting Early Completion of CEQA analysis and Public Comment Period Spring Completion of Required Approvals Mid Measure B Vote 20