The 1990s & 2000s. 1992 Church Building 1992 Church Platform.

Slides:



Advertisements
Similar presentations
St Andrews School A Tour Of The School By Daniella.
Advertisements

The Greenwood Apartments a partnership between Banc of America Community Development Corporation and Clearwater Neighborhood Housing Services, Inc.
.. 2 BHK and 3 BHK Apartments with world class amenities.
Presents. Clubhouse lower level Renovation December 2013.
Complete Custom Remodeling For all your remodeling needs All-Wood Cabinets Granite Countertops Laminate Countertops Cabinet Hardware Computer Designs.
Cathedral of the Immaculate Conception Project Information Session.
Building for Learning Project Photo Progress Report October 2009 Project commencement 21 st September 2009.
Park School Modernization Summer New paint, new glass, new landscape, new flagpole, and new paving Before After Entry.
Construction Update September 2014 Madison Elementary School District.
Kitchen New sandwich prep table. Kitchen New pizza prep table.
Alliant Energy Field Renovation. September 2005 Work area blocked off Pitching mound is flattened.
 Today, the church has 82 members plus a growing number of children and offers 5 Sunday school classes each week for children and adults, as well as.
A Vision for the Property James 4: Barn House This is what the property looked like when we closed in June. Garage Mt. Zion Road.
State of Wyoming Capitol Upgrades and Renovation projects Photos of the skylight and lighting project will be shown in chronological order, followed by.
PROJECT #1 Calvary Picnic Table Build Delivery, and Bike Repair Location: Calvary Home for Children, 110 Calvary Home Circle, Anderson, , Greg.
A Partial History of the Church First Congregational Church of Columbus was formed. Twelve members worshipped in a schoolhouse on Arlington Road.
Operation Build Progress What once was a dream, is now becoming reality. With the Grace of God, work on the Renovations and Educational wing of Second.
Announcements M.I.S.S.I.O.N. CHURCH OF GOD. Youth Lock-In at Laser Adventure Friday, January 29 10PM- 2AM Cost is $10.00 for youth age 8-17 All others.
Announcements M.I.S.S.I.O.N. CHURCH OF GOD. WE ARE GLAD YOU ARE HERE!
Scenes from Parsons Hall Renovation
How to update your kitchen for under $1,000. This is the before picture Here were some of the issues: –Kitchen has 30+ year old cabinets. The white dishwasher.
Church Building History Built in 1974 CBS Construction Total Footage: 5,800 Major & minor Remodel in 1994 and 2004: Sanctuary Dinner Hall 3 Classroom,
Building for Learning Project Photo Progress Report 3 October 2009 – November 2009 Project commencement 21 st September 2009.
Congregational Informational Meeting May 23, 2011 Statesboro First United Methodist Church.
Elevator Installation, Window Replacement, HVAC, Sprinklers, Block wall skimcoating (resident rooms & 1 st through 4 th floor resident corridors). New.
Finishing the Building
Trinity Lutheran Church Major Maintenance Tuesday, February 17, 2015.
Grace Bible Church Building Renovation Overview. Existing Floor Plan.
Kitchen ItemCostWhereStyle Sink Faucet$135 (paid)C-listBrushed stainless Sink ` Main Countertop Island Countertop Island Cabinet Cabinet hardware.
Master Plan Committee Report to Church Council August 26, 2008.
Martin Luther King Jr. Martin Luther King Jr. was born on January 15, 1929 in Atlanta, Georgia.
HOME MODEL. P e r s p e c t i v e HOME MODEL 4.00m X 5.50m Floor Area = 22 sqm. Turn-over unit 4.00m 5.50m 1.4m 4.00m.
BRVFD & RS Training Facility Proposal 05/07/2009.
Allen Park Presbyterian Church Facility Study
1Confidential 1 God’s Plan for Mt. Sinai Baptist Church Membership Spiritually Increase Growth of Church Increase Growth of Church Financially In Fellowship.
WELCOME TO Fallston United Methodist Church Experience God’s Grace In Worship Explore God’s Grace In Study Express God’s Grace In Outreach.
Garage Swimming pool Climbing frame Bike rake Car.
Facilities Modernization Program Funded by Measure B Project Report September 21, 2015.
October 15, 2012 Oakwood Presbyterian Church Feasibility Study Design Meeting 2 Copyright Hoffman Architecture /02/20121.
WELCOME TO Fallston United Methodist Church Experience God’s Grace In Worship Explore God’s Grace In Study Express God’s Grace In Outreach.
WELCOME TO Fallston United Methodist Church Experience God’s Grace In Worship Explore God’s Grace In Study Express God’s Grace In Outreach.
THE MESSAGE “WWJHMD” Pastor John Campbell. THE MESSAGE “WWJHMD” Pastor John Campbell.
Home looks better with us. Not staged Staged Start your home selling or remodeling project with a few questions…... Why do you think your house is not.
Program Planning August 27, /1/ Troop 125 Vision Troop 125.
Wilson County Baptist Association Special Needs Praise and Worship Day March 5 th 5:00 pm to 7:00 pm Immanuel Baptist Church.
Is this your idea of a kitchen??? The Architect or Interior Designer sees it differently. The Kitchen.
Administration Offices Proposed by: Wyatt Marvin and Mitch Sander.
1 Guinn School Restoration Update Presented by Transportation and Public Works Department February 17, 2009.
Bethany Room Pre-K Sunday School and general storage. Room is very long and has access from each end and from parlor. No closets. INVENTORY – CURRENT USEIMMEDIATE.
by: Maryam Musab Amine We use bricks and tiles to build a house. We use bricks to build the walls. We use tiles to build the floors. The bricks and tiles.
CityServeeCT.net Mission Strategy Organization
St Martin’s Projects “Welcomes you to know Christ and to make Him known” Renovation, Refurbishment & Maintenance Rectory Bathroom and study.
What’s with Time Square West? No. of Floors 43 Retail 1st and 2nd floor Parking 5 floors(2 basement, 3rd to 5th floor) No. of units 738 No. of parking.
6/3 Coworker Training Elder Andy Chen.
Redeemer Lutheran Church
Design your house the way it must be done!
Building Construction 1
Improvements for 2016 & 2017 Todd Harris Maintenance Manager
Ramar-Hall Addition: 2017.
2007 Bond Issue Capital Improvement Program
Volunteering Within Events
WELCOME TO WYALUSING PRESBYTERIAN CHURCH.
Minuteman Vocational Technical Regional High School Progress
Room to Grow.
Month Rainfall (mm) Temp Jan Feb March 34 April 38 May June July
Park Place Wesleyan Gala 2019
Phase II Committee Forrest Barber Johnny Davis Mike Hannon Brandon Harwood Kelly McKay Jim McCoy Becky Roberts.
Minuteman Vocational Technical Regional High School Progress
Mowrey Hall Renovation
Governors club interior renovation
Presentation transcript:

The 1990s & 2000s

1992 Church Building

1992 Church Platform

1993 Pathfinders bike ride

1993 picnic in the park after church

1993 Youth Group

1995 Pathfinders at Cedar Falls

April 1995 International Sabbath Pastor Lew and Robyne Gray and London Steverson

May – May Mirable turns 101

1996 – Inside of Church

1996 – Homework Assistance Program

1996 – Adventurers

1997 – Pastor Mitch Williams

1998 – Valentines Joe K’s

1998 – Kidspiration (children’s Sabbath School)

Kidspiration Song Service

Kid’s Night Out

We Need to Rebuild God’s House 1999

Before

Demolition Begins

Bev K, Clarice & John Murray Help remove bushes

Zach Tugui, John Murray & Wayne Lewis

Construction Begins

The men’s Restroom

The Women’s Restroom

A New Coat of Paint

Oct 2000 – Church Building

Time for the Interior April 2001

Lots of wood paneling

No more black plastic ceiling!

Interior Construction 2001

Inside construction

Temporary Setup in the Fellowship Hall

Linda B and Irene H help remove tile

Stage about to be lowered

What a difference some paint makes

Wires run under the floor

Looks great! But it was a little bare the first week.

Fellowship Hall

Old sinks and countertops

Old stage and tables

New countertops

New Paint, floor and hardware

Cradleroll moves to Fellowship Hall while their room is remodeled Aug 2004

Old stage removed

Framing closets

Closets and stage

Finished! March 25, 2006

Dedication Sabbath 3/31/2006