MAINTENANCE DEPARTMENT Presented by: John Argabright, Maint. Supervisor Muskingum River Plant APP Site Visit October 30 – November 4, 2006.

Slides:



Advertisements
Similar presentations
An Introduction To Marine Steam Propulsion Plant [Source: US Navy]
Advertisements

Total Productive Maintenance
PERFORMING EFFECTIVE BUILDING SYSTEM RECOMMISSIONING STUDIES Joseph J. Watson, P.E. Booth # 312.
TYPES OF MECHANICAL SYSTEMS
Energy Efficiency and Intelligent Power Plants Rameshbabu R S 10 th May, 2006 The Center For Bits And Atoms MIT.
2012 ARIPPA Technical Symposium Steam Turbine Generator Maintenance for Optimized Availability David Branton, CEO Turbine Generator Maintenance, Inc.
Branford Board of Education Conservation Report Efforts and Results 2001-Present Mark Deming Facilities Director Branford Board of Education November 19,
THERMAL POWER PLANT.
Mechanical Engineering Department ME 322 Operation and Management of Power Plants Prof. Osama A El Masry Prof. Osama El Masry Load Curves.
SBREFRA Presentation Wayne Penrod Executive Manager, Environmental Policy Sunflower Electric Power Corporation.
New Generation Strategy
Initial Performance History - O&M Lessons Learned
Summer Co-op Experience: OPG Aditi Garg. Darlington Nuclear G.S Located in Bowmanville, ON.
One powerful future. Maintenance Considerations for Emergency Power Systems Ben Thomas Customer Services Manager.
1 Heat Exchangers. Standards of Conduct in Training 2.
POWER GENERATION TECHNOLOGIES
Steam Power Station Presented By Ashvin G. Patel Asst. Prof. (E.E.)
High Efficiency UTILITY RESCUE THE MEANS TO ABUNDANT SAFE CLEAN POWER.
ACADs (08-006) Covered Keywords Air compressors, aftercooler, afterfilter, moisture separator airflow. Description Supporting Material
Mark Studenic Energy Production Superintendent ENERGY PRODUCTION (OPERATIONS)
2013 NATEF Task Area A-7 Heating, Ventilation, and A/C A. A/C System Diagnosis & Repair B. Refrigeration System Component D & R C. Heating, Ventilation.
Gas Turbine Power Plant
Case 1: Optimum inspection and maintenance rates (wind turbine is available during inspection) Case 2: Optimum inspection and maintenance rates (wind turbine.
Multi-Stage Flash Desalination (MSF)
CHAPTER 4 CPB 20004: Plant Utility n Maintenance
Hawke’s Bay Refrigeration
Plant Engineering Programs Plant Engineering Programs Presented by: Duane Phleger, Manager Plant Engineering Programs APP Site Visit October 30 – November.
Thomas J. Crawford, PhD, PE November 08, 2013 A. Economics: Pay Back Period or Pay Back Time. ( MAY HAVE ERRORS, TYPOS !!) If we make this Investment to.
Automatic Tube Cleaning System for Condensers and Heath Exchangers
Plant Utility System (TKK-2210) 14/15 Semester 4 Instructor: Rama Oktavian Office Hr.: M-F
Practical Energy Conservation Tips for Steam Propulsion Ships.
ORAP ® New User Orientation March 4, 2007 Carlos Garcia Strategic Power Systems, Inc.
Unit 2 -Gas And Diesel Power Plants
Generating Stations. Bulk electric power is produced by special plants known as generating stations or power plants. Depending upon the form of energy.
STEAM POWER PLANTS.
Cost Impacts of Cycling Coal-Fired Power Plants
THERMAL POWER PLANT. INTRODUCTION : THERMAL POWER PLANTS CONVERT THE HEAT ENERGY OF COAL INTO ELECTRICAL ENERGY. COAL IS BURNT IN A BOILER WHICH CONVERTS.
A Presentation On Summer Training At SURATGARH SUPER THERMAL POWER STATION (6×250MW)
Thermal Power Station.
THERMAL POWER PLANT.
SURATGARH SUPER THARMAL POWER STATION
BOILER MOUNTINGS & ACCESSORIES
The Improvement of ALARA for the Steam Generator Maintenance Radiation Safety Department The 3 rd Plant, Ulchin Nuclear Power Site.
Presentation on Steam Power Plants R.C.Chaturvedi
Equipment Life Optimization Program (ELOP) Doug Hilleman February 10, 2011.
I Need A Space Heating System Let’s Look At A Central Steam Plant Option.
Prepared by : Nishant .A. Raval
L I NGAYA'S INSTT. OF MGT. AND TECHNOLOGY, FBD. THERMAL POWER PLANT OVERVIEW.
JSC UZBEKENERGOTAMIR A specialist enterprise with more than 45 years of experience in overhauling an maintenance. 1.
Introduction And Thermal Power Plant
Ontario SMART GREEN Program. Program Overview  SMART Green is a program funded by the Ontario Government to drive competiveness, energy efficiency and.
Humidity Measurement Benefits in Power Applications
Long-Term Planning Presented by: APP Site Visit Don Untch
Projects Status Report
PHOTO GALLERY Study Guide in PowerPoint to accompany Thermodynamics: An Engineering Approach, 7th edition by Yunus A. Çengel and Michael A. Boles.
Monika Topel, Björn Laumert kth, royal institute of technology
Thermodynamics Cycles.
Overhaul of Combustion Turbines Under NSR Regulations
Notre Dame Power Plant.
POWER PLANT THERMAL POWER STATION.
Desuperheater Heat Transfer Device Manufactured by Maniks
Managing Director (Bajaj Power Ventures Ltd)
Furnace Heat Transfer & Steam Generation
Auto Upkeep Basic Car Care, Maintenance, and Repair (2nd Edition)
Mathew C. Wright January 26, 2009
THERMAL POWER PLANT. A Thermal Power Plant converts the heat energy of coal into electrical energy. Coal is burnt in a boiler which converts water into.
The Improvement of ALARA for the Steam Generator Maintenance
Door Heat Exchanger: Specification
Presentation transcript:

MAINTENANCE DEPARTMENT Presented by: John Argabright, Maint. Supervisor Muskingum River Plant APP Site Visit October 30 – November 4, 2006

2

3 MAINTENANCE APPROACH Proactive Critical Equipment Condition Assessment - Facility Health Report - Generating Availability Data System (GADS) - Experience With Similar Series Units - Equipment Age - Operating History - Manufacturer Recommendations - Electric Power Research Institute Studies (EPRI ) Economic Justification - Spend Optimization - Project Management Review Group (PMRG)

4 MAINTENANCE APPROACH CONTINUED Outage Planning -Planning Horizon Facility Health Report – 10+ Years Long Range Plan – 10 Years - Outage Planning Frequency - Entire Unit - Major Components Duration Work Schedule

5 MAINTENANCE APPROACH Budgeting 2007 Operations and Maintenance Non Outage - $10,100,000 Outage - $8,000,000 Plant Production Blanket ( Capital ) Non Outage Installation Projects - $1,400,000 Non Outage Removal Projects - $560,000 Outage Installation Projects - $6,000,000 Outage Removal Projects - $2,400,000

6 TYPES of WORK Running Maintenance Forced Outage Scheduled Outage Predictive Maintenance Preventative Maintenance Corrective Maintenance

7 UNIT 5 AVAILABILITY Effective Forced Outage Rate (EFOR) 2.43% Maintenance Outage Factor (MOF) 0.00% Capacity Factor (Cap. Fac.) 83.44% Equivalent Availability (Eq.Avail.) 93.30% Unavailability (Unavail.) 6.07% Unavailabilty Target(Unavail.Tar.) 7.81% Note: Values based on first half of 2006 performance data

8 UNIT 5 MAINTENANCE ORGANIZATION 1- Mechanical Maintenance Supervisor 2 - Welders 1 - Machinist 3 - Mechanics 1- Instrument/Control/Electrical Supervisor 5 - ICE Senior Technicians 2 - ICE Junior Technicians

9 MAINTENANCE GOALS Anticipate equipment failure and repair or replace before it becomes a liability Apply best practices techniques Restore equipment to expected capacity and performance level Focus resources for best results Maintenance and capital expenditures Optimize planned outage time

10 EFFICIENCY RESTORATION Turbine-generator overhaul cycle HP / 1 st RH / 2 nd RH / LP – 8 / 8 / 8 /15 years 1 st and 2 nd RH turbine overhaul in 2003 regained 13 Kcal/kWh ( 50 BTU/kWh ) Cooling tower rebuild planned for 2008 Air heater baskets replaced in 2003

11 EFFICIENCY RESTORATION ( CONTINUED FROM PREVIOUS PAGE ) Condenser tubes cleaned every 6 years using scrapers.The cooling tower circulating water is chemically treated to prevent fouling. Applied Irathane coating on turbine exhaust hood to condenser expansion joints to reduce air inleakage in Retube main turbine condenser in 1998 due to tube leakage. Replaced high pressure heaters in 1995 due to leakage.

12 EFFICIENCY RESTORATION UNITS 1, 2, 3 and 4 Unit 3 LP turbine overhaul in 2005 regained 15 kcal / kWh ( 60 BTU / kWh ) Unit 2 HP / RH turbine overhaul in 2004 regained 19kcal /kWh ( 75 BTU / kWh ) Main condensers cleaned annually with scraper plugs due to using river water. Retubed units 1 and 2 crossover feedwater heaters in 1998 due to tube failures.

13 EFFICIENCY IMPROVEMENT Units 1, 2, 3 and 4 Extended sootblower lance tube length using RA330 material to increase boiler cleanliness. 8 kcal / kWh (30 BTU / kWh) Installed flexible hot side air heater seals Units 1 and kcal / kWh (10 BTU / kWh) Units 3 and 4 – 7 kcal / kWh (25 BTU/kWh) Unit 5 Use synthetic oil in pulverizer roll wheels to allow pulverizer outlet temperature to be raised from 66 C to 79 C (150 F to 175 F) for a gain of 3 kcal / kWh (10 BTU / kWh )